Licence 61 - Field Development Infrastructure
-
2 PetroNeft Resources plc
WL and Lineynoye
Kondrashevskoye
Tungolskoye
Kiev-Eganskoye
PetroNeft Pipeline to Kiev-Eganskoye 60 km
Arbuzovskoye
Licence 61 Development Plan
Licence 61 Development Plan
2010 programme:
Construction of 60 km pipeline, oil processing/storage facilities completed
9 oil production wells drilled in 2010, commenced pipeline production in August
2011 programme:
Hydraulic Fracturing programme on 9 wells on Pad 1, 10 wells on Pad 2
12 new production wells drilled on Pad 2
Process facilities expanded to ±14,800 bpd
2012 programme:
Construction of 10 km pipeline to Arbuzovskoye and commence drilling of 10 to 15 new production wells at Pad 1
Possible Sibkrayevskoye delineation well
Future Plans
Incremental addition based on NPV analysis of Sibkrayevskoye, Kondrashevskoye, Tungolskoye , N. Varyakhskoye and other discoveries
N. Varyakhskoye Discovery
Sibkrayevskoye Discovery
0 12000 m
-
3 PetroNeft Resources plc
Licence 61 Facilities Development
Lineynoye Oil Field
Base Bazhenov Horizon Structure Map March 2012 – contour interval 10 m
0 1 2 3 4 5 6 km
Emtorskaya High
Arbuzovskoye Oil Field
212
E-303
L-9
L-8
L-1
L-6
K-1
K-2
K-2s
A-1
A-2
L-7
L-5 L-3
L-4
211
NV-1
Arbuzovskoye Pad 1 Facilities Transformer Station ESP Control Modules Well Test Separator Module Water Injection Manifold Module Pipeline to Lineynoye
Length 10 km – Diameter 273 mm Camp – up to 16 people
Kondrashevskoye Oil Field
Lineynoye Central Processing Facility Capacity - 14,800 bfpd Storage Capacity – 37,740 bbls Gas Power Generation - 3.350 MW Diesel Backup Power Generation – 1.0 MW Export Pipeline Capacity - 20,000 bopd
Length 60 km – Diameter 273 mm Lineynoye Camp – up to 60 people
60 k
m e
xpo
rt p
ipel
ine
-
4 PetroNeft Resources plc
Central Processing Facility Schematic
Notes
1. No gas dehydration
2. Oil stabilisation
3. Oil storage 4 days
4. Pumping 2 X 50%
5. No gas compression
6. Power supply - gas piston
engine generators
Meter
Boiler
(heater)
Pipeline
Gas Piston
Power
Generators
P2
2000 m3
P1
1000 m3
To Water Injection
Manifold
Water Storage
Tank 700 m3
Slug
Catcher
Gas
Separator
Heater Secondary
Separator
Vaporizer
High & Low
Pressure Flares
Oil Storage Tanks Primary
Separator
Pad 1
Wells
10 atm
16 atm
40° C
60 m³/hr
9,000 bpd
Well
Test
Separator
3 X 450 KW
P3
1000 m3
P4
2000 m3
2011
Expansion
Diesel
Backup
Generator
1,000 KW
Fuel Gas Filter
Settling
Tanks 50 m3
Filter
2011
Expansion
Current Design Capacity
740,000 tons/year
14,800 bfpd
2 X 1.0 MW
Generators
-
5 PetroNeft Resources plc
General Plan Production Facilities
N
2.2
31 17
1
9
7
4
24
18
27
2.1 3
10
33
5
6
8
12
12 21.1
21.1
21.1
21.2
21.6
22
21.4 21.5
16
21.3
21.3
19.6 19.5
19.3
19.4
19.2
19.1
20.1 20.2 20.3
25 14
13 32
23
15
Parking
Area
Fire Fighting
Equipment
Heaters
Separator
Control Room
Power
Switchboard
Fire Water
Tanks
Power Generators
Boiler Lab
Gas Flare
Emergency Flare
Pit
Storage Tanks
Pump
Station
Diesel Tanks
Foam Pump
28
Pipeline
Collection
4
2.1
2.2
Expansion 2011
1
-
6 PetroNeft Resources plc
Process Facilities September 2010
-
7 PetroNeft Resources plc
Separators, Gas Powered Generators and Heater
-
8 PetroNeft Resources plc
Additional Primary Separator - 2011
-
9 PetroNeft Resources plc
New 2011 Storage Tanks in Foreground
-
10 PetroNeft Resources plc
New 2011 Oil Heater Treater and Storage Tanks
-
11 PetroNeft Resources plc
New 2011 CAT Gas Generators in Foreground
-
12 PetroNeft Resources plc
Generators and Chemical Lab
-
13 PetroNeft Resources plc
Chemical Analytical Laboratory
-
14 PetroNeft Resources plc
Storage Tanks - 2012
-
15 PetroNeft Resources plc
Process Facilities July 2012
-
16 PetroNeft Resources plc
Flow Lines
-
17 PetroNeft Resources plc
Flow Lines
-
18 PetroNeft Resources plc
Well Test Separator
-
19 PetroNeft Resources plc
Data Collection – Well Test Module
-
20 PetroNeft Resources plc
Lineynoye Camp June 2010
-
21 PetroNeft Resources plc
Lineynoye Camp – May 2011
-
22 PetroNeft Resources plc
Lineynoye Camp – January 2012
-
23 PetroNeft Resources plc
Lineynoye Camp – July 2012
-
24 PetroNeft Resources plc
Licence 61 Facilities Development
Lineynoye Oil Field
Base Bazhenov Horizon Structure Map March 2012 – contour interval 10 m
0 1 2 3 4 5 6 km
Emtorskaya High
Arbuzovskoye Oil Field
212
E-303
L-9
L-8
L-1
L-6
K-1
K-2
K-2s
A-1
A-2
L-7
L-5 L-3
L-4
211
NV-1
Arbuzovskoye Pad 1 Facilities Transformer Station ESP Control Modules Well Test Separator Module Water Injection Manifold Module Pipeline to Lineynoye
Length 10 km – Diameter 273 mm Camp – up to 16 people
Kondrashevskoye Oil Field
Lineynoye Central Processing Facility Capacity - 14,800 bfpd Storage Capacity – 37,740 bbls Gas Power Generation - 3.350 MW Diesel Backup Power Generation – 1.0 MW Export Pipeline Capacity - 20,000 bopd
Length 60 km – Diameter 273 mm Lineynoye Camp – up to 60 people
60 k
m e
xpo
rt p
ipel
ine
-
25 PetroNeft Resources plc
Licence 61 – Arbuzovskoye Facilities Construction and Drilling Status
Production rig moved from Lineynoye Pad 3 and assembled
Drilling Tubulars in place for 10 wells
Cement, mud and chemicals in place for 10 wells
Diesel in place for 10 wells
Pipeline Construction – 10 km
Construction and Commissioning completed in Mid April
Operations commenced 16th April
Utilities Line Construction – 10 km
Construction and Commissioning completed 10th March
Transformers, test separator and water injection manifold moved from Pad 3
Arbuzovskoye Pad 1 drilling commenced 6th August
2012 - Facilities Construction and Drilling Status
-
26 PetroNeft Resources plc
Arbuzovskoye Drilling Supplies
Q1 2012 Winter Mobilisation and Construction
Production rig moved from Lineynoye Pad 3 and assembled
Drilling Tubulars in place for 10 wells
Cement, mud and chemicals in place for 10 wells
Diesel in place for 10 wells (400 tons)
New ESP cables for 8 wells
Arbuzovskoye Pad 1 drilling commenced 6th August
-
27 PetroNeft Resources plc
Arbuzovskoye Rig Construction
-
28 PetroNeft Resources plc
Arbuzovskoye Pipeline Construction
-
29 PetroNeft Resources plc
Arbuzovskoye Quarters Building
-
30 PetroNeft Resources plc
Arbuzovskoye Pad 1 – September 2012
-
31 PetroNeft Resources plc
Arbuzovskoye Pad 1
-
32 PetroNeft Resources plc
Arbuzovskoye Pad 1 – July 2012
-
33 PetroNeft Resources plc
Oil Fields / Prospects / Potential Prospects
3 1
2
14
16
8
9
6
22
13
12
11
10
7
17
21
19
20
24
23
15
4 5
18
North Sea
Block
Kiev Eganskoye
Oil Field Horizons Key: Cretaceous C
Upper Jurassic UJ
Middle/Lower Jurassic LJ
Map ref. Field/Prospect Horizon(s)
Oil Fields 1 Lineynoye Oil Field UJ 2 Tungolskoye Oil Field UJ 3 West Lineynoye Oil Field UJ
5 Kondrashevskoye Oil Field UJ 7 Arbuzovskoye Oil Field UJ
20 Sibkrayevskoye Oil Field UJ 8 North Varyakhskoye Oil Field UJ
Prospects 2 Tungolskoye West Lobe and North (2) UJ 4 Lineynoye Lower UJ
6 West Korchegskaya LJ 8 Upper Varyakhskaya UJ 9 Emtorskaya UJ
10 Emtorskaya Crown UJ 11 Sigayevskaya UJ 12 Sigayevskaya East UJ 13 Kulikovskaya Group (2) UJ
14 Kusinskiy Group (2) C, UJ, LJ 15 Tuganskaya Group (3) C, UJ, LJ 16 Kirillovskaya (4) C, UJ, LJ 17 North Balkinskaya UJ, LJ 18 Traverskaya C, UJ, LJ 19 Tungolskoye East UJ
Potential Prospects (Leads)
21 Emtorskaya North UJ 22 Sibkrayevskaya East UJ 23 Sobachya UJ 24 West Balkinskaya UJ
Followed by Southern Area
Initial Focus on Northern Area
Arbuzovskoye New Oil Field Discovery Quick tie-in to Lineynoye Facilities 2P Reserves 13.3 million bbls Under development
Sibkrayevskoye New Oil Field Discovery Well 370 (1972) showed by-passed pay Well 372 (2011) confirmed 12.43 m net pay 2P Reserves of 49.8 million bbls Needs further delineation
Emtroskaya High Extension of Lineynoye Field Huge unbooked reserve potential Needs further delineation
Tungolskoye Oil Field
Comprehensive Study underway Future tie-in to Lineynoye
Southern Prospects Log Reinterpretation shows missed pay in multiple
horizons – C, UJ, M/LJ Cretaceous and Lower Jurassic pay confirmed by
well tests in immediately adjacent blocks Exploration delayed due to focus on cash flow from
Northern Developments
0 12000 m
Licence 61
-
34 PetroNeft Resources plc
Arbuzovskoye Pad 1