    CO N STRU CTIO NPRO JECT RESO U RCES PLAN N IN G

    CE142

    Dr. J. Berlin P. Juanzon CE, MBA,MSCM

    LECTURE 11

  • 8/16/2019 Lecture 11- Project Resources Planning

    2/13

    Project Resources Planning

    There are seven key project resources thatrequire early evaluation and forward planning.

    Simpler projects may involve only some of

    these areas, whereas complex projects mayinvolve them all:

    1. Human Resources

    2. Materials3. Construction equipment4. Subcontractors5. Project services and sstems!. "ransportation arran#ement$. Project %inancin#

    2

  • 8/16/2019 Lecture 11- Project Resources Planning

    3/13

    Hum an Resources Planning

    Human resources &or construction'project plannin# brea(s do)n intomajor cate#ories*

    Home'o+ce personnel

    Construction personnel ,-eld supervisors

    and labor Construction subcontractors and t/eir

    supervisors

  • 8/16/2019 Lecture 11- Project Resources Planning

    4/13

    Hum an Resources Planning

    Home o+ce personnel*

    Purc/aser0canvasser Cost n#ineer

    Plannin# and Sc/edulin# en#ineer

    quipment Head

    o#istics n#ineer

    Project ccountant

  • 8/16/2019 Lecture 11- Project Resources Planning

    5/13

    Hum an Resources Planning

    Construction personnel*

    Project Mana#er Project Supervisor0n#ineers

    are/ouseman

     "ime(eeper

    %oremen

    eadmen

    irect construction )or(ers

  • 8/16/2019 Lecture 11- Project Resources Planning

    6/13

    Hum an Resources Planning

    Sub'contractor personnel*

    Project Coordinator Project

    irect subcontractor6s )or(ers

  • 8/16/2019 Lecture 11- Project Resources Planning

    7/13

    M ANPOW ER SCHEDULE

  • 8/16/2019 Lecture 11- Project Resources Planning

    8/13

    Construction-M aterial Resources Planning

    7n commercial and institutional projects8procurement o& materials via purc/aseorders or t/e a)ard o& a subcontract is

    per&ormed accordin# to t/e purc/asin#plan.

    Placement o& required materials )ill be/i#/li#/ted in t/e Critical Pat/ Met/od

    ,CPM sc/edule. "/is )ill dictate )/enorders need t o be placed and )/endeliver is required8 especiall &ormaterials )it/ lon#'lead time to deliver.

  • 8/16/2019 Lecture 11- Project Resources Planning

    9/13

    M ATERALS SCHEDULE

  • 8/16/2019 Lecture 11- Project Resources Planning

    10/13

    E!UPM ENT SCHEDULE

  • 8/16/2019 Lecture 11- Project Resources Planning

    11/13

    SU"CONTRACT PLANNN#

     "rades suc/ as electrical8mec/anical8 plumbin#8 roo-n#8 site)or(s8 and site utilities8 as )ell as-nis/in# trades8 are #enerallsubcontracted on most projects.

     "/e subcontracted plan is initiall

    &ormulated durin# t/e estimatin#process8 since proposals )ill besolicited &rom several subcontractors

    in eac/ trades.

  • 8/16/2019 Lecture 11- Project Resources Planning

    12/13

    SER$CES AND S%STEM S

    Project services and sstems are notp/sical resources8 but t/e must beplanned &or at about t/e same timeas t/e P/sical ones. Project sc/edulin# sstem

    ccountin# sstem

    Cost'control sstem dministrative sstem

  • 8/16/2019 Lecture 11- Project Resources Planning

    13/13

    &NANCAL RESOURCES

    7n most cases )/erein t/e collection&or pament o& 9eneral contractorsare delaed additional -nancial

    resources s/ould be necessar to pa&or direct labors8 suppliers andsubcontractors obli#ations.

    Sources o& &unds: ;an( loans

    Standb etter o& Credit ,C

    S/ort term -nancial lendin# institution

    ,Hi#/er 7nterest rates