  • VILLA MONTESSORI NEEDED A NEW CAMPUS

    THE EXISTING CAMPUS WAS READY FOR AN UPGRADE

    THE BOARD DECIDED TO MAKE A MOVE AND

    CHOSE A BETTER WAY TO BUILD

    www.ModularSolutionsLtd.com

  • High Vaulted Ceilings

    Concrete Floors

    Storefront Glass

    Specialty Lighting

    Bright Color Schemes

    Green Building Design

  • MODULAR SOLUTIONS, LTDA DESIGN-BUILD CAMPUS SOLUTION

    VILLA MONTESSORI HAD ACCESS TO DONATED ARCHITECTURAL SERVICES, OUR TEAM HELPED FACILITATE

    ALL THE MISSING PIECES, AND COORDINATE A WORKING SET OF DRAWINGS FOR THE CITY AND THE STATE

    TO APPROVE FOR CONSTRUCTION TO BEGIN

    Providing Architectural , General Contractor, & Prefabrication Plant Services Accelerating The Construction Schedule

  • CONCURRENT SITE WORK & FACTORY FABRICATION

    SITE WORK BEING DONE WHILE MPANELS ARE FABRICATED OFF-SITE IN THE PLANT

    www.ModularSolutionsLtd.com

  • MPANELS ARE TRANSPORTED TO SITE WITH PANEL IDENTIFICATION & READY TO INSTALL QUICKLY & EFFICEINTLY

    CONCURRENT SITE WORK & FACTORY FABRICATION

  • COMING TOGETHER IN DAYS DAY 1

    WATERTIGHT AND CLOSED UP WITHIN HOURS, READY FOR FINISHES IN DAYS

  • COMING TOGETHER IN DAYS DAY 3

    PREPARATION OF EXTERIOR FOR FINISHES

  • COMING TOGETHER IN DAYS- DAY 7

    INTERIOR FINISHES , ELECTRICAL, COMMUNICATION , FIRE, PREFABRICATED READY TO INSTALL ON SITE

  • COMING TOGETHER IN DAYS- DAY 9

    SITE WORK, INTERIOR FINISHES, AND EXTERIOR FINISH TEAM ALL WORKING SIMULTANELUSLY

  • COMING TOGETHER IN DAYS- DAY 10

    SITE WORK, INTERIOR FINISHES, AND EXTERIOR FINISH TEAM ALL WORKING SIMULTANELUSLY

  • COMING TOGETHER IN DAYS-DAY 25

    MAKING THE UTILITY CONNECTIONS, READY TO GO LIVE

  • COMING TOGETHER IN DAYS DAY 45

    FINAL FINISHES AND MAGIC TOUCHES THAT MADE THIS A REALLY SPECIAL PROJECT

  • COMING TOGETHER IN DAYS DAY 65

    SIDEWALKS, FINAL GRADE, LANDSCAPE : ALL THE FINISHING TOUCHES , ALMOST THERE

  • READY TO OCCUPY DAY 75

    10,000 square ft campus from start to occupancy in less than 90 days

  • A GREAT LOOKING CAMPUS

  • FOR MORE INFORMATION CONTACT US:

    www.ModularSolutionsLtd.com

    M o d u l a r S o l u t i o n s , L t d

    Mailing Address: P O Box 15507-Phoenix, AZ 85060

    Physical Plant Address: 5439 S. 43rd Avenue- Phoenix, AZ 85041

    Email: information@Mod-sol.com

    Toll Free Phone: 800-441-8577 x 1 (sales) Local Arizona: 602-952-9741 x 1 (Sales)

    Website: www.ModularSolutionsLtd.com

    You tube Channel: https://www.youtube.com/user/Modularsolutionsltd

    Licensed/bonded/insured in multiple states

    A B E T T E R W A Y T O B U I L D

    mailto:information@Mod-sol.comhttp://www.modularsolutionsltd.com/https://www.youtube.com/user/Modularsolutionsltd

  • COOPERATIVE PARTNERS SINCE 2000

    www.ModularSolutionsLtd.com A B E T T E R W A Y T O B U I L D