lecture 13b – managing quality improvement teams and projects (chapter 14) benefits of teams,...

56
LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools), Project Manager characteristics SJSU Bus. 142 - David Bentley 1

Upload: duncan-pressley

Post on 15-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14)

Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools), Project Manager characteristics

SJSU Bus. 142 - David Bentley 1

Page 2: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Topics

SJSU Bus. 142 - David Bentley 2

Why employees enjoy teams. Leading teams for quality improvement. Types of teams Implementing teams Managing and controlling projects Project manager characteristics

Page 3: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

WHY PEOPLE ENJOY TEAMS

SJSU Bus. 142 - David Bentley 3

Page 4: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Benefits of Teams

• Broad range of skills• Workload sharing• Increased flexibility• Synergy• Increased organizational learning• Balanced decision making

SJSU Bus. 142 - David Bentley 4

Page 5: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Five Motivators

SJSU Bus. 142 - David Bentley 5

1. Mutuality2. Recognition for personal

achievement3. Belonging4. Bounded power5. Creative autonomy

Page 6: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Employee Empowerment and Involvement - (1)

SJSU Bus. 142 - David Bentley 6

Greater control over your work No penalty for making decisions that

don’t pan out Management is changing and

becoming more contemporary Management is committed to quality

improvement over the long haul

Page 7: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Employee Empowerment and Involvement - (2)

SJSU Bus. 142 - David Bentley 7

Management will concede more control over company systems to you

Management values your ideas Management trusts you and is

worthy of trust in return You will be rewarded for making

decisions that benefit the company

Labor is capable of making decisions

Page 8: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Preconditions Necessary for Empowerment - (1)

SJSU Bus. 142 - David Bentley 8

Clear authority and accountability Participation in planning at all

levels Adequate communications and

information for decision making Responsibility with authority

Page 9: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Preconditions Necessary for Empowerment - (2)

SJSU Bus. 142 - David Bentley 9

Flattening Hierarchies for improved effectiveness

Team leader roles and responsibilities

Team rules

Page 10: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Types of Quality Improvement Teams

SJSU Bus. 142 - David Bentley 10

Process improvement teams Cross-functional teams Tiger teams Natural work groups Self-directed work teams Technology teams Virtual teams

Page 11: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

IMPLEMENTING TEAMS

SJSU Bus. 142 - David Bentley 11

Page 12: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Facilitation

SJSU Bus. 142 - David Bentley 12

Helping or aiding teams by maintaining a process orientation

Page 13: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Team Building

SJSU Bus. 142 - David Bentley 13

Follows a process that identifies rules for team members and helps them become competent

Page 14: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Examples of Teams

SJSU Bus. 142 - David Bentley 14

Navy Seals Massachusetts General

Hospital Emergency Room Penske Racing NASCAR team Hewlett-Packard ERP

implementation teams

Page 15: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Meeting Management

SJSU Bus. 142 - David Bentley 15

1. Developing meeting objectives2. Developing an agenda3. Designing the agenda activity

outline4. Using process techniques5. Parking lot

Page 16: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Conflict Resolution in Teams

SJSU Bus. 142 - David Bentley 16

Team leaders and project managers spend 20% of their time resolving conflict

Page 17: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Conflict Resolution in Teams – (1)

SJSU Bus. 142 - David Bentley 17

There are 4 stages in conflict resolution:

1. Frustration2. Conceptualization and orientation3. Interaction4. Outcome

Page 18: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Conflict Resolution in Teams – (2)

SJSU Bus. 142 - David Bentley 18

Leaders resolve conflict in different ways:

1. Passive conflict resolution2. Win-win3. Structured problem solving4. Confronting conflict5. Choosing a winner6. Selecting a better alternative7. Preventing conflict

Page 19: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Conflict Resolution in Teams – (3)

SJSU Bus. 142 - David Bentley 19

Three alternative techniques: Avoidance Diffusion Confrontation

Page 20: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

IMPLEMENTATION METHODOLOGY

SJSU Bus. 142 - David Bentley 20

Page 21: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Process Improvement Methodology – (1)

• Management responsibility• Develop process improvement plan• Determine process or area to examine• Form and train Process/Quality Improvement Team

SJSU Bus. 142 - David Bentley 21

Page 22: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Process Improvement Methodology – (2)

• Team: use coarse tools• Process flowchart• Check sheets and histograms• Pareto analysis <--- (iterative• Fishbone chart ---> steps)

SJSU Bus. 142 - David Bentley 22

Page 23: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Process Improvement Methodology – (3)

• Team: use fine tools• Process control charts• Run diagrams• Scatter diagrams• + Failsafing

SJSU Bus. 142 - David Bentley 23

Page 24: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Process Improvement Sequence – (4)

• Team• Determine process changes• Implement pilot process improvement • Measure and evaluate results• Repeat if results unsatisfactory; deploy full implementation if results

satisfactory

SJSU Bus. 142 - David Bentley 24

Page 25: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

PDCA (or PDSA) Cycle

• Also known as the Deming wheel, or Deming/Shewhart cycle or wheel

• 4 parts to the cycle• Plan - document and analyze

• Do - implement “improvement”• Check (or Study) - compare to desired state• Act - correct or standardize

SJSU Bus. 142 - David Bentley 25

Page 26: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

MANAGING PROJECTS

SJSU Bus. 142 - David Bentley 26

Page 27: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Project Characteristics

• Definite beginning• Definite end• Long duration (often months or years)• Very low product quantity • Very high variety of tasks• Multiple tasks often being performed concurrently

SJSU Bus. 142 - David Bentley 27

Page 28: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Tools

SJSU Bus. 142 - David Bentley 28

Qualifying projects Project Charters Force Field Analysis Work Breakdown Structures Network Diagrams (PERT/CPM) Gantt Charts

Page 29: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Qualifying Projects

SJSU Bus. 142 - David Bentley 29

Cost Benefit Analysis (CBA) Ct = Σ(Cd + Ci)

C = cost, t = total, d = direct, i = indirect

Payback Period PP = Ct/Ba

PP = payback period in time, Ba = annualized benefits

Difference between soft costs and hard costs (focus on hard costs)

Page 30: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Project Charters

SJSU Bus. 142 - David Bentley 30

Help teams identify objectives, participants and expected benefits

Page 31: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Force Field Analysis

SJSU Bus. 142 - David Bentley 31

Tool designed to identify and quantify all of the forces for and against organizational change

Score and sum the + and – forces

Draw a force field diagram

Page 32: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

NETWORK DIAGRAMMINGWork Breakdown Structures, Pert/CPM Tools, Gantt Charts

SJSU Bus. 142 - David Bentley 32

Page 33: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Work Breakdown Structures (WBS) and Task Analysis

SJSU Bus. 142 - David Bentley 33

Create work breakdown structure (WBS)

Identify Outcome Measures (activities)

Identify Task (Activity) Times (estimates)

Single estimate vs. three estimates (O,P,M) Optimistic completion time Most likely completion time Pessimistic completion time

Identify Precedence Relationships

Page 34: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Planning Complex Projects - Work Breakdown Structure

SJSU Bus. 142 - David Bentley 34

Project XProject X

Level 1

Level 2

Level 3

Level 4

Operations Management, Seventh Edition, by William J. Stevenson

Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.

Page 35: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

PERT/CPM Conventions

• One starting point• One ending point• No looping back• Activities and events

• Activity on arrows vs. activity on nodes

• “Dummy” activity used to preserve integrity• Zero time and zero resources

• All activities entering a node must be complete before starting the next activity

SJSU Bus. 142 - David Bentley 35

Page 36: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Activity-on-arrow Pert chart

SJSU Bus. 142 - David Bentley 36

1

2

3

4

5 6

Locatefacilities

Orderfurniture

Furnituresetup

InterviewHire andtrain

Remodel

Move in

Operations Management, Seventh Edition, by William J. Stevenson (Mod. 11/11/02 DAB)

Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.

Page 37: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Activity-on-node Pert chart

SJSU Bus. 142 - David Bentley 37

1

2

3

5

6

Locatefacilities

Orderfurniture

Furnituresetup

Interview

RemodelMove in

4

Hire andtrain

7S

Operations Management, Seventh Edition, by William J. Stevenson (Mod. 11/11/02 DAB)

Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.

Page 38: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Network Conventions

SJSU Bus. 142 - David Bentley 38

a

b

c ab

c

a

b

c

d

a

b

c

Dummyactivity

Operations Management, Seventh Edition, by William J. Stevenson

Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.

Page 39: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

PERT/CPM Steps - 1

• Develop the work breakdown structure• Identify all tasks from the WBS; identify resources• Sequence tasks, determining dependency• Estimate time duration of each task

• Single estimate vs. three estimates (O,P,M)

• Create the network (PERT) diagram

SJSU Bus. 142 - David Bentley 39

Page 40: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Critical Path

• Longest duration path in project• Determines the length of the overall project• Slippage on critical path will delay project completion• Focus on shortening the critical path to shorten the project• “Crashing” may result in creation of new critical path

SJSU Bus. 142 - David Bentley 40

Page 41: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

PERT/CPM Steps – 2

• Identify critical path (see previous slide)• Determine ES, EF, LS, LF dates• Calculate slack

• LS – ES or• LF – EF

SJSU Bus. 142 - David Bentley 41

Page 42: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Activity Network Diagrams – (1)

SJSU Bus. 142 - David Bentley 42

Pert Chart steps:1. List all tasks (activities)2. Determine task times3. Determine which tasks depend on

the completion of others4. Draw the network diagram

Page 43: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Network Diagram (PERT Chart)

SJSU Bus. 142 - David Bentley 43

B

12

E

3

C

6

D

5

A

15 I

7

J

14

H

9

F

8

End

Start

K

6

G

8

Page 44: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Activity Network Diagrams – (2)

SJSU Bus. 142 - David Bentley 44

Pert Chart steps (continued)5. Determine the critical path6. Compute early-start and early-finish

times7. Compute late-start and late-finish

times8. Compute slack times Slack time = late start – early start or

= late finish – early finish

Page 45: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Path Lengths (+ critical path)

Path Length

A-B-C-E 36

A-B-D 32

F-G-I 23

F-H-J-K 37 (critical)

SJSU Bus. 142 - David Bentley 45

Page 46: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Calculate ES, LS, EF, LF and Determine slack

SJSU Bus. 142 - David Bentley 46

B

12

E

3

C

6

D

5

A

15 I

7

J

14

H

9

F

8

End

Start

K

6

G

8

Page 47: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

ES, LS, EF, LF, and Slack - 1

Activity

ES EF LS LF Slack

F 0 8 0 8 0

H 8 17 8 17 0

J 17 31 17 31 0

K 31 37 31 37 0

SJSU Bus. 142 - David Bentley 47

Page 48: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

ES, LS, EF, LF, and Slack - 2

Activity

ES EF LS LF Slack

A 0 15 1 16 1

B 15 27 16 28 1

C 27 33 28 34 1

E 33 36 34 37 1

D 27 32 32 37 5

SJSU Bus. 142 - David Bentley 48

Page 49: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

ES, LS, EF, LF, and Slack - 3

Activity

ES EF LS LF Slack

G 8 16 22 30 14

I 16 23 30 37 14

SJSU Bus. 142 - David Bentley 49

Page 50: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Planning Simple Projects - Gantt Chart

SJSU Bus. 142 - David Bentley 50

MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Locate new facilities

Interview staff

Hire and train staff

Select and order furniture

Remodel and install phones

Move in/startup

Facility Move

Operations Management, Seventh Edition, by William J. Stevenson (Mod. 11/11/02 DAB)

Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.

Page 51: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Crashing

• The compression of one or more tasks on the critical path

• Why crash?• Avoid penalties• Earn incentives

• Cost-benefit trade-off analysis• How crash?

• Additional resources• Overtime• Alternative processes

SJSU Bus. 142 - David Bentley 51

Page 52: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Controlling the Project

• PERT/CPM charts little use for control• Gantt charts widely used• Project cost reporting also useful• Tools

• Microsoft Project• Others

SJSU Bus. 142 - David Bentley 52

Page 53: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Planning & Controlling the Schedule – Gantt Chart

SJSU Bus. 142 - David Bentley 53

MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Locate new facilities

Interview staff

Hire and train staff

Select and order furniture

Remodel and install phones

Move in/startup

Facility Move

Operations Management, Seventh Edition, by William J. Stevenson (Mod. 11/11/02 DAB)

Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.

Page 54: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

CHARACTERISTICS AND QUALITIES OF A GOOD PROJECT MANAGER?

SJSU Bus. 142 - David Bentley 54

Page 55: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Characteristics/Qualities of a Good Project Manager

• Planning• Organizing• Delegating• Communicating

• Oral• Written

• ______________• ______________

• Using people skills• Customers/users• Team members

• Analytical• Time sensitive

• Milestones• Deadlines

• _______________

SJSU Bus. 142 - David Bentley 55

Page 56: LECTURE 13B – MANAGING QUALITY IMPROVEMENT TEAMS AND PROJECTS (CHAPTER 14) Benefits of teams, Employee empowerment, Implementing teams, Projects (Tools),

Summary

SJSU Bus. 142 - David Bentley 56

Teams and collaboration as a means of improvement

Behavioral aspects of building and leading effective teams

Movement towards teamwork

Teams evolving through stages

Project planning fundamentals