  • Licence 61 - Field Development Infrastructure

  • 2 PetroNeft Resources plc

    WL and Lineynoye

    Kondrashevskoye

    Tungolskoye

    Kiev-Eganskoye

    PetroNeft Pipeline to Kiev-Eganskoye 60 km

    Arbuzovskoye

    Licence 61 Development Plan

    Licence 61 Development Plan

    2010 programme:

    Construction of 60 km pipeline, oil processing/storage facilities completed

    9 oil production wells drilled in 2010, commenced pipeline production in August

    2011 programme:

    Hydraulic Fracturing programme on 9 wells on Pad 1, 10 wells on Pad 2

    12 new production wells drilled on Pad 2

    Process facilities expanded to ±14,800 bpd

    2012 programme:

    Construction of 10 km pipeline to Arbuzovskoye and commence drilling of 10 to 15 new production wells at Pad 1

    Possible Sibkrayevskoye delineation well

    Future Plans

    Incremental addition based on NPV analysis of Sibkrayevskoye, Kondrashevskoye, Tungolskoye , N. Varyakhskoye and other discoveries

    N. Varyakhskoye Discovery

    Sibkrayevskoye Discovery

    0 12000 m

  • 3 PetroNeft Resources plc

    Licence 61 Facilities Development

    Lineynoye Oil Field

    Base Bazhenov Horizon Structure Map March 2012 – contour interval 10 m

    0 1 2 3 4 5 6 km

    Emtorskaya High

    Arbuzovskoye Oil Field

    212

    E-303

    L-9

    L-8

    L-1

    L-6

    K-1

    K-2

    K-2s

    A-1

    A-2

    L-7

    L-5 L-3

    L-4

    211

    NV-1

    Arbuzovskoye Pad 1 Facilities Transformer Station ESP Control Modules Well Test Separator Module Water Injection Manifold Module Pipeline to Lineynoye

    Length 10 km – Diameter 273 mm Camp – up to 16 people

    Kondrashevskoye Oil Field

    Lineynoye Central Processing Facility Capacity - 14,800 bfpd Storage Capacity – 37,740 bbls Gas Power Generation - 3.350 MW Diesel Backup Power Generation – 1.0 MW Export Pipeline Capacity - 20,000 bopd

    Length 60 km – Diameter 273 mm Lineynoye Camp – up to 60 people

    60 k

    m e

    xpo

    rt p

    ipel

    ine

  • 4 PetroNeft Resources plc

    Central Processing Facility Schematic

    Notes

    1. No gas dehydration

    2. Oil stabilisation

    3. Oil storage 4 days

    4. Pumping 2 X 50%

    5. No gas compression

    6. Power supply - gas piston

    engine generators

    Meter

    Boiler

    (heater)

    Pipeline

    Gas Piston

    Power

    Generators

    P2

    2000 m3

    P1

    1000 m3

    To Water Injection

    Manifold

    Water Storage

    Tank 700 m3

    Slug

    Catcher

    Gas

    Separator

    Heater Secondary

    Separator

    Vaporizer

    High & Low

    Pressure Flares

    Oil Storage Tanks Primary

    Separator

    Pad 1

    Wells

    10 atm

    16 atm

    40° C

    60 m³/hr

    9,000 bpd

    Well

    Test

    Separator

    3 X 450 KW

    P3

    1000 m3

    P4

    2000 m3

    2011

    Expansion

    Diesel

    Backup

    Generator

    1,000 KW

    Fuel Gas Filter

    Settling

    Tanks 50 m3

    Filter

    2011

    Expansion

    Current Design Capacity

    740,000 tons/year

    14,800 bfpd

    2 X 1.0 MW

    Generators

  • 5 PetroNeft Resources plc

    General Plan Production Facilities

    N

    2.2

    31 17

    1

    9

    7

    4

    24

    18

    27

    2.1 3

    10

    33

    5

    6

    8

    12

    12 21.1

    21.1

    21.1

    21.2

    21.6

    22

    21.4 21.5

    16

    21.3

    21.3

    19.6 19.5

    19.3

    19.4

    19.2

    19.1

    20.1 20.2 20.3

    25 14

    13 32

    23

    15

    Parking

    Area

    Fire Fighting

    Equipment

    Heaters

    Separator

    Control Room

    Power

    Switchboard

    Fire Water

    Tanks

    Power Generators

    Boiler Lab

    Gas Flare

    Emergency Flare

    Pit

    Storage Tanks

    Pump

    Station

    Diesel Tanks

    Foam Pump

    28

    Pipeline

    Collection

    4

    2.1

    2.2

    Expansion 2011

    1

  • 6 PetroNeft Resources plc

    Process Facilities September 2010

  • 7 PetroNeft Resources plc

    Separators, Gas Powered Generators and Heater

  • 8 PetroNeft Resources plc

    Additional Primary Separator - 2011

  • 9 PetroNeft Resources plc

    New 2011 Storage Tanks in Foreground

  • 10 PetroNeft Resources plc

    New 2011 Oil Heater Treater and Storage Tanks

  • 11 PetroNeft Resources plc

    New 2011 CAT Gas Generators in Foreground

  • 12 PetroNeft Resources plc

    Generators and Chemical Lab

  • 13 PetroNeft Resources plc

    Chemical Analytical Laboratory

  • 14 PetroNeft Resources plc

    Storage Tanks - 2012

  • 15 PetroNeft Resources plc

    Process Facilities July 2012

  • 16 PetroNeft Resources plc

    Flow Lines

  • 17 PetroNeft Resources plc

    Flow Lines

  • 18 PetroNeft Resources plc

    Well Test Separator

  • 19 PetroNeft Resources plc

    Data Collection – Well Test Module

  • 20 PetroNeft Resources plc

    Lineynoye Camp June 2010

  • 21 PetroNeft Resources plc

    Lineynoye Camp – May 2011

  • 22 PetroNeft Resources plc

    Lineynoye Camp – January 2012

  • 23 PetroNeft Resources plc

    Lineynoye Camp – July 2012

  • 24 PetroNeft Resources plc

    Licence 61 Facilities Development

    Lineynoye Oil Field

    Base Bazhenov Horizon Structure Map March 2012 – contour interval 10 m

    0 1 2 3 4 5 6 km

    Emtorskaya High

    Arbuzovskoye Oil Field

    212

    E-303

    L-9

    L-8

    L-1

    L-6

    K-1

    K-2

    K-2s

    A-1

    A-2

    L-7

    L-5 L-3

    L-4

    211

    NV-1

    Arbuzovskoye Pad 1 Facilities Transformer Station ESP Control Modules Well Test Separator Module Water Injection Manifold Module Pipeline to Lineynoye

    Length 10 km – Diameter 273 mm Camp – up to 16 people

    Kondrashevskoye Oil Field

    Lineynoye Central Processing Facility Capacity - 14,800 bfpd Storage Capacity – 37,740 bbls Gas Power Generation - 3.350 MW Diesel Backup Power Generation – 1.0 MW Export Pipeline Capacity - 20,000 bopd

    Length 60 km – Diameter 273 mm Lineynoye Camp – up to 60 people

    60 k

    m e

    xpo

    rt p

    ipel

    ine

  • 25 PetroNeft Resources plc

    Licence 61 – Arbuzovskoye Facilities Construction and Drilling Status

    Production rig moved from Lineynoye Pad 3 and assembled

    Drilling Tubulars in place for 10 wells

    Cement, mud and chemicals in place for 10 wells

    Diesel in place for 10 wells

    Pipeline Construction – 10 km

    Construction and Commissioning completed in Mid April

    Operations commenced 16th April

    Utilities Line Construction – 10 km

    Construction and Commissioning completed 10th March

    Transformers, test separator and water injection manifold moved from Pad 3

    Arbuzovskoye Pad 1 drilling commenced 6th August

    2012 - Facilities Construction and Drilling Status

  • 26 PetroNeft Resources plc

    Arbuzovskoye Drilling Supplies

    Q1 2012 Winter Mobilisation and Construction

    Production rig moved from Lineynoye Pad 3 and assembled

    Drilling Tubulars in place for 10 wells

    Cement, mud and chemicals in place for 10 wells

    Diesel in place for 10 wells (400 tons)

    New ESP cables for 8 wells

    Arbuzovskoye Pad 1 drilling commenced 6th August

  • 27 PetroNeft Resources plc

    Arbuzovskoye Rig Construction

  • 28 PetroNeft Resources plc

    Arbuzovskoye Pipeline Construction

  • 29 PetroNeft Resources plc

    Arbuzovskoye Quarters Building

  • 30 PetroNeft Resources plc

    Arbuzovskoye Pad 1 – September 2012

  • 31 PetroNeft Resources plc

    Arbuzovskoye Pad 1

  • 32 PetroNeft Resources plc

    Arbuzovskoye Pad 1 – July 2012

  • 33 PetroNeft Resources plc

    Oil Fields / Prospects / Potential Prospects

    3 1

    2

    14

    16

    8

    9

    6

    22

    13

    12

    11

    10

    7

    17

    21

    19

    20

    24

    23

    15

    4 5

    18

    North Sea

    Block

    Kiev Eganskoye

    Oil Field Horizons Key: Cretaceous C

    Upper Jurassic UJ

    Middle/Lower Jurassic LJ

    Map ref. Field/Prospect Horizon(s)

    Oil Fields 1 Lineynoye Oil Field UJ 2 Tungolskoye Oil Field UJ 3 West Lineynoye Oil Field UJ

    5 Kondrashevskoye Oil Field UJ 7 Arbuzovskoye Oil Field UJ

    20 Sibkrayevskoye Oil Field UJ 8 North Varyakhskoye Oil Field UJ

    Prospects 2 Tungolskoye West Lobe and North (2) UJ 4 Lineynoye Lower UJ

    6 West Korchegskaya LJ 8 Upper Varyakhskaya UJ 9 Emtorskaya UJ

    10 Emtorskaya Crown UJ 11 Sigayevskaya UJ 12 Sigayevskaya East UJ 13 Kulikovskaya Group (2) UJ

    14 Kusinskiy Group (2) C, UJ, LJ 15 Tuganskaya Group (3) C, UJ, LJ 16 Kirillovskaya (4) C, UJ, LJ 17 North Balkinskaya UJ, LJ 18 Traverskaya C, UJ, LJ 19 Tungolskoye East UJ

    Potential Prospects (Leads)

    21 Emtorskaya North UJ 22 Sibkrayevskaya East UJ 23 Sobachya UJ 24 West Balkinskaya UJ

    Followed by Southern Area

    Initial Focus on Northern Area

    Arbuzovskoye New Oil Field Discovery Quick tie-in to Lineynoye Facilities 2P Reserves 13.3 million bbls Under development

    Sibkrayevskoye New Oil Field Discovery Well 370 (1972) showed by-passed pay Well 372 (2011) confirmed 12.43 m net pay 2P Reserves of 49.8 million bbls Needs further delineation

    Emtroskaya High Extension of Lineynoye Field Huge unbooked reserve potential Needs further delineation

    Tungolskoye Oil Field

    Comprehensive Study underway Future tie-in to Lineynoye

    Southern Prospects Log Reinterpretation shows missed pay in multiple

    horizons – C, UJ, M/LJ Cretaceous and Lower Jurassic pay confirmed by

    well tests in immediately adjacent blocks Exploration delayed due to focus on cash flow from

    Northern Developments

    0 12000 m

    Licence 61

  • 34 PetroNeft Resources plc

    Arbuzovskoye Pad 1