leed study guild p4
TRANSCRIPT
-
7/24/2019 LEED Study Guild P4
1/2
Brownfield sites land where development may be complicated by the presence or potential presence
of hazardous
substances, pollutants, or contaminants
Heat island effect increase in air temperature in a developed area compared with an undeveloped
area
Solar reflectivity index (SRI) combines reflectivity with emissivity
high SRI values reduce heat gainthe higher the better
Emissivity ability of a material to emit energy through radiation
scale is from 0-10the lower the better
Albedo reflection coefficient- !lbedo is measured on a scale from zero "for no reflection of a perfectly
blac#
surface$ to 1 "for perfect reflection of a white surface$the lower the better
Commercial Building Energy End se (to! ") 1$ Space %eating - &'( of total energy consumed
)$ *ighting - )1( of total energy consumed
&$ +ooling - ( of total energy consumed
Im!ervious surfaces "e asphalt and concrete$- prevent percolation and infiltration and encourage
water runoff, causing
soil erosion and in some places sedimentation of local waterways
#ow$im!act develo!ment (#I%) and
&reen Infrastructure (&I)
approaches to land management that mimic natural
systems and manage rainwater as close to the source as possible
'erisca!ing the use of drought-tolerant native or adapted plants along with roc#s, bar# mulch, and
other
landscape elements
%emand res!onse (%R) encourage electricity customers to reduce their usage during pea# demand
times
Renewable energy certificates (RECs) tradable, nontangible commodity associated with the
.ualities of
renewable electricity generation
Environmental roduct %eclarations (E%s) product transparency tool providing environmental
impact of product
*ermal comfort includes temperature, humidity, and air movement
+inimum efficiency re!orting value (+ER,) scale to rate the effectiveness of air filters
Credit Inter!retation Ruling (CIR) ruling process is designed to allow /roect eams to obtain
technical and administrative
guidancenon-precedent-setting "ruling can2t be applied to other proects$
#EE% Inter!retations official answers to technical in.uiries about implementing *334 on a proect
-
7/24/2019 LEED Study Guild P4
2/2
precedent-setting
"ruling can be applied to other proects$
&reen Rater individual who is wor#ing for a *334 %omes provider and performs on-site inspections
and testing for
the *334 %omes Rating System
%evelo!ment foot!rint the area affected by development or by proect site activity %ardscape,
access roads, par#ing lots,
nonbuilding facilities, and the building itself are all included in the development footprint
-ull$time e.uivalency (-E) 53 employees are determined by adding full-time employees and
part-time employees, adusted for
their hours of wor#
/atural ventilation or !assive ventilation providing ventilation by thermal, wind, or diffusion
effects through doors, windows, or other
intentional openings in the building