life cycle logistics fipt agenda introductions & agenda– bill kobren0800 – 0810 action item...

8
Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren 0800 – 0810 Action Item Review – Tom Simcik 0810 – 0820 Functional Advisor Comments –Jim Hall 0820 – 0830 CLM Development Status (Action Item 2-1) – Bruce Hatlem 0830 – 0845 LOG 206 Development Strategy Overview - Bo Gourley 0845 – 0915 LOG 304/ LOG 350 Review – Bo Gourley & Tony Scafati 0915 – 1000 BREAK 1000 – 1015 CNA LOG Competency Mgt Workforce Validation Survey – 1015 – 1100 Jonathan Higgins & Mr. Mark Tregar Logistics Human Capital Strategic Planning (HCSP) Status – 1100 – 1145 Carol Conrad & Michele Tibbitts LUNCH 1145 – 1230 Other DAU Curriculum Areas/Functional Area Initiatives (Contracting) – 1230 – 1300 Lenny Manning, DAU Contracting Center Director DAU Course Scheduling, Registration, Prioritization, Travel Funding, 1300 – 1345 & Demand Planning – Mark Whiteside & Ms Lisa Johnson Overview of Blooms & Kirkpatrick levels & How DAU Applies Them – 1345 – 1415 Dr. Judith Bayliss Integrated Framework Chart (“Wall Chart”) Revision – 1415 – 1445 Bill Kobren & Ms. Jill Garcia NGB Professional Development & Recruiting – Tom Drinkwater 1445 – 1515 Overview of External Knowledge Sharing Resources – Ms. Jill Garcia Time Permitting Open Discussion & Wrap-up – All 1515 – 1530 ADJOURN 1530

Upload: maud-harrington

Post on 14-Jan-2016

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

Life Cycle Logistics FIPT Agenda

• Introductions & Agenda– Bill Kobren 0800 – 0810• Action Item Review – Tom Simcik 0810 – 0820• Functional Advisor Comments –Jim Hall 0820 – 0830• CLM Development Status (Action Item 2-1) – Bruce Hatlem 0830 – 0845• LOG 206 Development Strategy Overview - Bo Gourley 0845 – 0915• LOG 304/ LOG 350 Review – Bo Gourley & Tony Scafati 0915 – 1000 • BREAK 1000 – 1015 • CNA LOG Competency Mgt Workforce Validation Survey – 1015 – 1100

Jonathan Higgins & Mr. Mark Tregar• Logistics Human Capital Strategic Planning (HCSP) Status – 1100 – 1145

Carol Conrad & Michele Tibbitts• LUNCH 1145 – 1230• Other DAU Curriculum Areas/Functional Area Initiatives (Contracting) – 1230 – 1300

Lenny Manning, DAU Contracting Center Director• DAU Course Scheduling, Registration, Prioritization, Travel Funding, 1300 – 1345• & Demand Planning – Mark Whiteside & Ms Lisa Johnson• Overview of Blooms & Kirkpatrick levels & How DAU Applies Them – 1345 – 1415

Dr. Judith Bayliss• Integrated Framework Chart (“Wall Chart”) Revision – 1415 – 1445

Bill Kobren & Ms. Jill Garcia• NGB Professional Development & Recruiting –Tom Drinkwater 1445 – 1515• Overview of External Knowledge Sharing Resources – Ms. Jill Garcia Time

Permitting• Open Discussion & Wrap-up – All 1515 – 1530• ADJOURN 1530

Page 2: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

Functional Advisor(Mr. Jim Hall, OSD LP&S)

NAVY ARMY AIR FORCE

FIPT Executive Secretary(Bill Kobren, DAU)

DACM (ASN RDA)(Jen Altomare)

DASN (Acq & Log)(CPT Kevin Redman)

DACM(Craig Spisak)

ASA(ALT)(Larry Hill)

DACM (SAF AQ)(Maj Ken Johnson)

HQ USAF A4R(Linda Sny)

USMC

DACM(Under US Navy)

MARCORSYSCOM(Kelly Gibson)

DLA(Lora Conrad)

DACM (AWCM)(Karen Clougherty)

OPNAV N4(Charles Borsch)

NAVAIR(Sonny Fann)

NAVSUP(John Goodhart)

Acq Log PLD(Tom Simcik)

PBL PLD(Bruce Hatlem)

Sustainment PLD(Bo Gourley)

NAVSEA(Tom McDonald)

HQ USAF A4M(Jean Martin)

Knowledge Sharing(Jill Garcia)

ISD(Dr Judith Bayliss)

HQDA G4 Log Pro(Linnea Kerins)

4th ESTATE

DCMA(John Deas)

DISA(Jay Alexander)

Army NISO(Dennis Tozser)

HQ AFMC(TBA)

HQ USMC(Ellen Nix)

USTRANSCOM(Diana Roach)

Joint Staff J4(CDR Leigh Ackart)

NGB(Tom Drinkwater)

USSOCOM(TBA)

Log Functional Reps

Leadership Team

DAU Reps

DACM Reps

Key

Life Cycle Logistics Functional IPT (FIPT)

Membership(as of 25 Oct 07)

Page 3: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

• Logistics Overview

– What is LCL– Who does LCL– Size & scope of Logistics enterprise

• Key Life Cycle Logistics Objectives Design for & Develop Support (Acquisition Logistics) & Supporting the System (Sustainment)

– Influence product design for supportability– Establish the support system– Identify the support– Advocate the best design alternative– Influence detailed design– Foster Test & Evaluation (T&E) of support system– Acquire the support– Deploy system (includes support infrastructure)– Maintain readiness– Improve sustainability– Provide the support to the user– Improve the system and its support

• Traditional 10 ILS Elements – Maintenance Planning– Manpower & Personnel– Supply Support – Support Equipment– Technical Data – Training & Training Support – Computer Resources Support – Facilities – Packaging, Handling, Storage and Transportation – Design Interface

Logistics Topics in PM Courses (A.I. 3-6)

Page 4: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

FY07 Log CL module activity

New development (FIPT Priority) Responsible Status• (1) Joint Logistics CLL016; Live 22 Oct 07• (2) Leaning DoD Supply Chains w/APS Development pending• (3) DoD Distribution Process CLL017; Live Dec 06• (4) Tech Refresh (2 modules) Planning: Live 21 Dec

07

• Lead Free Electronics DMEA• Packaging & RFID DLA Source material 90%

final• CBM MR&MP• RCM MR&MP ECD Nov 2007• SLAMIS Army Content in development• DMSMS for Tech Professional DMSMS WG PMP, content

development, and presentation started

Page 5: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

FY08 Log CL Module Status

New development (FIPT priority) Responsible Status• (1) LC Mgt & Outcome Metrics Develop 3rd Qtr FY• (2) Log T&E Develop 1st Qtr FY• (3) LC Log for Rest-of-us Develop 2nd Qtr FY• (4) Performance Metrics Develop 4th Qtr FY

• Parts Management DSPO• Maint of Mil Material MR&MP• Depot Maintenance Capacity MR&MP Content in development• DSOR Determination MR&MP • Depot Maintenance for Execs MR&MP

Maintenance/Revision• CLL002 DLA Support to PM DLA CRs collected• CLL006 Depot Maint Partnering ADUSD Schedule Test server for CRs• CLL008 Designing for Support Schedule Test server for CRs• CLL015 Business Case Analysis Schedule Test server for CRs• CLL203 DMSMS DLA Essentials DLA Schedule Test server for CRs• CLL204 DMSMS Case Studies DLA Schedule Test server for CRs

Page 6: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

Logistics Topics in PM Courses (A.I. 3-6)

• Logistics Issues

– Life Cycle Costs– Life Cycle Perspective– Footprint– Designing for support– Early, up front logistics considerations– Data Rights– Emerging Issues

• Total Life Cycle Systems Management (TLCSM) & Life Cycle Management (LCM)

• Sustainment as a Key Performance Parameter (KPP & KSAs)

• Life Cycle Sustainment Outcome Metrics & 14 Enablers

• Performance Based Logistics (PBL)

• Logistics Workforce Development and Training

• DAU Logistics Tools & Resources

Page 7: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

Integrated Framework Chart

Page 8: Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments

Proposed LOG Changes to IFC

• ROE:– This is a DAU learning asset– No expansion of Vertical Real Estate – Consolidated changes/revisions from Center Directors only– Suspense: 30 Nov 07

• Will Recommend Changing:– “Logistics/Sustainment” to “Life Cycle Logistics/Sustainment”

• Will Recommend Adding: – Traditional Ten ILS Elements– 4 Life Cycle Sustainment Outcome Metrics (KPP/KSAs)

• Space Permitting, Will Propose Adding:– 14 Enablers of Life Cycle Sustainment Outcome Metrics– Supportability Analysis