Page 1: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

Left SideEquipment Stack with HPA Inverter

at bottom.Set the inverter to

Mode 2.

Right SideEquipment Stack

with modems with Inverter at bottom.Set the inverter to

Mode 2.

KU TrailerBack view

Both inverters are at the bottom of their respective racks.

Page 2: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

Controls and Indicators

LCD DISPLAY SCREEN

SLI-24-115 Inverter

HARD POWER SWITCH

The Hard Power Switch must be in the ON position for the Inverter to function. If the Inverter is in Standby mode, power will still flow, but batteries will not kick in if AC power is lost. Use the Soft Power Switch to change from Standby mode to operate.

Alarm LED’s

Soft Power Switch

Page 3: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

To change Inverter settings while Ku Trailer is in operation (page 1).

STAND BY…If Inverter Screen shows then press the Button.

The display should indicate STARTING…

Vout=xxx.xVacIout=x.xxAac

Press once to see Master Ad. IStand Alone

followed by T.Switch Online Load->Inverter S

Press or until the display shows

Vgrid=xxx.xVacIgrid=x.xxAacPress or until the display shows

The Vout and Vgrid should be close to 120Vac. If the Vgrid and Vout are also not within 20% of each other, contact Datapath FSR and have them check the inverters and generator.

Step1

Step2

Step3

Step4

followed by the screen below.

If the Ku Trailer is running and the Inverter is already turned on, you can proceed to Step 2 without performing Step 1.

If this screen shows “Load -> Grid” then continue with the steps to verify the other settings.

The screen will return to the Vgrid or Vout screen in a few seconds on its own.

Page 4: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

To change Inverter settings while Ku Trailer is in operation (Page 2)

Press once to displaySETTINGS Menu - - >

1.0

Press five times to displaySet Address - - >

1.1

Press once to displayTransfer Switch - - >

1.12

Press one time to displaySet Voltage - - >Mask (%) 1.12.1

Press two times to displayTransfer Switch Operat. Mode - - >

Press one time to displayMode 1 on_line

1.12.5.1

Press until the display showsMode 2 off_line

1.12.5.1

then press one time.

This will set the AC source to the Grid (AC Input) rather than the DC source.

This will include the Password which is “0000”. The default for pressing enter without the up or down arrows is “0”.

If this display shows “Mode 2 off_line” press Enter and continue to step 12.

Step5

Step6

Step7

Step8

Step9

Step10

Step11

Page 5: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

To change Inverter settings while Ku Trailer is in operation. (Page 3)

Press one time to display

Press two times to display Set Vout - - >1.2

Transfer Switch - - >1.12

Press or

press one time.

to set the “Vout” to match 120Vac (in .1V increments).

The screen will display Vout=xxx.xVac - - >1.2.1

Press one time to display Set Vout - - >1.2

Press two times to display Transfer Switch - - >1.12

Press one time to display Set Voltage - - >Mask (%) 1.12.1

This will balance the Voltage output to match the Voltage input for a more stable load if the system is transferring from AC to DC power.

Step12

Step13

Step14

Step15

Step16

Step17

Step18

Page 6: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

To change Inverter settings while Ku Trailer is in operation. (Page 4)

Press one time to display V. Mask = xx %1.12.2

Press or to set the V.Mask to 20%.

Press one time to display Set Voltage - - >Mask (%) 1.12.1

Press one time to display Set RMS Voltage - - >Tolerance 1.12.2

Press one time to display Vrms Tol. = xx %1.12.2.1

Press or to set the Vrms Tolerance to 20%.

Press one time and then three times.

This will create a zone in which the Inverter will function. If the output voltage goes outside of this range (plus or minus the 20%), the system will alarm out.

This will create a zone in which the Inverter will function based on Vrms. If the output voltage goes outside of this range (plus or minus the 20%), the system will alarm out.

Step19

Step20

Step21

Step22

Step23

Step24

Step25 Vout=xxx.xVac

Iout=x.xxAacPress or to return to this display.

Page 7: Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set

Follow these instructions for both Left and Right inverters on the Ku Trailer.

When you change from Mode 1 to Mode 2, you may notice a system outage. This may be a minor outage with no downtime or it may require the HPA to go into delay-T status for a few minutes (usually no longer than 2 minutes) and should come back up on its own. Maintain visibility of the system until it comes back up. If it does not, ensure everything is still turned on and has not tripped a circuit breaker.

If the Ku trailer is not currently in operation, power everything up with the onboard generator and, once powered up, perform the steps above..

You must ensure that DC power is applied to the inverters by turning on the DC inverter power switch on the Right side stack.

You must also ensure that the Battery Charger on the Right Side stack is turned on as well in order to maintain a charge on the batteries for backup purposes.

T.Switch Online Load->Grid S

Press once to see Master Ad. IStand Alone

followed by

If you do not see Load -> Grid then start from step 1 again. If it does not work properly the second time, contact the Datapath FSR to assist you.