liberator car
DESCRIPTION
An overview of how this idea would transform transportation.TRANSCRIPT
THE LIBERATOR CARRedefines transportation for the
21ST Century
2/19/20091
Redefines transportation for the21ST Century
Monomobile.com
Jay AndressAndy Webster
The Liberator Car
o Combines the best of Mass Transitwith the freedom of the automobile
o Solves many of the major problemsfacing Greater Cincinnati
2/19/20092
o Combines the best of Mass Transitwith the freedom of the automobile
o Solves many of the major problemsfacing Greater Cincinnati
The Liberator is a car that can travel on thestreet as well as an overhead track system
2/19/20093
The Track
32 feet wide and costing $10 million per mile, it has thesame vehicle capacity as an 18-20 lane expressway.
2/19/20094
32 feet wide and costing $10 million per mile, it has thesame vehicle capacity as an 18-20 lane expressway.
Vehicle
2/19/20095
Customer Benefits
Self-guiding while on the rail;driver can sleep, read, or workwhile vehicle speeds towards itsdestination.
Fast; 100+ mph travel with notraffic congestion.
Safe…computer guidanceeliminates driver error
elevated track eliminates weatherproblems.
Driver is free to go where he choosesDriver is free to go where he chooseswhen he chooses!!!when he chooses!!!
2/19/20096
Self-guiding while on the rail;driver can sleep, read, or workwhile vehicle speeds towards itsdestination.
Fast; 100+ mph travel with notraffic congestion.
Safe…computer guidanceeliminates driver error
elevated track eliminates weatherproblems.
Driver is free to go where he choosesDriver is free to go where he chooseswhen he chooses!!!when he chooses!!!
Benefits for Greater Cincinnati
Dramatically reduce traffic congestion
Dramatically reduce traffic fatalities
Reduce air pollution
Elevated track requires no new land acquisition
An economic benefit of over $26 million/day
2/19/20097
Dramatically reduce traffic congestion
Dramatically reduce traffic fatalities
Reduce air pollution
Elevated track requires no new land acquisition
An economic benefit of over $26 million/day
Next Steps
Systems analysis
Federal and State contacts
Funding for a 1-2 year testingprogram
Build a commuter rail
2/19/20098
Systems analysis
Federal and State contacts
Funding for a 1-2 year testingprogram
Build a commuter rail
2/19/20099