lecture 1: introduction wastewater: liquid effluents derived from domestic sewage or industrial...
Post on 19-Dec-2015
217 views
TRANSCRIPT
Lecture 1: IntroductionLecture 1: Introduction
WastewaterWastewater: liquid effluents derived from domestic : liquid effluents derived from domestic sewage or industrial sources, which for reasons of sewage or industrial sources, which for reasons of public health and for recreational, economic, and public health and for recreational, economic, and aesthetic considerations, cannot be disposed of by aesthetic considerations, cannot be disposed of by discarding them untreated into lakes or streamsdiscarding them untreated into lakes or streams
Types:Types: Industrial: e.g., petrochemical, metallurgical, plastics Industrial: e.g., petrochemical, metallurgical, plastics
industries industries Domestic: sewage, “gray water” (washing, bathing, cooking), Domestic: sewage, “gray water” (washing, bathing, cooking),
food processingfood processing Goals of WWTP:Goals of WWTP:
Reduce organic contentReduce organic content Remove particlesRemove particles Remove/inactivate pathogensRemove/inactivate pathogens Reduce inorganic nutrient levelsReduce inorganic nutrient levels
contaminants of concern in wastewater treatment
suspended solids
biodegradable organics
pathogens, parasites
nutrients
priority pollutants
refractory organics
heavy metals
dissolved inorganics
Municipal Water Municipal Water TreatmentTreatment
Municipal Sewage Municipal Sewage TreatmentTreatment
Primary TreatmentPrimary Treatment
Primary TreatmentPrimary Treatment
Secondary TreatmentSecondary Treatment
Activated SludgeActivated Sludge
Figure 27.20a,b
Activated Sludge Activated Sludge ComponentsComponents
Activated Sludge Activated Sludge ComponentsComponents
Primary treatment of wastewater
trickling filter aeration tank, activated sludge unit
Hyperion WWTPHyperion WWTP
Key DataKey Data Plant capacity: 300,000 gallons/minutePlant capacity: 300,000 gallons/minute Site size: 144 acres (60ha)Site size: 144 acres (60ha) Associated sewer run: 6,000 miles Associated sewer run: 6,000 miles
(9,600km)(9,600km) Water reclamation for re-use: 6%Water reclamation for re-use: 6% Energy recovery system generation Energy recovery system generation
capacity: 25,000kW (electrical) capacity: 25,000kW (electrical) Total project cost: $1.4 billion Total project cost: $1.4 billion