leisure centre redevelopment public realm...leisure centre redevelopment public realm st mary’s...

4
Leisure centre redevelopment Public Realm Site and park masterplan 1 2 3 4 5 6 7 8 9 Buildings set within an extension of the St Mary’s Churchyard park New entrance plaza with opportunities to meet, rest, and play Enhanced connections to Brook Drive New shared plaza between buildings Net gain in trees Significant improvements to safety & security Significant enhancements to St Mary’s Churchyard park Key to plan: Leisure centre St Mary’s Residential Entrance plaza Shared surface Existing toddlers play area relocated Soft play area Existing play area Permeable paved path Extension to St Mary’s Churchyard park 1 2 3 4 5 6 7 8 9 Existing site plan

Upload: others

Post on 23-Jul-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Leisure centre redevelopment Public Realm...Leisure centre redevelopment Public Realm St Mary’s Churchyard Park 20% increase in the amount of grass in the park Changes to improve

Leisure centre redevelopment

Public RealmSite and park masterplan

1

2

3

4

5

6

7

8

9

• Buildings set within an extension of the St Mary’s Churchyard park

• New entrance plaza with opportunities to meet, rest, and play

• Enhanced connections to Brook Drive

• New shared plaza between buildings

• Net gain in trees

• Significant improvements to safety & security

• Significant enhancements to St Mary’s Churchyard park

Key to plan:

Leisure centre

St Mary’s Residential

Entrance plaza

Shared surface

Existing toddlers play area relocated

Soft play area

Existing play area

Permeable paved path

Extension to St Mary’s Churchyard park

1

2

3

4

5

6

7

8

9

S ubway

S FL 2.06

Treework Environmental PracticeThe Old RectoryPilgrims WayChew StokeBS40 8TT

Tel: 0117 2440012

Web: www.treeworks.co.uke.mail: [email protected]

Tree Constraints Plan

St. Mary's Residential (Plot 19).

120509-STMRP19-TCP-WG-1.3

Client:

May 2012

1-200 @ A1

-

Lend Lease

Agent:

Date:

Scale:

Project Name:

Drawing Title:

Drawing Number:

BS5837:2005 - Tree Category

Symbol Guide

13

Root Protection Area

Canopy SpreadTree Position,(colour representsretention category)Tag Number

Category A TreesHigh Quality

Category B TreesModerate Quality

Category R TreesPoor Quality/Remove

Category C TreesLow Quality

AdjustedRoot Protection Area

Existing site plan

Page 2: Leisure centre redevelopment Public Realm...Leisure centre redevelopment Public Realm St Mary’s Churchyard Park 20% increase in the amount of grass in the park Changes to improve

Leisure centre redevelopment

Public RealmSt Mary’s Churchyard Park

20% increase in the amount of grass in the park

Changes to improve the view of both play areas at any one time for people supervising children

Improved access to the park from the new Leisure Centre

Enhanced planting to the park edge

1

1

2

2

3

3

4

4

S ubway

S FL 2.06

Treework Environmental PracticeThe Old RectoryPilgrims WayChew StokeBS40 8TT

Tel: 0117 2440012

Web: www.treeworks.co.uke.mail: [email protected]

Tree Constraints Plan

St. Mary's Residential (Plot 19).

120509-STMRP19-TCP-WG-1.3

Client:

May 2012

1-200 @ A1

-

Lend Lease

Agent:

Date:

Scale:

Project Name:

Drawing Title:

Drawing Number:

BS5837:2005 - Tree Category

Symbol Guide

13

Root Protection Area

Canopy SpreadTree Position,(colour representsretention category)Tag Number

Category A TreesHigh Quality

Category B TreesModerate Quality

Category R TreesPoor Quality/Remove

Category C TreesLow Quality

AdjustedRoot Protection Area

Existing park plan

Page 3: Leisure centre redevelopment Public Realm...Leisure centre redevelopment Public Realm St Mary’s Churchyard Park 20% increase in the amount of grass in the park Changes to improve

Leisure centre redevelopment

Public RealmEntrance plaza

Pine Grove creating views and shade

Water features expressing climatic conditions

Seating integrated into edges of planters and the park

Local stories and history captured in details

C’C

1

1

2

2

2

2

3

3

3

3

4

4

Rainwater harvesting and links to pool artwork

Entrance plaza plan

Section / elevation

Public realm concept sketch

Page 4: Leisure centre redevelopment Public Realm...Leisure centre redevelopment Public Realm St Mary’s Churchyard Park 20% increase in the amount of grass in the park Changes to improve

Leisure centre redevelopment

Public RealmShared surface

Sihl City Green Wall, MMA, Zurich

Art wall precedents

Green wall precedents

Sihl City Green Wall, MMA, Zurich

Sihl City Green Wall, MMA, Zurich

Sihl City Green Wall, MMA, Zurich

Terrace for Leisure Centre café

Shared surface

Pedestrian safe passage defined with planting, paving and furniture

Seating & cycle parking integrated into edges

1

1

2

2

3

3

3

4

4

4

4

Art wallGreen wall

Art

wal

l

Gre

en w

all

Western elevation of St Mary’s Residential