Lehigh Valley Hospital – Cedar Crest Campus
Presented by:
Derek Snover
Sponsored by:
Allentown, Pennsylvania June 2005- December 2008
310, 000 sq ft Expansion Total Cost = $181 million
![Page 2: Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal](https://reader035.vdocuments.mx/reader035/viewer/2022072005/56649cee5503460f949bc9af/html5/thumbnails/2.jpg)
Site Layout
Arial photos taken by:Frank Wiese of The Morning Call, July 11 2006
![Page 3: Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal](https://reader035.vdocuments.mx/reader035/viewer/2022072005/56649cee5503460f949bc9af/html5/thumbnails/3.jpg)
Technical Analysis 1
• Gain higher LEED rating– Currently Silver– Obtain a Gold rating
• Analysis of rooftop rain water collection system for grey water use
• Waterless urinalsCourtesy of:http://www.lakotawatercompany.com/images/AnimatedRainwater.gif
![Page 4: Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal](https://reader035.vdocuments.mx/reader035/viewer/2022072005/56649cee5503460f949bc9af/html5/thumbnails/4.jpg)
Technical Analysis 2
• Control air quality to reduce risk of illness to workers and patients in existing building
• Alternate phasing of construction to allow cleaner facilities
• Analysis of products and techniques to prevent contaminants entering the building
![Page 5: Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal](https://reader035.vdocuments.mx/reader035/viewer/2022072005/56649cee5503460f949bc9af/html5/thumbnails/5.jpg)
Technical Analysis 3
• Propose using a pre-cast hollow core floor system
• Reduce amount of labor• Reduce schedule time• Develop system cost
comparison
Current System: Poured Slab on Metal Deck
Alternate System: Pre-cast Hollow Core Concrete Floor
![Page 6: Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal](https://reader035.vdocuments.mx/reader035/viewer/2022072005/56649cee5503460f949bc9af/html5/thumbnails/6.jpg)
Questions