levan babukhadia

12
Levan Babukhadia D Collaboration Meeting, January 12 - 14, 2000, Fermilab http://www-d0.fnal.gov/~blevan Level 1 FPS Algorithm Revisited SUNY at Stony Brook

Upload: rhona

Post on 11-Jan-2016

57 views

Category:

Documents


0 download

DESCRIPTION

This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Levan Babukhadia

Levan BabukhadiaLevan Babukhadia

D Collaboration Meeting, January 12 - 14, 2000, FermilabD Collaboration Meeting, January 12 - 14, 2000, Fermilab

http://www-d0.fnal.gov/~blevan

Level 1 FPS Algorithm RevisitedLevel 1 FPS Algorithm Revisited

SUNY at Stony BrookSUNY at Stony Brook

Page 2: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

FPS ReadoutFPS Readout

16 FPS 22.5o -sectors4 layers of U- & V-strips

Shower: 144 U- & V-stripsMip: 103 U- & V-stripsSpecial: 72 U- & V-strips

Total max ~500 analog signals per FPS -sector

Two FPS -sectors Two Analog Front End (AFE) boards on a single VLPC cassette.High and Low SIFT thresholds set at AFE output (~doubles the # of analog signals).

Page 3: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

L1FPS ArchitectureL1FPS Architecture

L2 PSpp

8N

7N

6N

5N

D4N

DB 3N

DB 2N

DB 1N

F

P

SNORTH

DB 6S

DB 5S

DB 4S

DB 3S

DB 2S

DB 1S

F

P

S SOUTH DB 7S

DB 8S

16

16

N UL3

N V L3

S UL3

S V L3

L1ftp

L3

Page 4: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Truncation in L1FPSTruncation in L1FPS

Possible truncation problems at the Digital Daughterboard and the Collector boardTo address this question study cluster multiplicities in MC

AFE

AFE

FPS -wedge

FPS -wedge

DB

DB

DFE COL

to L1 via BC

Glink to L2

5

5

1

11

Max # of Clusters 18for L2

Max # of Clusters 48

Page 5: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Cluster Occupancies from MCCluster Occupancies from MC

Dijets + 2MB MC with full detector simulation

High SIFT threshold at 5 mips

Excellent agreement withprevious results ( DØ Note 3493 )

Page 6: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Cluster OccupanciesCluster Occupancies

Dijets + 2MB MC with full detector

simulation

Low SIFT threshold at 3 mips

ET: 5 - 10 GeV ET: 10 - 20 GeV

ET: 20 - 40 GeV ET: 40 - 500 GeV

Page 7: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Title:ps/di_et3_mip05_vclusters.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et4_mip05_vclusters.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et1_mip05_vclusters.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et2_mip05_vclusters.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Cluster OccupanciesCluster Occupancies

Dijets + 2MB MC with full detector

simulation

High SIFT threshold at 5 mips

ET: 5 - 10 GeV ET: 10 - 20 GeV

ET: 20 - 40 GeV ET: 40 - 500 GeV

Page 8: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Title:ps/djx6_et4_mip03_vstrips.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/djx6_et4_mip03_uclust_vs_vclust.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Dijets MC with 6 MBDijets MC with 6 MBTitle:ps/djx6_et4_mip03_vclusters.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/djx6_et4_mip03_vwidths.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Worst case: highestdijet Et 40-500 GeV

andlow SIFT threshold

at 3 mips

Also shows we aresafe at the Collector

board truncation

Page 9: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Title:ps/di_et3_mip03_vstrips.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et4_mip03_vstrips.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Strip MultiplicitiesStrip MultiplicitiesTitle:ps/di_et1_mip03_vstrips.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et2_mip03_vstrips.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Dijets + 2MB MC with full detector

simulation

Low SIFT threshold at 3 mips

ET: 5 - 10 GeV ET: 10 - 20 GeV

ET: 20 - 40 GeV ET: 40 - 500 GeV

Page 10: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Title:ps/di_et3_mip03_vwidths.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et4_mip03_vwidths.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Cluster WidthsCluster WidthsTitle:ps/di_et1_mip03_vwidths.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:ps/di_et2_mip03_vwidths.epsCreator:HIGZ Version 1.23/07Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Dijets + 2MB MC with full detector

simulation

Low SIFT threshold at 3 mips

ET: 5 - 10 GeV ET: 10 - 20 GeV

ET: 20 - 40 GeV ET: 40 - 500 GeV

Page 11: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

Proposed Changes in L1FPSProposed Changes in L1FPS

Knowing which - (0.2x0.2) triggertower the FPS cluster is associated withis one way to handle truncation without

introducing physics bias.

To achieve this, U- and V-signals mustbe handled by a single DFE DB

this requires some changes in the cableroutings between AFE and DFE.

Next, the trigger equations allow to dothe - “matching” of identified

U- and V-clusters.

As an example, EQ8 = V8 ( U9 U10 U11 ), when true, will unambiguously identify a cluster as belonging to the trigger tower 2 - 1

V8

U11

U10

U9

Page 12: Levan Babukhadia

DØ Collaboration Meeting, January 12 - 14, 2000, Fermilab Levan Babukhadia

SummarySummary

The MC studies indicate we do not have a problemin L1FPS DFE truncation at 18 H&L clusters.

Still, the proposed modifications in:

(a) cable routings between AFE and DFE to allow U-V “matching” in DFE DB

&(b) L1FPS DFE algorithm to allow the determination of the - trigger tower

assoiciation of the L1FPS cluster

are to be implemented.

As a result, the truncation is not expected to be a problem even in higher background environment during actual running.