lid case study design workshop example 2 mixed use ... · pdf fileby: marty wanielista and...

19
BY: MARTY WANIELISTA AND ERIC LIVINGSTON LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE DEVELOPMENT PROJECT August, 2016

Upload: dodan

Post on 05-Mar-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

B Y : M A R T Y WA N I E L I S T A A N D E R I C L I V I N G S T O N

LID CASE STUDY DESIGN WORKSHOP

EXAMPLE 2

MIXED USE DEVELOPMENT PROJECT

August, 2016

Page 2: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

ACKNOWLEDGEMENTS

• The Low Impact Design BMP workshops were presented on August 24

and 25, 2016 at the Escambia County Central Office Complex in

Pensacola.

• The Escambia County LID BMP Manual and the LID BMP Workshops

were funded in part by a Section 319 Nonpoint Source Management

Program Implementation grant from the U.S. Environmental Protection

Agency through an agreement/contract with the Nonpoint Source

Management Section of the Florida Department of Environmental

Protection.

Page 3: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

Existing Site

• 4.8 acre high intensity commercial shopping center

• 2 buildings, one fast food restaurant, auto sales office and lot

Redevelopment Proposal 1 – Conventional LU/stormwater management

• Commercial and restaurant with surface parking

• Onsite stormwater retention basin

Redevelopment Proposal 2 – Mixed use with LID stormwater

• Mix of commercial, office and townhouse dwellings

• Mix of LID BMPs

Level of Treatment – Impaired water body with TMDL

• Net improvement = post-development < pre-development – 10%

Page 4: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

Page 5: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT ORIGINAL SITE AND STORMWATER

Page 6: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE CONVENTIONAL REDEVELOPMENT

AND STORMWATER MANAGEMENT

Page 7: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE ALTERNATIVE REDEVELOPMENT

AND LID STORMWATER MANAGEMENT

What combination of LID BMPs do you want to use for stormwater treatment?

• Disconnect impervious area

• Florida-friendly landscaping

• Rainfall Interception trees

• Retention basin

• Rain garden (bioretention)

• Swales

• Pervious pavement

• Greenroof with cistern

• Rainwater harvesting

• Biofiltration systems

• Tree wells

Page 8: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE ALTERNATIVE REDEVELOPMENT

AND LID STORMWATER MANAGEMENT

Page 9: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

STORMWATER COMPARISONS

Page 10: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

STORMWATER TREATMENT COMPARISONS

Page 11: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

COST COMPARISONS

Page 12: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

ADDITIONAL BENEFITS

• Required load reductions were met with LID BMPs

• LID BMP Treatment Train included 0.42 acre rain garden

integrated into landscaping with 0.40 acre pervious pavement

and pavers, over 15 tree wells with 8 serving as interceptor

trees.

• Florida-friendly landscaping provides additional 3% TN load

reduction.

• Development density increased with LID BMP option, partly

from using Mixed Zoning and partly from the LID BMPs.

Page 13: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE REDEVELOPMENT

ADDITIONAL BENEFITS

• Required load reductions were met with LID BMPs

• LID BMP Treatment Train included 0.42 acre rain garden

integrated into landscaping with 0.40 acre pervious pavement

and pavers, over 15 tree wells with 8 serving as interceptor

trees.

• Florida-friendly landscaping provides additional 3% TN load

reduction.

• Development density increased with LID BMP option, partly

from using Mixed Zoning and partly from the LID BMPs.

Page 14: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE CASE STUDY - PENSACOLA RESULTS

Page 15: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE

CASE STUDY

PENSACOLA

WATERSHED

DATA

Page 16: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE CASE STUDY - PENSACOLA RESULTS

PERVIOUS PAVEMENT

Page 17: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE CASE STUDY - PENSACOLA RESULTSTREE WELLS

Page 18: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE CASE STUDY - PENSACOLA RESULTSRAIN GARDENS

Page 19: LID CASE STUDY DESIGN WORKSHOP EXAMPLE 2 MIXED USE ... · PDF fileby: marty wanielista and eric livingston lid case study design workshop example 2 mixed use development project august,

MIXED USE CASE STUDY - PENSACOLA RESULTS