![Page 1: Legislative Council Panel on Development Follow-up …...will be intercepted by the Hong Kong West Drainage Tunnel under construction for discharge to the sea near Cyberport. The remaining](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f1b60b20788c17dde7909c7/html5/thumbnails/1.jpg)
For Information
Legislative Council Panel on Development
Follow-up Action to Meeting on 20 April 2011
160CD – Happy Valley Underground Stormwater Storage Scheme
Further to the meeting of Panel on Development held on 20 April 2011, the Administration provides the following supplementary information on the project 160CD – Happy Valley Underground Stormwater Storage Scheme.
(a) The dimensions of the proposed pump house in the project.
The proposed pump house is a single-storey building with a plan area of about 500 square metres (31 metres (m) long by 16 m wide) and a height of about 4 m above ground level.
(b) Details of: (i) the catchment areas of the proposed underground stormwater storage tank, and (ii) rain water collection facilities and drainage systems in the catchment areas; including an explanation on how the collection facilities and drainage systems will work with the stormwater storage tank to prevent flooding in Happy Valley and the vicinity areas.
The required details are as follows :
(i) The area of the catchment upstream of Happy Valley is about 270 hectares. Stormwater from the upstream part of the catchment (about 140 hectares) will be intercepted by the Hong Kong West Drainage Tunnel under construction for discharge to the sea near Cyberport. The remaining catchment (about 130 hectares) will be served by the proposed Happy Valley Underground Stormwater Storage Scheme (HVUSSS). A plan showing the catchment areas is at Enclosure 1.
(ii) If rain is not heavy, rain water in the catchment area of the proposed
HVUSSS will be collected by the existing drainage network and carried down-stream for discharging to the Victoria Harbour through the box culvert underneath Canal Road. At times of heavy rainstorms, part of the stormwater collected will be diverted to the proposed storage tank for temporary storage in order not to overload the drainage network thus preventing flooding at Happy Valley and the vicinity areas. After the rainstorms, the water in the storage tank will be released back to the box culvert underneath Canal Road for discharging to the sea.
CB(1)2220/10-11(01)
![Page 2: Legislative Council Panel on Development Follow-up …...will be intercepted by the Hong Kong West Drainage Tunnel under construction for discharge to the sea near Cyberport. The remaining](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f1b60b20788c17dde7909c7/html5/thumbnails/2.jpg)
2
(c) Improvement works to the rain water collection facilities and drainage systems in
Happy Valley to address flooding in the wake of the flooding incident at San Francisco Tower. The original drainage system at San Francisco Tower collects stormwater upstream of Broadwood Road. To reduce the risk of flooding at San Francisco Tower and areas in its vicinity, a new drainage pipe has been constructed from Broadwood Road for diverting about 50% of rain water at Broadwood Road away from San Francisco Tower to Sing Woo Road. After the completion of the new drainage pipe in April 2010, there was no flooding report at San Francisco Tower in the last wet season.
(d) Measures for disposal of construction waste, e.g. excavated materials, generated
from the project, including the public fill reception facilities and landfills which will receive the waste; and ways to minimize possible nuisances to nearby residents in the transportation of waste from the project site.
We plan to transport the inert construction waste generated by the proposed works to Chai Wan Barging Point en route Wong Nai Chung Road (WNCR), Canal Road Flyover and Island Eastern Corridor. For the non-inert construction waste, we plan to transport it to Tseung Kwan O landfill via WNCR, Canal Road Flyover, Island Eastern Corridor and Eastern Harbour Crossing. To minimize the nuisance to nearby residents in the transportation of construction waste from the project site, we will implement the following measures during the construction stage :- Fully enclosed conveyance system on site At the start of the construction stage, a permanent access manhole and two underground pipes will be installed near the public car park at WNCR at the eastern side of the site. A conveying belt system will be installed inside the two underground pipes for carrying construction wastes to the car park where it will be transported away by dump trucks. The conveying belt system will be fully enclosed and all the dump trucks will be well-covered to minimize any nuisance to public. A plan showing the transportation route of the dump trucks and the conveying belt system is shown in Enclosure 2. Disposal of construction waste during non-peak hour We estimate that there would be a maximum 15 numbers of dump trucks per hour during the construction period. To minimize the loading to existing traffic, disposal of construction waste will only be carried out during non-peak hours (i.e. 9:30 – 17:00 in weekdays and 08:00 – 12:00 on Saturdays).
![Page 3: Legislative Council Panel on Development Follow-up …...will be intercepted by the Hong Kong West Drainage Tunnel under construction for discharge to the sea near Cyberport. The remaining](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f1b60b20788c17dde7909c7/html5/thumbnails/3.jpg)
3
(e) Measures the Administration would take to minimize possible disruption caused
to the sports activities at the Recreation Ground during construction even though works will be carried out in two phases.
The construction of the underground storage tank will be divided into two phases. Not more than three football / rugby pitches will need to be closed during each construction phase. The affected pitches in the second phase will only be closed after re-opening of the pitches in the first phase. In January 2011, we consulted the major users of the pitches, including the Hong Kong Football Association and Hong Kong Rugby Football Union about the arrangement. They had no objections to the proposed pitch closure arrangement.
(f) Whether the traffic impact assessment for the project has taken into account the
expected increase in traffic flow arising from the redevelopment of the Hong Kong Sanatorium and Hospital; if yes, the details of the expected increase in traffic flow and the scale of the redevelopment project.
The Hong Kong Sanatorium and Hospital (HKS&H) submitted its traffic impact assessment (TIA) report to the Transport Department (TD) in connection with the proposed redevelopment involving an increase in the number of beds from 438 to 800 in mid-2010. The TIA report was accepted by TD. The TIA for the proposed HVUSSS carried out from late 2010 and accepted by TD in March 2011, has taken into account the forecast traffic condition in Happy Valley during the construction period known at the time including traffic generated by the proposed redevelopment of the HKS&H. TD would follow up on assessment of the supplementary TIA to be submitted by HKS&H for Town Planning Board's consideration to ensure it is acceptable. We estimate that there would be a maximum 15 number of dump trucks per hour during the construction period of the proposed HVUSSS.
Development Bureau Drainage Services Department May 2011
![Page 4: Legislative Council Panel on Development Follow-up …...will be intercepted by the Hong Kong West Drainage Tunnel under construction for discharge to the sea near Cyberport. The remaining](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f1b60b20788c17dde7909c7/html5/thumbnails/4.jpg)
Race
MOUNT NICHOLSON
MIDDLE GAP
MOUNT CAMERON
LOVER’S ROCK
⁄⁄
ˆ«t
]
JARDINE’S LOOKOUT
À¶d“
í·l
LEGEND
PROPOSED BOX CULVERT
ˇ„
HONG KONG WEST DRAINAGE TUNNEL
PROPOSED UNDERGROUND STORAGE TANK
CATCHMENT OF HONG KONG WEST DRAINAGE
TUNNEL
ä· �qfi �Łƒ �B« �ô
ä· �qfi �Łƒ �B« �ô⁄ �˘– �æ
A3 420x297C:\TEMP\dsd_pw\dms11115\160cd1_sketch31-3.dgnCol_pdf_cswp_v8.plt $$rend_attr$$$$colortable$$PLOTPEN.TBL
0 CM 10 20 30
˘‡ REMARKS
EXISTING MAIN TRUNK DRAINS
ÀÀ �Ø« �c‰
OTHER TRUNK DRAINAGE SYSTEMS WITHIN THE
CATCHMENT ARE NOT SHOWN FOR CLARITY
ä¤ �L¥ �˘– �ô⁄ �º· �D„ �ˆ¤ �
ifi �{†
*
*
*
*
]¶ �¤° �aƒ �W⁄ �å·
BOUNDARY OF THE CATCHMENT UPSTREAM
OF HAPPY VALLEY
ÀÀ �Ø« �]¶ �¤° �aƒ �aƒ �U⁄
CATCHMENT OF PROPOSED UNDERGROUND STORAGE TANK AT HAPPY VALLEY
{† �‡ƒ �˘– �ô
ÀÀ �Ø« �aƒ �U
ÀÀ �Ø« �W» �x‹ �À
CATCHMENT OF THE PROPOSED UNDERGROUND
STORAGE TANK
![Page 5: Legislative Council Panel on Development Follow-up …...will be intercepted by the Hong Kong West Drainage Tunnel under construction for discharge to the sea near Cyberport. The remaining](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f1b60b20788c17dde7909c7/html5/thumbnails/5.jpg)
ß”hƒQ F‹†'‚›æ‰“É⁄
W˘J¥F“ˆƒ
C„Ö
GÀD„J⁄f⁄B
HL
GFS Wanchai Heliport
VICTORIA HARBOUR
Wan Chai East Sewage Screening Plant
Playground
Tunnel Approach Rest Garden
F
PO
H
H
L
L
L LH
L
L
L LH
L
L
LHL
LL
L
HLL
LL L
H
L
LL
H
LH
L L
L
HL
L
LL
L
HL
LH
L
L
LL
LL
H
LHL
L LL
LLH
L
LL
HL
LL
H
L L
LLL
L
LLL
L LL L
LL
L
LL
H
H
LH
L
L
L
L
L L
LL
L
LH
LLL
H
L
HLH
H
L LL L
H HL
LLL
HL
L
LH
L
HL
L
LLH L
LH
L
LL
LL
LL
LL
LLL
L H
L
L
LL
L
LL
LHL
L HL
LLL
L LH
L
LL
L L L LL
HL LL
HLL
L LLL
LLLL
LH
H
LH
LLL
L
H LL
L H
LL
LL
LL
LHL
LL L
LHL
LLLL
LL LL
LL
L HH
L
HL
LL
LLL
L LL LH
LL
HL
LL L
óflaƒuô”y
Tennis Court Bowling Green
WIP Dec 2010
WIP Jan 2011
Crane
L
LL
L
LH
L
L
LL
L
L
LL
L
LL
L
L
LL
LL L L
L
L
LL
L
L L LL
LLL L
LLL
L
LL
L
L
H
LL
L
LL L
L
L
L
LLL
LLLL
L L
L
LLL
H
LLL
LL
HL
L
L
LL
LLL
LL
HL
HL
LLH
L
L
L LL
LH
L
H
LL L
L
L
LL LL L
L
L
L
L
H
LL
HL
L
LLH
LL
L
L
LL
L LL LL
LH
L LHL
L
LLL
L
LL
L
L
L
L
L
L LL
LHLH HL
LL
L
LL
LHL
LL
L
H
H
L
L
LL L
L LL
L
L LL L
H
L LHH L
LL
LLH
LL HL LLL H
L
L
L LH L
LL
LL
LH L L
LLL HL H L
L LLH
LL
L LL
LL
LLLL
LH
L
HL
LL L
LH LL
LL
LLLL
HL
L
LHL L
LL
LL
HL L
HL
LL LLL
L LLL HL
L
LL LL
L
LLL
H
L
L
LL
H LL
LH
L
LL
L
LLLH
w…fl
णµC
x˜y
W˘J¥
‹¤y
^ƒ—–
BasketballCourt
Wan ChaiPark
Football Field
Lat(under)Hong Kong
Jockey Club Garden (under)
UncontouredMuslim Cemetery
GÀD
GÀD GÀD
GÀD
WIP Feb 2011
CUL
CUL
CUL
CUL
CUL
CUL
TunnelPortal
TunnelPortal
TunnelPortal
CUL
TunnelPortal
M
M
F
L
HL
LL
LH L
H LL L LLH
LLH LH L
LL
LL
LL
L
HL LH L
L
L HL
LL
HH
LL
LLL
LLL
LL LL L
H HH
LL
L
L
L
HLL
LL
HHL
LL
L L
LLLL
LL L
L HL
L L
L L HLH
LH
LH
H
LH
LLL
LL
LL LL L
LLL L
LH
L
L LH
HL
HL LL
L HLL
L LH
LL
L
LL L
L
L L LHHL
L H
HH LL
HH
L
L
LLLL LL
L
LHLL
L HL H
LL H
LL
LH
LLLL
LL L LLL
L LL L
L
HH
L H
LLL
L LL L L
LL
LH L
L HL
LLHL L
L
LL
L
L
L
HHL LL
L
LLLL
LLL
HL
LLL
LHL
LLH H
LL
L
H L LL L
L
HLL
L
LL
L
H
L
LLL
LL L
L L LLL
LL
L
L LLH
HL
LLL
L LH
L
L H LL
LL
LL
LL
LLL
LH
LLLH
LL
HL
LLL
LL L
HL
L LL
HL
L
LLL L
L
L
HLL
LL
LLLL L
LL L L
LL
L
LL
LL L
LL LL
L
LLL
L HLLH
LH
LL
L HL
L
HH
LL
LL HL
HLL LL
H
L
L
L
LL
L
L
LLL
L H
L
L
LL
L LL
L
H HL
HL
LH
LL
L L
LLL
L
L
L LH
LL
L H L
L L H L
LHH
LL
L L
L
L
L L
LL H L
LL LL
HL
LL
L H
LL
LLL L
L
L
LL H
HL
H
LL
L
L
L
LL
L
LH L
H L
[¥ô‚
»›ä·‹¤y
»›ä·‹¤y†|•
CAROLINE HILL
ESS
HKFC Soccer/Rugby Field
HKFC Bowling Green
WIP Jan 2011
WIP Jan 2011
CUL
WIP Feb 2011
CUL
CUL
CUL
M
LL L HL
LL
LL
LL
LLH
L LL LLL LL
L H
L
LLL L L
L LL
HL
H LLHL
LL
LL L
LLH
LLL
L
LL L
L LL H L
LL
LL
LL
L H
L
L
L LL LL
LH
LH
L
H
LL
L
L
LL L
LL
L
LH
LL L H
L L
LL
L HL L
LL
L
H
LL L L L
LLL L
LH L
L
H
HL
LLH H
LL
LLH
LLL
L LH
LL
L LL L
L
LL
L
LLLL
LL
LLH H L
L
HL
LL H
LL
L LL
LL
LL
HH
L
L
L LL L
L LL
L
LH
L
L
L
L
L
L
L
L
L
L
H L
L L
L
L H
H L
L
H
LHH
L
HLLL
L
LL
H
L
LL
L
H
H
L
L
L
LL
H LL
H
LL
H
LLLH
LL
L
HL LH
L
L
L
L
L
L L
H
LL
LL
H
L
L
LHL L
L
LL
L
L
HL
L LL
L
HL
L
EW
]¶¤°a
]¶¤°aƒt‚–ÀBˆ
_˜‡¶D„¡–
q¥{fiÞ'D
q¥{fiÞ'D
Happy Valley Racecourse
Stubbs Road
Children’s Playground
Bowen RoadLover’s StoneGarden
Stubbs Road Lookout
CUL
CUL
CULTunnelPortal
CUL
SHR
TunnelPortal
CUL
CUL
CUL
CUL
CUL
WIP Dec 2010
M
M
SHR
SHRSHR
M
M
F
L
LL
HL
LL
HL
HLL
L
L
H
LL
LL
LLL
L
LL
LL
LL
LLL
L
LH
L LL
L
H
LL
LL
L
HLLL
L
L
L
LL
LLLL
LL
HLL
L
L
LL
LLL
L H
HL
L
L
L
L
LLL
L
LLL
HL L
L
L
LL
LL
L
LL
LH
LL
L
L
LH
LL HLL
L
L H
L
LLL
L L
LL
LL
L
L
H
LL
LL
L
L
L
LL
LLL
LL
L
L LL
L
L
L
L
L
LL
L
L
L L
H
LLL
L
LL
L
L
L
L
LL
L
LLL
LL
L
L
LL
L
LH
L
L
L
L
LL
L
LL
LL
L
L
LL
LL
L
L LH
L
L
L
LL
L
LL
L
L
L
FP
‹¤y
»›ä·j
]¶¤°a
C„Ö
Lƒ×«
Football Field
Beverly Hill
Hong Kong Stadium
Villa Lotto
Happy Valley Racecourse
Playground
CUL
CUL
M
PO
F
H LH
L
H
HLL
H
L
L
L
L
L
L
L
L
LH
L
H
L H
L
L
H
L
L
L
L L
HL
LL
L
H
L
LL
L
L
HH
L
L L
L
L H
L
LH
L
LL
LH
H
L
LL
H
L
H
H
LL
L
L
H
L
H
LL
L
L
L
L L
L
L
HL
L
H
LH
LL L
L
HL
L
LH
L
L HL
L L
L
LL
L
HL LL
LL H L
L
LL
H L
L
L
L LL
H
H
LL
H L
LL L
LL
LH
L
LH
LL
LHH
L
L
LL
LH
L
L HL
LL
L
L
LLL LL
L
LL
LLL
LH
LL
L LL
L
LHL
L
H LL L H
L
LL
L
L L
LL
L H L
RACE TRACK
BOUNDARY WALL
TEMPORARY SHED
u⁄ �aƒ
B„ �Ø
i¶ �J⁄
À¶ �d“
{` �Éfi �B
ACCESS MANHOLE
WONG NAI CHUNG ROAD
ò‡
É`
SITE AREA
TWIN 2100 DIA. DRAINAGE PIPECONVEYOR BELT
SECTION 1 - 1
`⁄ �–› �ˇ„ ‰“ �|fi �2�1�0�0� �@† �
PUBLIC CAR PARK
‰⁄ �‡† �–
100 CM
£⁄ �ö«
NOT TO SCALE
æ⁄
SCALE 1 : 10 000
HAPPY VALLEY UNDERGROUND STORMWATER STORAGE SCHEME
- TRANSPORTATION ROUTE OF DUMP TRUCK
]¶ �¤° �aƒ �aƒ �U⁄ �W» �x‹ �p› �”„
1
1
LEGEND
B„ �d“ �fi¤ �æ
TRANSPORTATION ROUTE OF DUMP TRUCK
ˇ„
SECTION 1 - 1
`⁄ �–› �ˇ„
ÀÀ �Ø« �aƒ �U
PROPOSED UNDERGROUND STORAGE TANK
‰“ �|fi �2�1�0�0� �@† �TWIN 2100 DIA. DRAINAGE PIPE