LBT Q4 2008 Engineering/Software Review. TERC Tertiary Mirror Units Commissioning. Project Summary. Polish mirrors Coat mirrors Attach loadspreaders Integrate M3 units Coordinate s/w dev Acceptance test units Install on telescope. Highlights (Q1/2009). - PowerPoint PPT PresentationTRANSCRIPT
LBT Q4 2008 LBT Q4 2008 Engineering/SoftwareEngineering/Software
Review Review
TERCTERC
Tertiary Mirror Units Tertiary Mirror Units CommissioningCommissioning
6-Apr-20096-Apr-2009 LBT Q1 2009 Engineering RevieLBT Q1 2009 Engineering Revieww
Project SummaryProject Summary Polish mirrors Polish mirrors Coat mirrors Coat mirrors Attach loadspreaders Attach loadspreaders Integrate M3 units Integrate M3 units Coordinate s/w dev Coordinate s/w dev Acceptance test unitsAcceptance test units Install on telescopeInstall on telescope
6-Apr-20096-Apr-2009 LBT Q1 2009 Engineering RevieLBT Q1 2009 Engineering Revieww
Highlights (Q1/2009)Highlights (Q1/2009) SX unit amplifier faultsSX unit amplifier faults
Identified the situation leading to faultsIdentified the situation leading to faults Developed basic workaround Developed basic workaround Installed remote power switchInstalled remote power switch Ability to monitor amplifier remotelyAbility to monitor amplifier remotely
DX unit repair and installationDX unit repair and installation DX unit repairedDX unit repaired Installation scheduled (Q2)Installation scheduled (Q2)
6-Apr-20096-Apr-2009 LBT Q1 2009 Engineering RevieLBT Q1 2009 Engineering Revieww
Open IssuesOpen Issues TechnicalTechnical
Mirror safety devices pendingMirror safety devices pending Apparent amplifier firmware problemsApparent amplifier firmware problems
UMAC must be turned on many seconds UMAC must be turned on many seconds (~30) before servo units(~30) before servo units
Failure to do this puts the amplifier in a Failure to do this puts the amplifier in a state that will lead to a fault when enabledstate that will lead to a fault when enabled
This does NOT seem to be remotely This does NOT seem to be remotely resettableresettable
Revisions to amplifier firmware may correctRevisions to amplifier firmware may correct
6-Apr-20096-Apr-2009 LBT Q1 2009 Engineering RevieLBT Q1 2009 Engineering Revieww
Open IssuesOpen Issues
ScheduleSchedule Commissioning constrained by observingCommissioning constrained by observing
Financial Financial None/minorNone/minor
ResourceResource None, except that there is only 1 None, except that there is only 1
telescopetelescope
6-Apr-20096-Apr-2009 LBT Q1 2009 Engineering RevieLBT Q1 2009 Engineering Revieww
Progress (Q1/2009)Progress (Q1/2009)
Debug and fix DX unit Debug and fix DX unit Perform reliability tests on SX unit Perform reliability tests on SX unit Install DX cables on telescope (Q2)Install DX cables on telescope (Q2) Mount DX unit on telescope (Q2)Mount DX unit on telescope (Q2) Complete Commissioning/acceptance Complete Commissioning/acceptance
tests on both units (Q2+)tests on both units (Q2+) Design and build mirror safety Design and build mirror safety
devices? (Q2+)devices? (Q2+)
6-Apr-20096-Apr-2009 LBT Q1 2009 Engineering RevieLBT Q1 2009 Engineering Revieww
Planning (Q2/2009)Planning (Q2/2009)
Install DX cables on telescopeInstall DX cables on telescope Mount DX unit on telescopeMount DX unit on telescope Study amplifier problem (plan long term Study amplifier problem (plan long term
fix)fix) Complete Commissioning/acceptance Complete Commissioning/acceptance
tests on both units (Q2+)tests on both units (Q2+) Design and build mirror safety devices? Design and build mirror safety devices?
(Q2+)(Q2+)