led 2ft and 4ft tubes · step 1 remove tubes and ballast cover. step 2 cut all wires at ballast....
TRANSCRIPT
STEP 1Remove tubes and ballast cover.
STEP 2Cut all wires at ballast.
STEP 3Using non-shunted sockets, wire line to one side of socket and neutral to the other.
STEP 4Jump to next socket in parallel.
STEP 5Put sockets back into place.
STEP 6Insert and rotate tubes into position.
Please consult an electrician. The goal of this rewire is to bring line and neutral to one end of the tube after bypassing the ballast (one end of the tube will have no wires running to it).
Installation Steps Disconnect All Power
LED 2ft and 4ft Tubes
©2018 by ELEDLIGHTS.COM All rights reserved
1610 Republic Road, Huntingdon Valley, PA 19006 ● 215.355.7200 7835 Wilkerson Ct, San Diego, CA 92111 ● 858.581.0597
Email: [email protected] ● www.eledlights.com
Installation Instructions