lhc - kek · 1- shim correction 0.13 toshiba 19 production 2 repeat toshiba full-scale 1 -0.56...
TRANSCRIPT
![Page 1: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/1.jpg)
LHC
2007.11.2 KEK
![Page 2: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/2.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 3: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/3.jpg)
LHC and Experimental Insertions
Circumference: 27 kmInjection Energy: 450 GeV (p)Collision Energy: 7+7 TeVPeak Luminosity: 1034 cm-2 sec-1
2*4 ExperimentalInsertions
* 450 GeV beam commissioninganticipated in May 2008.
And other insertions forRF, Dump, Cleaning
![Page 4: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/4.jpg)
Critical surface of NbTi (from Wilson textbook)
Critical current of best Cu/NbTi with
typical 3 T field shift at superfluid
helium (INFN-LASA lab, february 2000)
Critical current density vs field measured on
NbTi multiflamentray wire at 4.22 and 2.17 K
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
0 1 2 3 4 5 6 7 8 9 10 11 12
Btot (T)
Jc(A
/mm
2)
LHe HeII
LHC 1.9K ??
![Page 5: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/5.jpg)
Magnets CoolingScheme
Main dipole27.5*1232=34000 t 1.9K
![Page 6: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/6.jpg)
Magnets for Arc
MBMain Dipole
![Page 7: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/7.jpg)
•••
••
MQ : Main Quad
CERN- CEA collaboration
392Magnets for Arc
![Page 8: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/8.jpg)
Layout of Experimental Insertions
Dispersion suppressor Matching section Separation dipoles Finalfocus
IP
KEK, FNAL,LBL, CERN
BNL, BINPCERNCERN
IP
Magnet issues:- Aperture- Field quality- Alignment- Beam heat load
![Page 9: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/9.jpg)
56 mm ID coil
G = 200 T/m at 1.9 K
I = 5390 A
E = 64.3 kJ/m/aperture
Lmag = 2.4/3.4/4.8 m
• Two-layer, non-graded coil.
• Free standing collars, fully
supporting the forces.
• Two-in-one iron yoke.
86
![Page 10: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/10.jpg)
• Four-layer, graded shell coil.
• Free standing collars, fully
supporting the forces.
• Two-in-one iron yoke.
70 mm ID coil
G = 160 T/m at 4.5 K
I = 3620 A
E = 141 kJ/m/aperture
Lmag = 3.4
24
![Page 11: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/11.jpg)
Fermilab
(MQXB)
KEK
(MQXA)16+16
G = 215 T/m, Aperture = 70 mm ~ 9 TL= 5.5 or 6.37 mHigher Order Multipoles < 1 unit (10-4)Beam Heating: 5 ~ 10 W/m
5000
LHC
![Page 12: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/12.jpg)
The Low-Beta InsertionKey Elements to Achieve High Luminosity….
MQXA MQXB MQXAMQXB
6.372.985
5.5 5.52.715
6.37
MCBXAMCBXH/V
b3
b6
MCBXMCBXH/V
MQSX
1.0
TASB
MCBXMCBXH/V
Q3 Q2 Q1
MCSOXa3
a4
b4
DFBX
IP
• Quadrupoles: Low-Beta Triplet
Q1 & Q3 (MQXA): KEK Q2a & Q2b (MQXB): FNAL
Correctors: CERN• Cryostat Assembly
All done by FNAL• Feed boxes for the inner triplet
DFBX: LBNL
![Page 13: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/13.jpg)
CERN-US-KEK Collaborationfor the Low-Beta Insertions
CERNCorrectorsInstallation in the LHC tunnel
FNALMQXB: 16 + spareCryostats (assembly)
BNLSeparation Dipoles: 20
LBLDFBX: 8TAS&TAN: 4
KEKMQXA: 16 + spare
Correctors
Quad. cold masses
Cryostats
![Page 14: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/14.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 15: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/15.jpg)
![Page 16: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/16.jpg)
Design Features
• Four Layer Coils – Two 2-layer coils
– with current grading• Inner & outer SC cables• Higher J at outer coil
• Spacer-Collars– High-Mn steel
• Low & stable permeability
• Flux Return Yoke– Horizontally split
– Keyed structure• Pre-stress & mechanical support• Simple & cost-effective assembly
In
OutIn
InOut
Out
Inner Cable
Outer Cable
![Page 17: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/17.jpg)
Design Parameters:Final version
Field gradient 215 T/m Coil inner radius 35 m Yoke outer radius 235 mm Shell outer radius 245 mm Magnetic length 6.37 m Peak field in coil 8.63 T Current 7149 A Superc. load-line ratio 80 % Inductance 87.9 mH Stored energy 2.24 MJ Magnetic force per pole (octant) Fx 1.19 MN/m Fy -1.37 MN/m
![Page 18: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/18.jpg)
1-m Model R&D: In-house Fabrication
![Page 19: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/19.jpg)
1-m Model R&D: Training Quench
190
200
210
220
230
240
250
260
Model #1
Model #1a
Model #1b
Model #2
Model #3
Models #4 & #5
Fie
ld G
radie
nt
(T/m
)
Thermal cycle
Temp.: 1.88 K
Ramp Rate: 10 A/s
Energy Extraction: ~50 %
• Reach to 250 T/m for 1st model.• Exceeding 230 T/m for all models.• Coil design change for 3rd model and later.• Training memory after the thermal cycle.
![Page 20: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/20.jpg)
R&D Work
b6Re-tuned
b10Re-optimized
Reach250 T/m
Notes
0.00
0.01
0.01
0.00
0.03(0.00)
-0.90
-0.93(-0.98)
b10
Toshiba0.13Shim correction1-19
Production
Toshiba Repeat2
Toshiba-0.561Full-scaleProto
Toshiba-0.81 Reproducibility5
KEK-0.77 Reproducibility4
KEK(Toshiba)
-0.72(0.15)
Re-optimize3
KEK-1.62Repeat2
KEK-0.79(0.32)
Original11-m Model
b6ElectromagneticDesign
#
Achievement1-m model reached: 250 T/mFull-scale prototypes: Multiple tuned << 10-4
Optimization
b10 corrected
b6correctedwith shim
10-4
![Page 21: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/21.jpg)
Coil Winding
Courtesy of TOSHIBA
![Page 22: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/22.jpg)
Collaring Preparation
Courtesy of TOSHIBA
![Page 23: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/23.jpg)
Collaring
Courtesy of TOSHIBA
![Page 24: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/24.jpg)
Yoking
Courtesy of TOSHIBA
![Page 25: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/25.jpg)
Cylindering
Courtesy of TOSHIBA
![Page 26: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/26.jpg)
Assembly Complete
Courtesy of TOSHIBA
![Page 27: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/27.jpg)
MQXA Production and Tests
2004 6 20 19 1.9K
0
5
10
15
20
25
0 5 10 15 20 25 30 35 40
ProductionTested at KEK
Num
ber
of m
agne
ts
Month
Started 01-6
04-0103-0102-01
2004-6
![Page 28: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/28.jpg)
1.9 K:• Training quench 230 T/m230 T/m• Full energy dump @215 T/m• Fast Ramp test @150 A/s• Field Measurement• To reach 220 T/m w/o quench• Electrical Insulation Test 1.5 kV @ 4.2 K He-gas
Performance Test at KEK
Room Temperature:- Alignment- Field Gradient,- Error field
Room Temperature:– Alignment check– Field Gradient,– Error Field
Shipping Preparation @ TOSHIBA – Pressure Test– Electrical Test
MQXA from TOSHIBAKEK
24
FNAL
![Page 29: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/29.jpg)
Warm Measurement Setup
![Page 30: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/30.jpg)
Cold Test Station: Vertical Cryostat
Bore Inner TubeInsulation in Vacuum
He I 4.2K
1m Model Magnet
Void Capacity
Rotating Coil
Bore Outer Tube
Pressurized
He II 1.9K
Insulation in Vacuum
-Plate
Heat Exchanger
1.9K
![Page 31: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/31.jpg)
5000
5500
6000
6500
7000
7500
8000
8500
MQXA-P1
MQXA-01
MQXA-02
P1 Inner
P1 Outer
P2 Inner
P2 Outer
P3 Inner
P3 Outer
P4 Inner
P4 Outer
Full Dump by QPH
No Quench
0 5 10 15 20
Quench C
urr
ent
(A)
Quench History of MQXA-03
Feb. 2002 -
10A/sec, 1.9 K
1st Test Cycle 2nd Test Cycle
Run Number
215 T/m
230 T/m
Training Characteristics: MQXA-03
3 quenches to reach 215 T/m9 quenches to reach 230 T/mGood training memory after thermal cycle
Reach 220 T/m w/o quenchFull-energy dump w/ QPH at 215 T/m
![Page 32: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/32.jpg)
Summary of Quench Characteristics
5000
6000
7000
8000
QuenchNo Quench
Que
nch
Cur
rent
(A
)
MQXA-1 2 3 5 4
215 T/m
230 T/m
Quench Sequence
2b
Thermal cycle
Thermal cycle
7 106 9 8 111st T.C.
1912 13
Thermal cycle
14 15112nd
T.C.
16
Bore modification
17 18
0.0
2.0
4.0
6.0
8.0
10
12
14
#1 #2 #3 #5 #4 #2b
#7 #6 #9 #8 #10
#11(
1st)
#12
#13
#14
#11
#15
#16
#17
#18
#19
Straight-SectionLead-EndReturn-End
Num
ber o
f Que
nch
Tra
inin
g
Magnet NumberAll magnets reached 230 T/m.
![Page 33: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/33.jpg)
0.00126.36790.0651217.077227.9
0.00106.36750.0587201.736677.3
0.00096.36700.0581186.536134.4
0.00096.36420.0341101.013207.9
0.00106.36420.020063.4752011.3
0.00486.36320.009612.445392.3
StandardDeviation
AverageStandardDeviation
Average
Magnetic Length (m)Field Gradient (T/m)Current
(A)
MFM: Field Gradient & Mag. Length
Good reproducibility in the order of 10-4
19 units of MQXA
![Page 34: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/34.jpg)
MFM: Higher Order Multipoles
-0.2
-0.1
0
0.1
0.2
a6 a7 a8 a9 a10-2
-1
0
1
2
a3 a4 a5
Multipole-coefficients
an, units
-2
-1
0
1
2
b3 b4 b5 b6
Multipole coefficients
bn, units
-0.2
-0.1
0
0.1
0.2
b7 b8 b9 b10
units : 10000 An , Bn
Quadrupole B2
Generally good within reference values.But, large b4…
@216T/m
Skew
Normal
![Page 35: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/35.jpg)
MQXA
![Page 36: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/36.jpg)
MQXA Cryostating & Test at FNALMQXA
First Test of MQXA
![Page 37: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/37.jpg)
MQXA in LHC Tunnel
![Page 38: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/38.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 39: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/39.jpg)
2007.11.27 Dipole
![Page 40: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/40.jpg)
J-PARC
![Page 41: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/41.jpg)
![Page 42: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/42.jpg)
12 6MB(1232 ), MQ(392 ) 2007.3.124
![Page 43: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/43.jpg)
2007.4.26 Dipole
![Page 44: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/44.jpg)
![Page 45: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/45.jpg)
6 superconducting bus
bars 13 kA for B, QD, QF
quadrupole
20 superconducting bus
bars 600 A for corrector
magnets (minimise
dipole field harmonics)
42 sc bus bars 600 A for corrector
magnets (chromaticity, tune, etc….)
+ 12 sc bus bars for 6 kA (special
quadrupoles)
13 kA Protection
diodeTo be connected:
• Beam tubes
• Pipes for helium
• Cryostat
• Thermal shields
• Vacuum vessel
• Superconducting
cables
![Page 46: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/46.jpg)
LHC
web
Cavern
SectorInner Triplet
![Page 47: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/47.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 48: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/48.jpg)
Pt 3
Pt 4
Pt 5
Pt 6
Pt 7
Pt 8
Pt 1
Pt 2
Pt 1.8
Cryoplant DistributionPresent Version
Cryogenic plant
Warm CompressorStation
Upper Cold Box
Interconnection Box
Cold Box
Warm CompressorStation
Lower Cold Box
Distribution Line Distribution Line
Magnet Cryostats Magnet Cryostats
Cold Compressorbox
Warm CompressorStation
Cold Compressorbox
Warm CompressorStation
Shaft
Su
rfa
ce
Ca
ve
rnT
unnel
LHC Sector (3.3 km) LHC Sector (3.3 km)
1.8 K Refrigeration Unit New 4.5 K Refrigerator Ex-LEP 4.5 K refrigerator 1.8 K Refrigeration Unit
![Page 49: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/49.jpg)
Pt 3
Pt 4
Pt 5
Pt 6
Pt 7
Pt 8
Pt 1
Pt 2
Pt 1.8
Cryoplant DistributionPresent Version
Cryogenic plant
Warm CompressorStation
Upper Cold Box
Interconnection Box
Cold Box
Warm CompressorStation
Lower Cold Box
Distribution Line Distribution Line
Magnet Cryostats Magnet Cryostats
Cold Compressorbox
Warm CompressorStation
Cold Compressorbox
Warm CompressorStation
Shaft
Su
rfa
ce
Ca
ve
rnT
unnel
LHC Sector (3.3 km) LHC Sector (3.3 km)
1.8 K Refrigeration Unit New 4.5 K Refrigerator Ex-LEP 4.5 K refrigerator 1.8 K Refrigeration Unit
![Page 50: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/50.jpg)
Warm Compressor Station of 18 kW @ 4.5 K Cryoplant(Power Input ~4 MW)
![Page 51: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/51.jpg)
LHC 18 kW @ 4.5 K Cold Box
33 kW @ 50 K to 75 K 23 kW @ 4.6 K to 20 K 41 g/s liquefaction
![Page 52: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/52.jpg)
AtmosphericLN2 vaporizer
LN2 Storage at LHC Even Point
![Page 53: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/53.jpg)
–
–
–
–
0.3 MPa4.6 K
0.13 MPa,20 -30 K
WC
S
1.8
K R
efr
ige
rati
on
Un
it
LHe 1.8 K Q1.8K
CC
B
4.5 KRefrigerator
B
D
C
Cold
com
pre
ssors
Turb
lne
Adsor-bers
LHC SectorLoad The four-stage LHC cold compressors
1st stage IHI-Linde
![Page 54: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/54.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 55: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/55.jpg)
Incident I: HX buckling
MQXA MQXB MQXAMQXB
Q3 Q2A Q1
DFBX
Q2B
Outer shellInner tube
(copper corrugated)H-piece
30592.7 (RT)
30560.2 (1.9K)
MQXB
![Page 56: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/56.jpg)
Incident I: HX buckling
![Page 57: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/57.jpg)
MQXA MQXB MQXAMQXB
Q3 Q2A Q1
DFBX
Q2B
MQXBLBX
D1
Incident II: Magnet support failure
15cm
GFRP
![Page 58: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/58.jpg)
Incident II: Magnet support failureQ1 Q3
GFRPMQXAMQXB
Q2A Q1
MQXB
![Page 59: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/59.jpg)
Pressure Test after Modification at Pt. 8
25 bar for 1 hour
Succeeded
![Page 60: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/60.jpg)
RF Finger Problem
Plug-In Modules
![Page 61: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/61.jpg)
Damaged Plug-In Modules
Sector 7-8 450 damage
RF Finger Problem
![Page 62: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/62.jpg)
![Page 63: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/63.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 64: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/64.jpg)
But.........
![Page 65: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/65.jpg)
Cool-down to 1.9 K at sector 7-8
![Page 66: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/66.jpg)
Cool-down to 1.9 K at sector 7-8
![Page 67: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/67.jpg)
Current Schedule2006 10 2007
2008 5
2 incidents at InnerTripletRF finger
7-8 1.9K
![Page 68: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/68.jpg)
Outline
• LHC: Overview of Superconducting Magnet System• MQXA Development at KEK
– Design Overview– In-house R&D– Production, Test and Measurement
• Work for Magnet at CERN• Cryogenics System for LHC• Incidents and Failures• Hardware Commissioning• Summary
![Page 69: LHC - KEK · 1- Shim correction 0.13 Toshiba 19 Production 2 Repeat Toshiba Full-scale 1 -0.56 Toshiba Proto 5 Reproducibility -0.81 Toshiba 4 Reproducibility -0.77 KEK KEK (Toshiba)-0.72](https://reader033.vdocuments.mx/reader033/viewer/2022060922/60ad9cfae553bf2def517c72/html5/thumbnails/69.jpg)
LHC
Inner Triplet Incident
Sector78 1.9K LSSMain Dipole 1
Sector45 30K
3-4
RF Finger
Inner Triplet System (MQXA ) 2008 1