lecture 11- project resources planning
TRANSCRIPT
-
8/16/2019 Lecture 11- Project Resources Planning
1/13
CO N STRU CTIO NPRO JECT RESO U RCES PLAN N IN G
CE142
Dr. J. Berlin P. Juanzon CE, MBA,MSCM
LECTURE 11
-
8/16/2019 Lecture 11- Project Resources Planning
2/13
Project Resources Planning
There are seven key project resources thatrequire early evaluation and forward planning.
Simpler projects may involve only some of
these areas, whereas complex projects mayinvolve them all:
1. Human Resources
2. Materials3. Construction equipment4. Subcontractors5. Project services and sstems!. "ransportation arran#ement$. Project %inancin#
2
-
8/16/2019 Lecture 11- Project Resources Planning
3/13
Hum an Resources Planning
Human resources &or construction'project plannin# brea(s do)n intomajor cate#ories*
Home'o+ce personnel
Construction personnel ,-eld supervisors
and labor Construction subcontractors and t/eir
supervisors
-
8/16/2019 Lecture 11- Project Resources Planning
4/13
Hum an Resources Planning
Home o+ce personnel*
Purc/aser0canvasser Cost n#ineer
Plannin# and Sc/edulin# en#ineer
quipment Head
o#istics n#ineer
Project ccountant
-
8/16/2019 Lecture 11- Project Resources Planning
5/13
Hum an Resources Planning
Construction personnel*
Project Mana#er Project Supervisor0n#ineers
are/ouseman
"ime(eeper
%oremen
eadmen
irect construction )or(ers
-
8/16/2019 Lecture 11- Project Resources Planning
6/13
Hum an Resources Planning
Sub'contractor personnel*
Project Coordinator Project
irect subcontractor6s )or(ers
-
8/16/2019 Lecture 11- Project Resources Planning
7/13
M ANPOW ER SCHEDULE
-
8/16/2019 Lecture 11- Project Resources Planning
8/13
Construction-M aterial Resources Planning
7n commercial and institutional projects8procurement o& materials via purc/aseorders or t/e a)ard o& a subcontract is
per&ormed accordin# to t/e purc/asin#plan.
Placement o& required materials )ill be/i#/li#/ted in t/e Critical Pat/ Met/od
,CPM sc/edule. "/is )ill dictate )/enorders need t o be placed and )/endeliver is required8 especiall &ormaterials )it/ lon#'lead time to deliver.
-
8/16/2019 Lecture 11- Project Resources Planning
9/13
M ATERALS SCHEDULE
-
8/16/2019 Lecture 11- Project Resources Planning
10/13
E!UPM ENT SCHEDULE
-
8/16/2019 Lecture 11- Project Resources Planning
11/13
SU"CONTRACT PLANNN#
"rades suc/ as electrical8mec/anical8 plumbin#8 roo-n#8 site)or(s8 and site utilities8 as )ell as-nis/in# trades8 are #enerallsubcontracted on most projects.
"/e subcontracted plan is initiall
&ormulated durin# t/e estimatin#process8 since proposals )ill besolicited &rom several subcontractors
in eac/ trades.
-
8/16/2019 Lecture 11- Project Resources Planning
12/13
SER$CES AND S%STEM S
Project services and sstems are notp/sical resources8 but t/e must beplanned &or at about t/e same timeas t/e P/sical ones. Project sc/edulin# sstem
ccountin# sstem
Cost'control sstem dministrative sstem
-
8/16/2019 Lecture 11- Project Resources Planning
13/13
&NANCAL RESOURCES
7n most cases )/erein t/e collection&or pament o& 9eneral contractorsare delaed additional -nancial
resources s/ould be necessar to pa&or direct labors8 suppliers andsubcontractors obli#ations.
Sources o& &unds: ;an( loans
Standb etter o& Credit ,C
S/ort term -nancial lendin# institution
,Hi#/er 7nterest rates