leader wp3 conceptual design status
DESCRIPTION
LEADER WP3 Conceptual Design Status. KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012. Luigi Mansani [email protected]. WP3 Tasks. Task 3.1 - Reference plant configuration of a LFR ( ANSALDO , CIRTEN, EA, JRC-IE, SRS) - PowerPoint PPT PresentationTRANSCRIPT
LEADER WP3 Conceptual DesignStatus
KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012
Luigi Mansani
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 2
WP3 Tasks
• Task 3.1 - Reference plant configuration of a LFR (ANSALDO, CIRTEN, EA, JRC-IE, SRS)
• Task 3.2 - SG damping pressure waves system design (MERIVUS, CIRTEN, ENEA)
• Task 3.3 - Primary system conceptual design of the ETDR (SCK•CEN, ANSALDO, EA, SRS)
• Task 3.4 - Secondary system conceptual design of the ETDR (EA, ANSALDO)
• Task 3.5 - DHR system conceptual design of the ETDR (ANSALDO, SCK•CEN)
• Task 3.6 - Plant layout of the ETDR (EA, ANSALDO)• Task 3.7 - Feasibility study of the flat-spiral-tube bundle steam generator
with integrated primary pump (MERIVUS)
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 3
Task 3.1 Status
Design changes of the ELSY configuration identified ELFR configuration defined and used as a reference for ALFRED Contractual deliverable D03 “Review and justification of the main design
options of the LFR reference plant” issued The following Mechanical Drawings have been issued:
LEADER 31 DMBX 024 Rev. 0 Reactor Block General Assembly LEADER 31 DMBX 025 Rev. 0 Fuel assembly outline LEADER 31 DMBX 026 Rev. 0 Inner vessel outline LEADER 31 DMBX 008 Rev. 0 Core lower grid outline LEADER 31 DMBX 009 Rev. 0 Core upper grid outline LEADER 31 DMBX 027 Rev. 0 Reactor vessel outline LEADER 31 DMBX 028 Rev. 0 Reactor cover outline LEADER 31 DMBX 029 Rev. 0 Steam generator outline LEADER 31 DMBX 030Rev. 0 Vessel support outline LEADER 31 DMBX 023 Rev. 0 DHR deep cooler outline
Technical DOC T51 has been included and merged in D03 Contractual deliverable D31 ELFR Summary Report to be issued at M36
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 4
Task 3.1: ELFR - Reactor Configuration
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 5
Task3.2: Status of the activity
Task Accomplished
T52 - Conceptual design of the SG damping pressure wave system and test mock-up has been issued
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 6
Task 3.3: Status
Design changes of the ELSY configuration identified ALFRED configuration (300 MWth) defined The following Mechanical Drawings have been issued:
LEADER 33 DMBX 013 Rev 0 Reactor Block General Assembly LEADER 33 DMMX 014 Rev 0 Fuel assembly outline LEADER 33 DMMX 015 Rev 0 Inner vessel outline LEADER 33 DMMX 016 Rev 0 Core lower grid outline LEADER 33 DMMX 017 Rev 0 Core upper grid outline LEADER 33 DMMX 018 Rev 0 Reactor vessel outline LEADER 33 DMMX 019 Rev 0 Reactor cover outline LEADER 33 DMMX 020_001 Rev 0 Steam generator outline LEADER 33 DMMX 020_002 Rev 0 Steam generator outline LEADER 33 DMMX 021 Rev 0 Vessel support outline LEADER 35 DMBX 036 Rev 0 Isolation Condenser outline
Technical document T57 drafted Contractual deliverable D32 (Summary Report) and Technical document
T66 /Main components thermo-mechanical sizing) to be issued at M36
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 7
Task 3.3: ALFRED - Reactor Configuration
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 8
Task 3.4: Status of the activity
Task Accomplished
Contractual deliverable DEL09 “Secondary cooling concepts & feasibility study of heat recovery of the ETDR” issued
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 9
Task Accomplished Contractual deliverable DEL10 “Conceptual design of the DHR system of
the ETDR (ALFRED)” issued
Task 3.5: Status of the activity
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 10
Technical document T53 “Seismic Response Spectra of the Reactor building of the ETDR (ALFRED) to be issued at M18
Contractual deliverable D13 “Plant layout and description of the containment system of the ETDR (ALFRED)” to be issued M30
Task 3.6: Status of the activity
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 11
The new partner M.E.Rivus is now officially in the project
New task “Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump” in-kind to MERivus has been added to the project
Contractual deliverable D39 “Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump” to be issued at M36
Task 3.7: Status of the activity
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 12
Del/Doc Title Task Responsible Date
D03 Review and justification of the main design options of the LFR reference plant 3.1 ANSALDO Issued
D09 Secondary cooling concepts & feasibility study of heat recovery of the ETDR 3.4 EA Issued
D10 Conceptual design of the DHR system of the ETDR 3.5 ANSALDO Issued
D13 Plant layout and description of the containment system of the ETDR 3.6 EA M30
D31 Reactor Design Summary Report of the reference LFR, further development recommendations 3.1 ANSALDO M36
D32 Reactor Design Summary Report of the ETDR, further development recommendations 3.3 SCK•CEN M36
D39 Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump 3.7 MERIVUS M36
T51 Description, functional sizing and drawings of the main components of the LFR plant 3.1 ANSALDO Included in
D3
T52 Conceptual design of the SG dumping pressure wave system and test mock-up 3.2 MERIVUS Issued
T53 Seismic Response Spectra of the Reactor building of the ETDR 3.6 EA M18
T57 Description, functional sizing and drawings of the main components of the ETDR 3.3 SCK•CEN Drafted
M24
T66 Main components thermo-mechanical sizing of the ETDR 3.3 SCK•CEN M36
WP3 Deliverables & Technical Documents
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 13
WP3 Milestone & Planning
Milestone Title Task Date Verification
M01 LFR updated reference configuration 3.1 Issued Report – T01
M04 ETDR reference configuration 3.3 Drafted M24 Report – D09, T57
M11 Reactor Design Summary Report of the reference LFR and the ETDR All M36 Report – D31, D32
November 2012
CompletedCompleted
Completed
LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 14
Thank you for your attention