lean essentials - catalyst connection...step 1: establish takt time takt time = customer demand rate...
TRANSCRIPT
![Page 1: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/1.jpg)
Lean EssentialsIdentifying and Eliminating Waste
![Page 2: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/2.jpg)
Welcome
Introduction to Paper Plane Inc.
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Wrap-up – “Time to Fly”
Agenda
![Page 3: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/3.jpg)
Welcome
Introduction to Paper Plane Inc.
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Wrap-up – “Time to Fly”
Agenda
![Page 4: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/4.jpg)
![Page 5: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/5.jpg)
“It will only fly once”
![Page 6: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/6.jpg)
Production Process Orientation
Raw
Material
Assembly
Work
Centre 1
Assembly
Work
Centre 2
Assembly
Work
Centre 3
Assembly
Work
Centre 4
Finished
Goods
PUSH PUSH PUSH PUSH PUSH
(paper) (planes)
![Page 7: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/7.jpg)
JOB ALLOCATION
![Page 8: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/8.jpg)
Engineer
Quality Control
• Record Throughput Time Studies (Green Paper) (FIFO)• Record defects
• 1 defect is equal to ($20)• Record WIP Level
• 1 plane = ($10)
• Ensure PPI quality standards are being reached and stop line if there is rework or defects
• Ensure that all employees are focused on quality not output
• “Work at a Comfortable Pace”
![Page 9: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/9.jpg)
Assembly Work Centre 1
Fold up in half long way
![Page 10: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/10.jpg)
Assembly Work Centre 2
Fold first corner down on each side
![Page 11: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/11.jpg)
Assembly Work Centre 3
Second fold of wing in each side
Draw a Star with a coloured marker on one side
![Page 12: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/12.jpg)
Assembly Work Centre 4
Third fold of each wing on each side
Spruce Goose
Place in finished goods inventory
![Page 13: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/13.jpg)
• All shifts are 20 minutes
• Keep busy at all times
• Yell if you need work
• Handle all parts first-in, first-out (FIFO)
• Stay at your workstation
• The boss is always right!
![Page 14: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/14.jpg)
Welcome
Introduction to Paper Plane Inc.
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Round 3 Training
Production Round 3
Implementation
Wrap-up – “Time to Fly”
Agenda:
![Page 15: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/15.jpg)
Round One: Debrief
• Discuss results
• Discuss the process
• Lessons learned
• Relationship to real world
• “What if” scenarios
• Continuous improvement
![Page 16: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/16.jpg)
Welcome
Introduction to Paper Plane Inc.
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Wrap-up – “Time to Fly”
Agenda:
![Page 17: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/17.jpg)
Reduced Lead Time
“One of the most noteworthy accomplishments in keeping the price of Ford products low is the gradual shortening of the production cycle. The longer an article is in the process of manufacture and the more it is moved about, the greater is its ultimate cost.”
— Henry Ford, 1926
![Page 18: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/18.jpg)
Lean is:
“A systematic approach to identifying and eliminating waste (non-value added activities) through continuous improvement by flowing the product at the pull of the customer in pursuit of perfection.”
— The MEP Lean Network
“Getting the most out of the resources you already have”- Eric MacDonald
Catalyst Connection
Extremely, Smart, Handsome, Talented, Etc…
Defining Lean
![Page 19: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/19.jpg)
Definition of Value-Added
Value-Added
Any activity that increases the market form or function of the product or service. These are things the customer is willing to pay for.
Non-Value-Added
Any activity that does not add market form or function or is not necessary. (These activities should be eliminated, simplified, reduced, or integrated.)
![Page 20: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/20.jpg)
Value-Added
Non-Value-Added
• Defects
• Overproduction
• Waiting
• Not Developing People
• Transportation
• Inventory
• Motion
• Excess Processing
Lean = Eliminating Waste
Typically 95% of all lead time is non-value-added.
![Page 21: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/21.jpg)
What wastes are apparent in your organization?
![Page 22: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/22.jpg)
Eight Wastes:
![Page 23: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/23.jpg)
Overproduction
• Making more than is required by the next process
• Making earlier than is required by the next process
• Making faster than is required by the next process
Causes of overproduction:• Just-in-case logic
• Misuse of automation
• Long process setup
• Uneven scheduling
• Unbalanced workload
• Over engineered
• Redundant inspections
![Page 24: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/24.jpg)
• Any supply in excess of a one-piece flow through your manufacturing process
Causes of excess inventory:
• Need for buffer against inefficiencies and unexpected problems
• Product complexity• Unleveled scheduling• Poor market forecast• Unbalanced workload• Misunderstood communications• Reward system- buy bulk• Unreliable shipments by suppliers
Inventory
![Page 25: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/25.jpg)
• Inspection and repair of material in inventory
Causes of defects:
• Weak process control
• Deficient planned maintenance
• Inadequate education, training, or work instructions
• Product design- non-manufacturable
• Customer needs not understood
Defects
![Page 26: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/26.jpg)
• Effort that adds no value to the product or service from the customers’ viewpoint
Causes of processing waste:
• Product changes without process changes
• Just-in-case logic
• True customer requirements not clearly defined
• Over-processing to accommodate downtime
• Lack of communication
• Redundant approvals
Excessive Processing
![Page 27: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/27.jpg)
• Idle time created when waiting for…?
Causes of waiting waste:
• Unbalanced workload
• Unplanned maintenance
• Long process setup times
• Misuses of automation
• Upstream quality problems
• Uneven scheduling
SLIDE 27
Waiting
![Page 28: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/28.jpg)
• The waste of not using people’s mental, creative, and physical abilities
Causes of people waste:
• Old guard thinking, politics, the business culture
• Underutilized people
• Poor hiring practices
• Low or no investment in training
• Low pay, high turnover strategy
Not Developing People
![Page 29: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/29.jpg)
• Any movement of people or machines that does not add value to the product or service
Causes of motion waste:
• Poor people or machine effectiveness
• Inconsistent work methods
• Unfavorable facility or cell layout
• Poor workplace organization and housekeeping
• Extra “busy” movements while waiting
Motion
![Page 30: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/30.jpg)
• Transporting parts and materials around the plant
Causes of transportation waste:
• Poor plant layout
• Poor understanding of the process flow for production
• Large batch sizes, long lead times, and large storage areas
Transportation
![Page 31: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/31.jpg)
What Can We do About Wastes?
Non-Value-Added
Any activity that does not add market form or function or is not necessary.
These activities should be eliminated, simplified, reduced, or integrated. How???
![Page 32: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/32.jpg)
Building Blocks- The House of Lean
Quick Changeover
Standardized Work Batch Reduction Teams
Quality at Source
5S SystemVisual Plant Layout
POUS
Cellular/FlowPull/Kanban TPM
Continuous Improvement
ValueStreamMapping
Culture – Employee Engagement - Morale
![Page 33: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/33.jpg)
Welcome
Introduction to Buzz Electronics
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Wrap-up – “Time to Fly”
Course Agenda:
![Page 34: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/34.jpg)
Round Two: Company Instruction
Learn how to implement new Lean techniques:
• Pull System/Kanban
• Eliminate Bottle Neck
![Page 35: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/35.jpg)
Push versus Pull Systems
Push System
Resources are provided to the consumer based on forecasts or schedules
Pull System
A method of controlling the flow of resources by replacing only what has been consumed
![Page 36: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/36.jpg)
Pull System
Pull System is a flexible and simple method of controlling or balancing the flow of resources
Eliminating waste
Pull System consists of:
• Production based on actual consumption
• Small lots
• Low inventories
• Management by sight/Kanban
• Better communication
![Page 37: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/37.jpg)
Visual Controls
• A “9th Waste” – Excessive Questions
• Three responses when questions are not answered:
• Do nothing and just wait until the answer shows up
• Go hunting for the answer
• Make stuff up and go with the best guess
![Page 38: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/38.jpg)
Eliminating Bottlenecks via Operator Balance
3 Steps:
1. Establish Takt Time
2. Review Work Sequence
3. Combine Work to Balance
Process
![Page 39: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/39.jpg)
Step 1: Establish Takt Time
Takt Time = Customer Demand Rate
Takt Time = (Work Time Available ÷ Number of Units Sold)
Takt Time = (1200 seconds ÷ 115 planes) = 10.4 sec/board
Cycle Time ÷ Takt Time = Minimum Number of People
Goal: Produce to Demand
![Page 40: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/40.jpg)
Step 2: Review Work Sequence
• Observe sequence of tasks each worker performs
• Break operations into observable elements
• Identify value-added versus non-value-added (NVA) elements and minimize NVA
• Study machine capacity, cycle times and changeover times
![Page 41: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/41.jpg)
Step 3: Combine Work to Balance Process
0
5
10
15
20
A B C D E
0
5
10
15
20
A B C D E
Takt Time = 10 seconds
Unbalanced Line Balanced Line
Operations
Seco
nd
s
Operations
Seco
nd
s
SLIDE 41
![Page 42: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/42.jpg)
Welcome
Introduction to Buzz Electronics
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Wrap-up – “Time to Fly”
SLIDE 42
Course Agenda:
![Page 43: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/43.jpg)
Round Two: Debrief
• Discuss results
• Discuss the process
• Lessons learned
• Relationship to real world
• “What if” scenarios
• Continuous improvement
![Page 44: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/44.jpg)
Welcome
Introduction to Buzz Electronics
Production Round 1
Introduction to Lean Manufacturing
Round 2 Training
Production Round 2
Wrap-up – “Time to Fly”
SLIDE 44
Course Agenda:
![Page 45: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/45.jpg)
![Page 46: Lean Essentials - Catalyst Connection...Step 1: Establish Takt Time Takt Time = Customer Demand Rate Takt Time = (Work Time Available ÷ Number of Units Sold) Takt Time = (1200 seconds](https://reader031.vdocuments.mx/reader031/viewer/2022013010/5ee0962fad6a402d666bbfa0/html5/thumbnails/46.jpg)
Thank You