lean manufacturing system

41
NAZA AUTOMOTIVE MANUFACTURING SDN BHD [Company No.: 591026-M] Page 1 Lean Manufactur ing System Kamarulzaman Darus PJN Director of Manufacturing NAM [email protected] +6012-277-2059 Graduated in B.Sc. Mechanical Graduated in B.Sc. Mechanical Engineering from Leeds University, Engineering from Leeds University, UK. UK. Had been in the Automotive Had been in the Automotive Manufacturing Business for more than Manufacturing Business for more than 25 years. 25 years. Had been responsible in key areas of Had been responsible in key areas of Production and Planning, Production and Planning, Manufacturing Engineering, Plant Manufacturing Engineering, Plant Engineering, Product Research and Engineering, Product Research and Development. Development. Currently, the Director of Currently, the Director of Manufacturing – responsible in all Manufacturing – responsible in all aspects of Manufacturing for Naza aspects of Manufacturing for Naza

Upload: kamarulzaman-darus

Post on 07-May-2015

1.334 views

Category:

Automotive


0 download

TRANSCRIPT

Page 1: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 1

Lean Manufacturi

ngSystem

Kamarulzaman Darus PJNDirector of Manufacturing NAM

[email protected]+6012-277-2059

Graduated in B.Sc. Mechanical Engineering from Graduated in B.Sc. Mechanical Engineering from Leeds University, UK. Leeds University, UK.

Had been in the Automotive Manufacturing Had been in the Automotive Manufacturing Business for more than 25 years.Business for more than 25 years.

Had been responsible in key areas of Production Had been responsible in key areas of Production and Planning, Manufacturing Engineering, Plant and Planning, Manufacturing Engineering, Plant Engineering, Product Research and Development.Engineering, Product Research and Development.

Currently, the Director of Manufacturing – Currently, the Director of Manufacturing – responsible in all aspects of Manufacturing for responsible in all aspects of Manufacturing for Naza Automotive Manufacturing.Naza Automotive Manufacturing.

Page 2: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 2

Basic Philosophy Of Lean Production System

1.Quality guaranteed in process1) In production line, only 100% quality guaranteed parts can be transferred

to the subsequent process.

2.Cost reduction activities1) Elimination of overload, waste and

unevenness

(Defect parts will not go to the next process) Common Basic Philosophy

Lean Production System

Consistent basic philosophy for company management

Manager

Staff

Worker

Top Management

Lean Production System is a measure to realize the basic Philosophy

Page 3: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 3

How to Operate A Factory Base On Lean Production System

Page 4: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 4

Why Quality To Be Guaranteed In Process?

Page 5: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 5

Just in Time

Page 6: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 6

Leveled Production System

Page 7: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 7

Leveled Production System

Page 8: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 8

Leveled Production System

Page 9: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 9

Leveled Production System (Manpower Allocation)

Page 10: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 10

Leveled Production System (Logistics)

Page 11: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 11

Leveled Production System (Averaging Calculating Conditions)

Page 12: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 12

Leveled Production System (Process Arrangement)

Page 13: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 13

Leveled Production System (Establish Standard Working Time)

Page 14: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 14

Leveled Production System (Process Arrangement – Grouping Method)

Page 15: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 15

Leveled Production System (Process Arrangement – Short Line Management)

Page 16: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 16

Leveled Production System (Process Arrangement – A-B Control System)

Page 17: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 17

Leveled Production System (Process Arrangement – Fixed-Stop Position)

Page 18: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 18

Leveled Production System (Process Arrangement On-Line Inspection and Repair)

Page 19: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 19

Leveled Production System (Process Arrangement – ANDON)

Page 20: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 20

Leveled Production System (Process Arrangement – Parts Request ANDON)

Page 21: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 21

Leveled Production System (Process Arrangement – Buffer)

Page 22: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 22

Leveled Production System (Process Arrangement – Scratch Prevention Cover)

Page 23: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 23

Leveled Production System (Process Arrangement – ALC – Automated Line Controller Concept)

Page 24: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 24

Leveled Production System (Process Arrangement – ALC System)

Page 25: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 25

Leveled Production System (Process Arrangement – ALC Production Order System)

Page 26: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 26

Leveled Production System (Process Arrangement – ALC - Body Shop Pokayoke)

Page 27: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 27

Leveled Production System (Process Arrangement – ALC - TF Shop Pokayoke for Torque)

Page 28: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 28

Leveled Production System (Process Arrangement – ALC - TF Shop Pokayoke for Parts Selection)

Page 29: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 29

Leveled Production System (Process Arrangement – ALC - KAIZEN)

Page 30: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 30

Leveled Production System (Process Arrangement – ALC – Synchronized Process Layout)

Page 31: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 31

Leveled Production System (Process Arrangement – ALC – Sequenced Supply System)

Page 32: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 32

Leveled Production System (Process Arrangement – ALC – Eliminate MUDA (Waste) Thoroughly)

Page 33: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 33

Leveled Production System (Process Arrangement – Wide Dolly Friction Conveyor)

Page 34: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 34

Leveled Production System (Process Arrangement – Assessment Method for Workload Hardship Level)

Page 35: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 35

Leveled Production System (Process Arrangement – Assessment Method to determine Quantity of Working Hardship Level TVAL

Page 36: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 36

Leveled Production System (Process Arrangement – Door-less System – Reduce Hardship Level)

Page 37: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 37

Leveled Production System (Process Arrangement – Working Posture Improvement – Reduce Hardship Level)

Page 38: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 38

Leveled Production System (Process Arrangement – Labor Saving Equipment – Reduce Hardship Level)

Page 39: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 39

Leveled Production System (Process Arrangement – Robot System – Reduce Hardship Level)

Page 40: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 40

Leveled Production System (Process Arrangement – Intelligent Pre-set Automation – Reduce Hardship Level)

Page 41: Lean Manufacturing System

NAZA AUTOMOTIVE MANUFACTURING SDN BHD[Company No.: 591026-M]

Page 41

Leveled Production System (Process Arrangement – Synchronized Wagon Dolly – Reduce Hardship Level)