lecture 8- project quality management
TRANSCRIPT
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 1/60
Construction QualityConstruction QualityManagementManagement
Dr Anisur Rahman
G09 1.19
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 2/60
QualityQuality
The totality of features and characteristics ofa product or a service that bears on its ability
to satisfy given needs.Satisfaction to customer’s need – meeting or
exceeding customer expectation.
Quality not only satisfies the features butalso should satisfy the cost and on timedelivery.
Quality is a moving target.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 3/60
Costs of QualityCosts of Quality Prevention costs: Money required to prevent defects
– spent in establishing methods & procedures
– spent in training
– spent in planning quality
Spent before the product is actually built
Appraisal costs: Money required to control defects
– testing, inspection and examination costs
Money spent after the product is built
Failure costs: cost of failure due to poor quality
– esign changes! vendor re"ects! re#or$! scrap and materialrenovations! #arranty etc%
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 4/60
Quality CostsQuality Costs
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 5/60
Quality in Proect ManagementQuality in Proect Management
A!ility to manage a "roect and meet userre#uirements
$ Conformance to standards $ %n time and to !udget
&or #uality to !e achie'ed( all "artici"ants
in'ol'ed in a "rocess must !e committed
)*%+9000 standards used to hel" managersde'elo" QM*s
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 6/60
Quality Management ,'olutionQuality Management ,'olution
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 7/60
Quality ControlQuality ControlThe major objectives of quality control can be
defined as follows
To ensure that the completed wor! meets thespecification.
To improve the reliability of products or wor!produced
To reduce client’s compliant.
To increase client’s confidence.
To reduce production costs.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 8/60
Tools for Quality "ontrolTools for Quality "ontrol
The problem solving Tools
o #rainstorming$
o %areto &iagramo 'unchart$
o "ause and (ffect &iagram )nd So *n
Statistical Quality "ontrol
o Statistical process control
o )cceptance sampling
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 9/60
%areto &iagram%areto &iagram
*ne form of bar chart$ first developed by +ilfredo%areto ,-/s0 that provides information on therelative importance of problems.
%areto principle1 A relatively small proportion ofitems accounts for a large percentage of variableslinked to those items.
2istorically$ /3 of the problems are due to the
4/3 of the factors. 2elps select the most crucial problem5s and helps
in choosing the areas$ where quality improvementactions should be concentrated
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 10/60
,-am"le of Pareto Analysis+ Different ty"es of defects
found in Precast Concreate "roducts used for high rise
!uilding "eriod
efect types umber of occurrences
&imensional deviation 6-
"hip off -72oneycomb and %inholes
8rong alignment 6
"rac!s 96
8rong details 6
Strand slippage 9
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 11/60
Different ty"es of defects found in *"eedometer duringDifferent ty"es of defects found in *"eedometer during
one month "eriodone month "eriod
&raw the #ar diagram showing the different types of defects
as classes in the hori:ontal axis in the same order as in the
table with the most frequent defect shown on the left.
;umber of defects are read on the left scale and percentages
on the right scale.
The line graph that moves up from left to right shows thecumulative number or cumulative percentage up to and
including any given number.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 12/60
Pareto AnalysisPareto AnalysisNumber
of
occurrences
Cummulative
%Defect
Cum%Def
Dimensionaldeviation 61 61 45 45
Cracks 36 97 27 72
Chip of 15 112 11 83
Honeycom and!inholes 8 12" 6 89
#ron$ali$nment 6 126 4 93
#ron$ details 6 132 4 98
%trand slippa$e 3 135 2 1""
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 13/60
Pareto Analysis of *"eedometer DefectsPareto Analysis of *"eedometer Defects
The %areto diagram shows that two type of defects –
&imensional deviation and "rac!s problems account for
almost <73 of the defects.
) significant reduction of any of these two defects or both will
cause a substantial decrease in the overall defect rate.
*n the other hand$ a complete removal of one or more of the
rest of the defects would not ma!e a major dent in the overallrate. This does not imply that these defects should not be
wor!ed on. =t should be wor!ed on$ whenever possible with
little efforts.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 14/60
Run Chart or Time Series PlotRun Chart or Time Series Plot
>raph for time ordered data. This chart is useful in examining the behaviour of quality
variables over time. =n a 'un chart the hori:ontal axis represents the time$
whereas the vertical axis represents the individualobservations of numeric variable of interest.
'oad wor! delays due to ?achine brea!down
Week &elay hours
- 7
4 99 4
@ 7
7 @
6 <
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 15/60
Cause and ,ffect &ish !one/ DiagramCause and ,ffect &ish !one/ Diagram
The Tree diagram originally developed by Aaoru =shi!awain -B79 to identify problem areas where data can becollected and analysed.
=t displays the problem$ all contributing factors and theirrelationship.
The problem is called the effect and the factors that affectit are called the causes.
=t is helpful in eliminating problems by tac!ling their causesand also useful in understanding the effects byunderstanding several factors of the process.
;ormally used in #rainstorming session where possiblesolutions are being sought.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 16/60
Cause and ,ffect &ish !one/ Diagram Cause and ,ffect &ish !one/ Diagram o too to
ConstructConstruct// The problem is firstly agreed and defined precisely.
) team of people familiar with the process suggest the
different possible causes through brainstormingsession5s.
The effect box and the central line are then drawn.
The causes would be grouped together and theirinterrelations would be shown.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 17/60
Effect
Manpower
Machine
Material
Method
Cause and ,ffect Diagram &ormat forCause and ,ffect Diagram &ormat for
Construction 2Production "rocess/Construction 2Production "rocess/
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 18/60
Effect
People
Plant & Eqpt.
Policies
Procedure
Cause and ,ffect Diagram &ormat for ser'ice orCause and ,ffect Diagram &ormat for ser'ice or
administrati'e "rocess/administrati'e "rocess/
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 19/60
Cause and ,ffect &ish !one/ Diagram ,-am"le/Cause and ,ffect &ish !one/ Diagram ,-am"le/
%roduction of %recast "oncreteCour project is to build a high rise building. Dor this
purpose you are using different precast concreteproducts which you can either produce in your projectsite or procure from outside supplier. *ne of the majorproblem with the precast product is &imensional defectsthat would affect the joint element. )nalyse the probablecauses of such defect using cause and effect diagram
so that you can ta!e proper action to eliminate suchproblem.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 20/60
Cause and ,ffect diagram of DimensionalCause and ,ffect diagram of Dimensional
de'iation in "recast concrete "roductde'iation in "recast concrete "roduct
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 21/60
Cause and ,ffect diagram of Dimensional
de'iation
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 22/60
Rigidity
,-"erience ContentMould "re" 3raining
4noledge3olerance
Personality
3ime PlacementDimensional
Deiation
!or"er!or" method process
MeasurementRaw materials
Demoulding
"roces
Cause and ,ffect diagram of Dimensional
de'iation
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 23/60
Rigidity
,-"erience ContentMould "re" 3raining
4noledge3olerance
Personality
3ime PlacementDimensional
Deiation
!or"er!or" method process
MeasurementRaw materials
Demoulding
"roces
*u""lier
%n
%utsource
Cause and ,ffect diagram of Dimensional
de'iation
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 24/60
Rigidity
,-"erience ContentMould "re" 3raining
4noledge3olerance
Personality
3ime PlacementDimensional
Deiation
!or"er!or" method process
MeasurementMaterials
Demoulding
"roces
*u""lier
%n
%utsource
Method
Place
%utside
)n+Com"
Cause and ,ffect diagram of Dimensional
de'iation
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 25/60
Scattered Dia#ramScattered Dia#ram
Esed for graphing the relationship between two
variables ,quality variables0.
This diagram shows a fairly tight relationship
between two characteristics.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 26/60
3ensile *trength and the ardness of Alloy3ensile *trength and the ardness of Alloy
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 27/60
,-am"le of *cattered Diagram,-am"le of *cattered Diagram
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 28/60
ardness+ 3ensile *trength Diagramardness+ 3ensile *trength Diagram
The diagram shows a linear relationship between
the hardness and tensile strength.
Test of tensile strength is expensive$ whereas
hardness can be measured through non1
destructive test which is relatively cheaper.
So$ one can easily estimate tensile strength at
considerable savings.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 29/60
*tatistical Quality Control*tatistical Quality Control
SQ" is the application of statistical techniques to measure Fevaluate the quality of a wor!$ product$ or process.
Two basic categories of SQ" Statistical %rocess "ontrol ,S%"0 –
"ontrol "harts 1 used to chec! if a process is performingas desired and to prevent quality problems in process.
)cceptance Sampling
Esed to determine whether a product lot is acceptable
based on inspection of random sample ,s0.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 30/60
Statistical Process ControlStatistical Process Control
Esed to evaluate and control the output of process
to determine its acceptability – monitors quality
characteristic
?onitoring is maintained by using control charts
S%" helps us
– To detect unusual behaviour in the process
– To determine whether process outcomes are
affected by special events and
– To decide whether a process is stable over time.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 31/60
Common Causes of $ariationCommon Causes of $ariation
"auses that are natural ,inherent0 to the process and
are always present in some degree ,73 of problems
in the system0
"an only be removed through system improvement =t is the aggregate result of many relatively small
factors$ such as
– (nvironment1 temperature or humidity
– *perator1 mentality or capability of the operator – 'aw material1 quality of material from different
supplier
– (quipment – age, model, capacity.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 32/60
*"ecial2Assigna!le Causes of 5ariation*"ecial2Assigna!le Causes of 5ariation
+ariation that is due to one or very few factors
The main sources can usually be identified F
eliminated
%rocess with special variations leads to out of control andcan results in large variations
Examples - defective materials, output of a
machine that is set up incorrectly or output of an
inexperienced/untrained operator, tool wear G
These variations can be detected and acted for correction
They are controllable
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 33/60
The Control ProcessThe Control Process
(ffective control is achieved by the following&efine in sufficient detail what is to be
controlled =nspect the portion of the goods or services"ompare the results to the predetermined
standard
(valuate deviations from the standardTa!e corrective action when necessary
Dollow up to ensure that problems havebeen corrected
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 34/60
Data Cate#oriesData Cate#ories
Quality characteristics
+ariables+ariables are quality characteristics that are
numeric in nature and can be measured.(xamples 8eight$ length$ time or any othermeasurable characteristics.
)ttributes )ttributes are quality characteristics thatcan not be measured numerically.
)ttributes concentrates on defects or non1conformity. (xample a computer set can
be either good or faulty.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 35/60
Control ChartControl Chart
%C% '
np '(
)C% '*
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 36/60
+ut of control process, -one for out of
control patterns
)C%
%C%
C%
-+E /
-+E /
-+E 0
-+E 0
-+E C
-+E C
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 37/60
%ut of Control Pattern%ut of Control Pattern
)ny point falls outside the control limits.
Two out of three consecutive points in :one ) and on
the same side of the centre line.
Dour out of five consecutive points in :one # and on
the same side of the centre line.
(ight consecutive points on one side of the "H.
6 consecutive points increasing or decreasingI
-@ consecutive points that alternate up and down.
-7 consecutive points within :one "
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 38/60
Control Charts for Attri!utesControl Charts for Attri!utes 'hen the process output is individual items, relatively
simple and inexpensive%
– p charts: control charts for proportion or fraction
defectives% (sed for fixed or variable sample si)e*+
– np chart: control charts for number defectives used for
fixed sample si)e%
inspected number Total
defectivesof number Total p =
( ) i
n p p pUCL 216 −+= ( ) in p p p LCL 216 −−=
( ) p pn pnUCL −+= 16
( ) p pn pn LCL −−= 16
inspected number Total
defectivesnumber Total n pnCL ×==
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 39/60
"ontrol charts for number of defectives in an item
– c charts – area of opportunity for defects to occur stays same$ eg no. of
defects in monitors
"entre line
– u charts 1 area of opportunities vary – eg. ;o. of spelling mista!es in
documents.
Control Charts for Attri!utesControl Charts for Attri!utes
inspected Itemof number Total
Itemsall indefectsof number Total c =
ccUCL 6+= cc LCL 6−=
inspected areaTotal
observed defectsof number Total u = i
a
uuUCL 6+=
ia
uu LCL 6−=
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 40/60
Control Charts for 5aria!lesControl Charts for 5aria!les
+ariables are controlled by monitoring both
their average level and their spread.
#ecause a shift in average level or anincrease in spread or combination of both
may result in output that does not satisfy its
requirement.
"ontrol charts for variables come in pair – *ne for controlling )verage level and
– *ne for controlling the Spread
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 41/60
3he Pair Charts3he Pair Charts
J1#ar "harts and ' "harts
J 1 bar for average level and ' charts for
spread.
These are the most widely used variable
control charts.
*ther popular pair1charts are?edian chart for average level and
Standard deviation charts for spread.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 42/60
Quality AssuranceQuality Assurance
Quality control defect detection and currection
Quality assurance defect prevention
3here are no standard methods for im"lementing #uality control techni#ues(
hence it is unlikely that there is a consistency of quality between the companiesclaiming to use quality control
Quality assurance is created to o'ercome this situation !y esta!lishinginternationally acce"ted #uality standards such as )*% 9000 family.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 43/60
Quality AssuranceQuality Assurance
Quality assurance is a set of activities which documents down processes to be performed and how they are accomplished , howeach process can be completed correctly by self-checking.
The policy of recording the process underta!en$ together with thechec!ing and recording of procedures$ assures the client that thecompany is aiming to achieve an acceptable standard of quality .
Quality assurance shall at least serve two major purposes
Satisfying the clientK and
>etting it right in the first instance.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 44/60
)*% 9000)*% 9000
Quality assurance "ur"oses can !eQuality assurance "ur"oses can !e
achie'ed !y esta!lishing internationallyachie'ed !y esta!lishing internationally
acce"ted #uality standards such as )*%acce"ted #uality standards such as )*%
9000 family9000 family
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 45/60
1S+ *(((1S+ *(((
=S* B/// is a family of standards for quality management systems.
=S* B/// is maintained by the =nternational *rgani:ation forStandardi:ation and )dministered by accreditation and certification
bodies. Some of the requirements in =S* B//- ,which is one of the standards
in the =S* B/// family0 would include
– a set of procedures that cover all !ey processes in the businessK
– monitoring processes to ensure they are effectiveK
– !eeping adequate recordsK – chec!ing output for defects$ with appropriate corrective action
where necessaryK
– regularly reviewing individual processes and the quality systemitself for effectivenessK and
– facilitating continual improvement
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 46/60
)*% 9000 &amily)*% 9000 &amily
=S* B/// family includes the following standards
=S* B///4//7=S* B///4//7$ Quality management systems 1 Dundamentals$ Quality management systems 1 Dundamentalsand vocabularyand vocabulary. "overs the basics of what quality managementsystems are and also contains the core language of the =S*B/// series of standards.
=S* B//-4/--=S* B//-4/-- Quality management systems 1 'equirementsQuality management systems 1 'equirements
– =t is intended for use in any organi:ation which designs$develops$ manufactures$ installs and5or services any productor provides any form of service.
– =t provides a number of requirements
=S* B//@4//B=S* B//@4//B Quality management systems 1 >uidelines forQuality management systems 1 >uidelines forperformance improvements.performance improvements. >uidelines for performanceimprovements. "overs continual improvement. This gives youadvice on what you could do to enhance a mature system.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 47/60
)*% 9000 3eam)*% 9000 3eam
Senior management staff
Quality manager ,QS0
&epartment headsTechnical staff
>eneral staff
Enion =n general$ to get a member of staff at all
levels of the organisation involved
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 48/60
Critical Success 2actorsCritical Success 2actors
"ommitment of top management
Haunching ceremony$ hanging banners onpremises
Staff must be made aware of desire to see! =S*B/// accreditation 1?anagement must explainimportance of =S* B/// accreditation
)ll staff attend training – appreciation course$quality policy and procedure manual
%rovide bonus incentives
%reparation of manual requires participation fromall identifying areas of improvement
;ot an Linstant’ transformation
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 49/60
7enefits of )*% 90007enefits of )*% 9000
(nhance organisational image with internationally recognised
standards
'eduction in number of customer complaints
Satisfy customers and current mar!et environment =ncrease quality awareness$ motivation$ co1operation$
wor!manship and consciousness
Docuses training and professional development
Sets a baseline for continuous improvement
=mprove productivity and efficiency
'educe mista!es and rewor! ,right first time0
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 50/60
3otal Quality Management3otal Quality Management
LTQ? is a management tool$ philosophy and aset of principles which guides every memberof organisation who involved in the
continuous improvement process to meetcustomer satisfaction.
TQ? is the integration of all functions andprocesses within an organisation in order to
achieve continuous improvement of thequality of goods and services.
The goal is customer satisfaction’
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 51/60
3otal Quality Management Princi"les3otal Quality Management Princi"les
"ommitment to quality
TQ? must be company wide.
TQ? must be initiated by top management whomust demonstrate that they are serious aboutquality.
?iddle management must grasp the principlesof TQ? and explain them to the people forwhom they are responsible$ while doing so theymust also communicate their commitment toquality.
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 52/60
3he Cultural *hift Re#uired for 3QM3he Cultural *hift Re#uired for 3QM
From -o
?eeting specification "ontinuous improvement
"omplete on time Satisfy customersDocus on final product Docus on process
Short1term view Hong1term view
=nspection1based quality %revention1based
%eople as cost burdens %eople as assets?inimum cost suppliers Quality suppliers
"ompartmentalisedorganisation
Top1down management
=ntegration
(mployee participation
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 53/60
Main ,lements of 3QMMain ,lements of 3QM
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 54/60
Quality ChainQuality Chain
&'ality increase Decreased cost (ed'ced delays
)ncreasedprod'ctivity
)ncreasedmarket share
*ore +os
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 55/60
345ar345ar
charts and R chartscharts and R charts -his charts are applicable to process #here each sample
consists of sub group%
.xample:
– A/* produces plastic chord #ith nominal tensilestrength of 01 pounds% -o determine the stability of the
process a 23 samples, each consisting of four pieces of
chords, ta$en at hourly intervals as sho#n in the next
slide% 4n statistical process control terminology, each of
these sample of four pieces of chord is called subgroup% evelop an 5 bar chart and 6 chart from the
data given and comment on the process%
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 56/60
8+!ar charts and R charts8+!ar charts and R charts
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 57/60
Deelopment of 345ar chartsDeelopment of 345ar charts
)re developed based on the sample si:e ,si:e of sub group0.
Subgroups of si:e nM@ or nM7 are very often used.
The centre line for J1bar chart is set at the overall
average.
"omputation of control limits requires a factor which
depends on the subgroup si:e.
The control limits are
X
9 A
A X LCL
A X UCL
9
9
−=
+=
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 58/60
Ta5le '.Ta5le '.
Control Chart 2actorsControl Chart 2actors
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 59/60
De'elo"ment of R chartsDe'elo"ment of R charts
The computation of centre line and control limits for ' chart is
based on the data presented in the table.
The same data are used for the ' chart and the J1bar chart. The centre line is the average of range of the subgroup.
The computation of control limits requires two factors$ &9 and &@
that depend on the number of sub group. These +alues
for common sub group si:es are included in the table -.
The control limits are
! LCL
!UCL
6
:
=
=
7/25/2019 Lecture 8- Project Quality Management
http://slidepdf.com/reader/full/lecture-8-project-quality-management 60/60
Re#uirements of )*% 9000Re#uirements of )*% 9000
Management res"onsi!ility
Quality system
Contract re'ie
Design control Document control
Purchasing
Purchaser+su""lied "roduct
Product identification andtracea!ility
Process control
)ns"ection and testing
)ns"ection( measuring and testinge#ui"ment
)ns"ection and test status
Control of non+conforming "roducts Correcti'e action
andling( storage( "ac;aging anddeli'ery
Quality records
)nternal #uality records 3raining
*er'icing
*tatistical techni#ues