learning from the m-iwrm communication outreach between ...€¦ · the tsl & slb project...
TRANSCRIPT
![Page 1: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/1.jpg)
Learning from the M-IWRM Communication Outreach between the Tonle Sap & Songkhla Lake Basins
3rd MRC Summit2‐3 April 2018, at Sokha Hotel, Siem Reap Province
By Hell Tony, Secretariat general, Tonle Sap AuthoritySin Viseth, Director, Department of Exploitation & Conservation
![Page 2: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/2.jpg)
ContentI. Project Aim and Location
II. Key TB/Communication issues and dealing by project
III. Key achievement to date
IV. Opportunities for future cooperation and benefits
V. Learning from the communication outreach project
![Page 3: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/3.jpg)
I. Project’s Aim
The project aims for good resource governance in
support of prosperous and healthy Tonle Sap and
Songkhla Lakes, for the benefit of sustainable
livelihoods, and serving as an example for inspiration
elsewhere.
![Page 4: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/4.jpg)
BangkokSiem Reap
Phnom Penh
Songkhla
Borders are indicative
0 100 200 km
Songkhla Lake
TonleSap
Lake
CAMBODIA
THAILAND
VIET NAM
LAOS
MALAYSIA
MYAN-MAR
Project sites
SLBBasin population (2010):
1.6 millionBasin area: 8,495 km2Lake area: 1,040 km2
TSLBasin population (2008): 4.9 millionLake area: 2,700 km2 (dry season)
14,900 km2 ( maximum, in
2000)
![Page 5: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/5.jpg)
II. Key TB/Communication issues which are dealt by the project
- Cooperation and benefits sharing between
Cambodia and Thailand through Communication
Outreach Process (COP)
- Using COP to share knowledge and targeted
beneficiaries to the stakeholders of both riparian
countries.
![Page 6: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/6.jpg)
III. Key Achievement to date
3.1. Process oriented:
A. Communication outreach process: Method
The Communication Outreach Process through the
following sessions have been conducted:
• Exchange visit (4 joint sessions),
• Public awareness raising (4 session in TSL) and
shadow play (one session in Songkhla Lake),
• VDO exchange workshop (one joint session),
![Page 7: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/7.jpg)
III. Key Achievement to date (cont.)• Groups and video clips (two joint sessions),
• Line group (one joint session),
• Facebook and YouTube (video clips), and
• Inspiring products to increase stakeholders’ exposure
to the work of joint exchange learning between the
Tonle Sap and Songkhla lakes by providing a
mechanism for disseminating the project information
to wide-audience.
![Page 8: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/8.jpg)
Some Pictures of Exchange Visits between TSL and SLB
![Page 9: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/9.jpg)
Some pictures of Joint VDO Training
![Page 10: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/10.jpg)
Some pictures of Public Awareness in 2016-2017
10
េ កគង ថញិ េមឃុែំ្រពកហ្លួង
![Page 11: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/11.jpg)
Communication outreach process: Overall flow
Project Implementation Unit of the TSL & SLB
Regional MRC M‐IWRMP
Pilot CF’s Facilitators and Beneficiaries of the
TSL & SLB Project
Stakeholders of the TSL & SLB
Project
Stakeholders of the TSL & SLB
Project
Stakeholders of the TSL & SLB
Project
Communication Mechanism
National Coordinators of CNMC & TNMC
![Page 12: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/12.jpg)
B. Mechanism for communication outreach established and functioned: Structure of the Sdey Kraum-Rohal Suong CF (Community Pilot Project)
LeaderMr Py Hoeut
Deputy Leader #1Mr Hor Sam Art
In charge of Conservation Development
Deputy Leader #2Mrs Mak Srey
SecretaryMr Khav
Sorn
CashierMrs Nut Hai
ExtensionMrs NgiemSamnang
Youth GroupMr Liem Samuth
Guard & Ranger of Conservation Site
Mr Saing San.
Adviser Mr Neom Chheang
![Page 13: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/13.jpg)
Rang Pen Bei Tor Conservation Zone/តបំនអ់ភរិក ងំេពនប ីត
![Page 14: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/14.jpg)
3.2. Tangible output:
IWRM-based lake and resources management and
conservation (three training workshops organized)
Community capacity building in climate change
adaptation, fish patrolling, community management,
and lake management,
Job training on producing palm tree soap and smoke
fish to improve community income,
![Page 15: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/15.jpg)
3.2. Tangible output: (cont.)
Women empowerment in communities fisheries conservation, National Report on Stakeholder Mapping and
Analysis Report on fish catch monitoring Joint Reports on Implementation Site (CCA,
Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and lake governance).
![Page 16: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/16.jpg)
Some pictures:Training Workshop on IWRM Mainstreaming
(TSL and SLB Project)
![Page 17: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/17.jpg)
Picture of consultation workshop on stakeholder mapping and analysis report
![Page 18: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/18.jpg)
Fish Catch monitoring in the project site
![Page 19: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/19.jpg)
Reporting the Fisheries Monitoring Results and Experiences Learnt
![Page 20: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/20.jpg)
IV. Opportunities for future cooperation and benefits
Agreed on continuing cooperation and knowledge & information sharing on lake management and conservation
Agreed to continue IWRM-based dialogue and communication outreach between both lakes’ communities
Joint implementation of action plan in both lakes to response to SDG for sustainable livelihoods and healthy lakes
![Page 21: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/21.jpg)
V. Learning from the communication outreach project
5.1. Through different tools of communication outreachand mechanism, opportunities for stakeholders’ interactionand knowledge and experiences exchange in: Lake management Fisheries management, Natural resources conservation, Women empowerment Climate change responsive
![Page 22: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/22.jpg)
V. Learning from the communication outreach project (cont.)
5.2. The action-learning process, messages, products andother outreach efforts resulted in :
Increasing stakeholders’ support for the sustainable lakemanagement,
Awareness of the locals’ engagement to sustain the lakemanagement and governance
willingness to engage in the future activities on lakemanagement and cooperate between both sister lakes(Between countries) .
![Page 23: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/23.jpg)
V. Learning from the communication outreach project (cont.)
5.3. M-IWRM is implemented at the community level
which will enable the World Bank, MRC and both,
CNMC and TNMC, to collect the SDG 6.5.1 indicators
(designed by UN-Water).
SDG 6.5.1 indicators are the key components of IWRM
SDG 6.5.2 indicators are component of TB issues.
![Page 24: Learning from the M-IWRM Communication Outreach between ...€¦ · the TSL & SLB Project Communication ... Fisheries, & Woman Empowerment) and Joint Final Report (Livelihood and](https://reader034.vdocuments.mx/reader034/viewer/2022050308/5f7080d200adc160dd3d5c28/html5/thumbnails/24.jpg)
Thank for your kind attention