lean manufacturing implementation challenges

Upload: deepak-rustagi

Post on 14-Apr-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    1/27

    111

    The Soft Stuff is Hard

    Lean Manufacturing Implementation

    Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    2/27

    222

    Outline

    1) Senior leadership engagement2) Engineer and Middle Management

    engagement

    3) Operator and staff engagement

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    3/27

    333

    1) Senior leadership engagement

    Leadership commitment and culture Strategic planning

    Goal alignment and Customer focus

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    4/27

    44

    Lean Manufacturing Implementation Challenges

    1.1) Leadership commitment and cultureTraditional Culture Lean Culture

    Internal Focus Customer Focus

    Managers Direct Managers Enable / Teach

    Maximise Functional Silos Work in Cross Functional Inter-disciplinary teams

    Expert Driven Process Driven

    Blame People & Departments Focus on root Causes

    Guard Information & Discuss Irregularly Share Information & Discuss Often

    Benchmark to Justify not improving just as good Strive for Excellence & drive out waste

    Rewards; Individual Rewards; Groups

    Supplier is the Enemy Supplier is an Ally

    Volume lowers cost Removing waste lowers cost

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    5/27

    55

    Lean Linkages for Sustained Change

    STRUCTURE

    PS

    PROCESS

    TOOLS

    LEAN

    Q

    C

    FORMAL

    AND SYSTEMS

    PHILOSOPHY

    Lean Manufacturing Implementation Challenges

    What does a business

    need to do toenhance its chances

    of success?

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    6/27

    66

    TAKT TIMETAKT TIMETAKT TIMETAKT TIME PHYSICAL LAYOUT

    PITCH CYCLE TIME

    5S PULL VALUE STREAM MAPPING

    KAIZEN STANDARD WORK

    KANBAN VISUAL CONTROLS

    WASTE

    LEVELING ERROR PROOFING

    LEAN TOOLS

    Lean Manufacturing Implementation Challenges

    Why do leantools inthemselves failto sustain the

    lean culture?

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    7/27

    777

    Strategic Improvement

    Step Change Improvement

    Continuous Improvement

    L3

    L2

    L1

    0

    10

    20

    30

    40

    50

    1-Jan

    1-Feb

    1-Mar

    1-Apr

    1-May

    1-Jun

    1-Jul

    1-Aug

    1-Sep

    1-Oct

    1-Nov

    1-Dec

    Coaching, Daily Problem

    Solving & Value Stream

    Projects

    Business Stategy,

    Leadership

    & Goal Alignment

    Responsible &

    Accountable for

    performance, problem

    solving & work area

    Leadership Structure and Purpose

    0

    10

    20

    30

    40

    50

    1-Jan

    1-Feb

    1-Mar

    1-Apr

    1-May

    1-Jun

    1-Jul

    1-Aug

    1-Sep

    1-Oct

    1-Nov

    1-Dec

    0

    10

    20

    30

    40

    50

    1-Jan

    1-Feb

    1-Mar

    1-Apr

    1-May

    1-Jun

    1-Jul

    1-Aug

    1-Sep

    1-Oct

    1-Nov

    1-Dec

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    8/27

    88

    Stop to fix problems

    Go to the gemba (where the truth is

    ) Empower staff to solve problems

    Correct the problem 24 hours

    Continuous, small-step improvement Go see, ask why and show respect

    Lean Manufacturing Implementation Challenges

    Lean Philosophy

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    9/27

    99

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    10/27

    1010

    Lean Manufacturing Implementation Challenges

    Preparing the business for Lean Implementation

    Short burst of theoryBig chunk of hands-on learning

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    11/27

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    12/27

    1212

    Lean Manufacturing Implementation Challenges

    Develop a rollout plan

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    13/27

    1313

    Lean Manufacturing Implementation Challenges

    Sample implementation plan

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    14/27

    1414

    Lean Manufacturing Implementation Challenges

    1.3) Goal alignment and customer focus

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    15/27

    1515

    1.3) Goal alignment and customer focus

    To customers (external/internal)

    To company and business goals

    Meaningful for the teams

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    16/27

    161616

    Lean Manufacturing Implementation Challenges

    Leadership coach/mentor/teacher

    SPIRIT of Lean Mentorship:

    If the learner hasnt learned, the teacher hasnt taught

    John Shook

    If the learner hasnt learned, the teacher hasnt taughtJohn Shook

    Why isLeadership

    imperative toa successfullean

    implementation?

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    17/27

    171717

    2) Engineer and Middle ManagementEngagement

    Value stream projects

    Work on the right problems at the right

    time Problem solving

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    18/27

    181818

    2.1) Value stream projects

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    19/27

    1919

    IN OUTValue Add

    Non Value Added

    Waste

    Waiting

    Overproduction

    Rejects

    MotionProcessing

    Inventory

    Transport

    Staff Utilisation

    (Typically 5-15% value add)

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    20/27

    2020

    Lean Manufacturing Implementation Challenges

    2.2) Work on the right problems at the right time

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    21/27

    212121

    2.3) Problem Solving

    Lean Manufacturing Implementation Challenges

    Whatchallenges doEngineers

    face inimplementing

    lean?

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    22/27

    222222

    3) Operator and staff engagement

    Go see, show respect and ask why Mini business

    Process confirmation

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    23/27

    2323

    Lean Manufacturing Implementation Challenges

    Core value respect for people

    Teaching Is Our #1 Job3.1) Go see, show respect and ask why

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    24/27

    242424

    3.2) Mini business

    Lean Manufacturing Implementation Challenges

    Set 20-50%

    improvement

    targets

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    25/27

    2525

    Process Confirmation Sheet:

    Dedicated time daily

    Go, Look, See

    Lean Manufacturing Implementation Challenges

    3.3) Process confirmation

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    26/27

    262626

    Summary

    Active leadership commitment Choose the right projects so they are

    strategically aligned

    Go see, show respect and ask why

    Lean Manufacturing Implementation Challenges

  • 7/27/2019 Lean Manufacturing Implementation Challenges

    27/27

    272727

    Thank you and Questions

    Lean Manufacturing Implementation Challenges