Lawn and Ophelia Green Stormwater Infrastructure Project
Oakcliffe Community OrganizationFebruary 12, 2020
![Page 2: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/2.jpg)
2
• Project History / Background
• Current Status / Project Scope
• Next Steps• Q & A
Meeting Agenda
![Page 3: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/3.jpg)
3
PROJECT HISTORY / BACKGROUNDProject Goal
• Manage 1.5-inches of runoff from 1.86 acres of impervious surface
Preliminary Design
• Contract awarded to ethos collaborative in 2018
• 60% design completed in December 2018
• 90% design completed in February 2019
• Estimated construction cost - $704k
• Project site identified as “suitable for divestment” by City in Open Space Plan
![Page 4: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/4.jpg)
4
INTERNAL PROJECT REVIEWInternal Review
• Completed June 2019
• Reduced scope
• Revised construction estimate - $460k
Adjusted Project Features
• Steel railing / iron fence
• Asphalt-surface path
• Ophelia Street bumpout
• Forbes Ave rain garden (small feature)
![Page 5: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/5.jpg)
5
CURRENT STATUS / PROJECT SCOPEDesign Funds Approved for 2020
Project Features
• Drainage improvements
• Rain garden (at existing playground)
• Subsurface stormwater detention
• Alternate surface path
• Landscaping
Inclusion of future amenities requires funding partners
![Page 6: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/6.jpg)
PWSA’s Hillcrest ProjectTypical rain garden with subsurface storage
![Page 7: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/7.jpg)
7
NEXT STEPS
2020 Complete Design
• Following revised scope of work
2021 Begin Construction
• Pending PWSA budget approval
![Page 8: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/8.jpg)
8
QUESTIONS?
![Page 9: Lawn and Ophelia Green Stormwater Infrastructure Project · 2020. 3. 11. · Green Stormwater Infrastructure Project. Oakcliffe Community Organization. February 12, 2020. 2 • Project](https://reader034.vdocuments.mx/reader034/viewer/2022052005/6018fe8ff32ae7511843c5a2/html5/thumbnails/9.jpg)
9
PROJECT CONTACTSProject ManagerJim Turner, P.E. Senior Project Manager(412) 255-8800 ext [email protected]
Communications Project ManagerRebecca Zito(412) [email protected]
For more information: www.pgh2o.com/lawnandophelia