leblanc_03feb09_1 mpts phase 4 benoit p. leblanc pppl 19 june 2009

19
MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Upload: benedict-cunningham

Post on 05-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

MPTS Phase 4

Benoit P. LeBlanc

PPPL

19 June 2009

Page 2: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Outline

• Scope of work for Phase 4• Technical issues• Seven unused fiber bundles• Gradient location database• Previous inputs• A partial suggestion

Page 3: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Scope of Phase 4 and More

• Install 10 – possibly 12 -- new radial channels– Use 6-filter polychromator – as in phases 1 & 2

• Install two new alignment channels• Rebuild phase-3 polychromators

– Add 1064-nm filter for Rayleigh noise rejection (unlikely)

• Repair MPTS hardware – three items• Calibrate 40-channel system

– Spectral, fast/slow, gain; before Rayleigh/Raman

• Preparation work for high-Te channels– To be implemented in NSTX-U – 10keV (on the back burner)

Page 4: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Technical Issues

• Plan is to complete more of existing hardware– 7 unused fiber – one bundles sees RF NB– 16 unused sample-and-hold slots– Changes will occur in the polychromator room

• Develop a technique to unglue output end of fiber bundles – tricky but feasible

• Reroute a large number of fiber bundles– Split bundles need to be physical close – order of 6”– Long sequence of activities, which cannot be stopped before

MPTS is back online ≥ 5 months• Upgrade includes the construction of a fourth

polychromator “tower”• All new polychromators and ancillary hardware need to

be ready at the end of FY10 experimental run• Massive calibration work following successful hardware

installation

Page 5: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Polychromator Stacked in Towers

• Current 3 “tower” each house 10 polychromators

• Each polychromator is attached to a movable shelf– Split bundles need to be

next to each other vertically

• The fourth tower will have 12 shelves

Page 6: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Seven fiber bundles remain unused

Seven unused bundles indicated in green R= 31.8, 86.4, 96.3, 104.9, 112.5, 154.6, 157.7 cm

Page 7: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Gradient location database

• 1446 shots from 2008

• Use spline Te and ne profiles to compute the location of maximum gradients, average over times 0.15s – 0.9*max(ts_time)

• Database includes 29 shots suggested by Rajesh Maingi

• Use this data to identify new channel locations

Page 8: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Location of Te vs. location of ne

Distribution plot

Page 9: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Location of Te vs. location of ne

Distribution plot redux

Shots suggested by R. Maingi

Page 10: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Location of Te vs. location of ne

2D histogram plot

Page 11: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Histogram of Te location

3

1 2 split bundle unused

Phase 1Phase 2Phase 3Unused

Page 12: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Histogram of ne location

3

1 2 split bundleunused

Phase 1Phase 2Phase 3Unused

Page 13: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Comments for Team• Rajesh Maingi

– To better resolve the H-mode pedestal gradients, I suggested the spatial resolution be optimized from ~R=141-147cm. Practically this means adding 4-5 channels.

– Shell works best with smaller gap• Jon Menard

– I am concerned about LLD being successful in increasing D pumping– and forcing us to run larger outer gaps to reduce metal influx

– What range of outer gaps would the proposals below support?, i.e.– have good gradient resolution for H-mode for our typical profiles.

– Some of our transport barrier shots are clearly under-resolved in– the core, so this might warrant some additional coverage there.

– Crudely, I tend to think resolving the edge is 2-3x more important– than the core programmatically

• Joel Hosea– Good documentation of pedestal foot, re ELMS

• Ben LeBlanc– The outermost bundle “sees” the BN limiter – antenna was moved inward in 2004– The bundle will not be instrumented at this time.

Page 14: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Use Existing Data to Estimate Error

• Found among 2008 shots six pairs of successive plasmas: (S217 open & S218 open), followed by (S217 open & S218 Shut)

• Check shots for similar time evolution etc.• Took data between 0.05s and 0.5s -- avoid saturation• Compare data with both shutters open – Tef0, dTef0,

nef0 – with data with one shutter closed – Tef1, dTef1, nef1

• Select radial positions with raw signal (S218 shot/open) of 0.3 or 0.5.

Page 15: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Fiber Bundle divided in Two

Page 16: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Fiber Bundle divided in Three

Page 17: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

A Suggestion…Revision June 2009

• Propose 10 new channels, but will aim at 12– Cannot fit more channels in the schedule

• One new radial channels at R=154.6 cm (unused FB)• One new radial channels at R=31.8 cm (unused FB)• Four to six(?) new radial channels in “pedestal” region

– Done by splitting instrumented bundles in two• No unused bundles available

– Location of higher-resolution channels to be chosen by team/experts’ recommendation

• 2008 data suggest centering around 141 cm

– How far in before splitting bundles is no longer useful

• Four to six in the core and ITB region– Four unused bundles in the core region

Page 18: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Edge Pedestal Density

Phase 1Phase 2Phase 3Unused

Page 19: Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009

Te ITB Profile

Phase 1Phase 2Phase 3Unused