lbt q2 2007 engineering review
DESCRIPTION
LBT Q2 2007 Engineering Review. TER Tertiary Mirror Units. Summary. Polish mirrors Coat mirrors Attach loadspreaders Integrate M3 assemblies Coordinate s/w dev Acceptance test units Install on telescope. Highlights (Q3/2007). SX unit installed on telescope - PowerPoint PPT PresentationTRANSCRIPT
LBT Q2 2007 Engineering LBT Q2 2007 Engineering ReviewReview
TERTER
Tertiary Mirror UnitsTertiary Mirror Units
26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww
SummarySummary Polish mirrorsPolish mirrors Coat mirrorsCoat mirrors Attach loadspreadersAttach loadspreaders Integrate M3 Integrate M3
assembliesassemblies Coordinate s/w devCoordinate s/w dev Acceptance test unitsAcceptance test units Install on telescopeInstall on telescope
26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww
Highlights (Q3/2007)Highlights (Q3/2007)
SX unit installed on telescope SX unit installed on telescope Both mirrors integrated with supports Both mirrors integrated with supports
Cabling completed and reterminated Cabling completed and reterminated
Basic software test completed Basic software test completed
26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww
Open IssuesOpen Issues
TechnicalTechnical Software not certified safeSoftware not certified safe Mirror installationMirror installation
Schedule/FinancialSchedule/Financial Pending software and need Pending software and need
ResourceResource Support needed for mirror installSupport needed for mirror install
26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww
Progress (Q3/2007)Progress (Q3/2007)
Loadspreader mounting (complete)Loadspreader mounting (complete) Software development (at milestone?)Software development (at milestone?)
Cannot be completed until both units Cannot be completed until both units installedinstalled
No further work/testing planned in 2007No further work/testing planned in 2007 Integration (SX nearly complete)Integration (SX nearly complete) Installation (SX unit installed)Installation (SX unit installed)
26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww
Progress (Q3/2007) cont.Progress (Q3/2007) cont.
SX wiring (complete)SX wiring (complete) Remove mirror cells (complete)Remove mirror cells (complete) Mount mechanisms to telescope (SX Mount mechanisms to telescope (SX
done)done) Loadspreader mounting (complete)Loadspreader mounting (complete) Mirror installation (Pending decision)Mirror installation (Pending decision) Commissioning (Pending)Commissioning (Pending)
26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww
Planning (Q4/2007)Planning (Q4/2007)
Pre-glass safety reviewPre-glass safety review Install SX mirror (depends on need)Install SX mirror (depends on need) Commissioning?Commissioning? Perform acceptance tests (requires Perform acceptance tests (requires
s/w)?s/w)? Operations to complete power to Operations to complete power to
UMACSUMACS