  • LEAN DESIGNLean Construction Congress 2018Pekka Metsi

  • Building on Innovation

    AGENDA

    • Our thoughts about the future• Main targets in MEP design• What’s happening today in tight schedule

    project management contract projects• Lean today• Lean tomorrow

  • Building on Innovation

  • Building on Innovation

  • Building on Innovation

    What is the main target in MEP design?

    WELLBEING IN BUILT

    ENVIRONMENT

  • Building on Innovation

    But there are other targets, too…

    • Good indoor environment quality• Realiable technical systems• Good energy efficiency• Low CO2• Easy maintenance, long life span

  • Building on Innovation

    …and there are project targets

    • Money • Time Schedule

    Are there any others?

  • Building on Innovation

    Example from hospital sector: design hours

    Normal Design 16 000 hoursProcument design 6000 hoursAdditional meetings, spec’s for procurement etc. 6000 hours(work typically done by the contractor)

    Waste 25%Additional works 25–50%

    • Project Management Contracting with fixed fee MEP contract

    Major reasons:CM contractor selected too late.Demand for full scale design for MEP contract though architect design is only 20% completed.And many technical aspects, provision of voids especially.

  • Building on Innovation

    On the other hand – Which way is easier?• …and more cost effective

  • Building on Innovation

    Example: Bill of Materials

    • When using COBIM 2012 requirements, only minor extra work to MEP Designers

    • Quality and accuracy of BIM models rises

    • All tenders have equal quantities• According to buildingSMART Finland,

    annual savings to whole industry:

    32-51M€

    Bill of Materials from MEP-designer to use for contractors

    Major reasons:• We have done it this way for decades!!!• Quantities are not ordered from Designers• Lack of clear contractual process when

    BIM-quantities differ from purchased quantities

    • Risk management is different / needs to be clear for all parties

  • Building on InnovationBuilding on innovation

    LEAN TODAY

  • Building on Innovation

    Low hanging fruits

    • More standardized design solutions and prefabrication• Better management of design time schedules (LastPlanner)• Better co’op, new processes (alliance, IPD.. happening already)• New ways of purchasing MEP contracting or

    earlier involvement of MEP contractors

  • Building on InnovationBuilding on innovation

    LEAN TOMORROW

  • Building on Innovation

    New technologies + new processes

    • Much more routine work done by computers/softwares• Mass customised design solution + machine learning• Minimized site MEP works and maximized prefabrication• New roles in construction projects for Leaning,

    Customercare, Operations and Maintenance development, Purchasing of Services and Goods ….

  • Building on Innovation

    Thank you.

    LEAN DESIGNAGENDADia numero 3Dia numero 4What is the main target in MEP design?But there are other targets, too……and there are project targetsDia numero 8Dia numero 9Example: Bill of MaterialsDia numero 13Low hanging fruitsDia numero 15New technologies + new processesDia numero 17