1 GREEN AUTOMATION – 2007 Aug 2-3, 2007 LATEST TRENDS IN INDUCTION MELTING AND AUTOMATIC POURING SYSTEMS GREEN AUTOMATION – 2007 Aug 2-3, 2007 LATEST TRENDS IN INDUCTION MELTING AND AUTOMATIC POURING SYSTEMS

Upload: shivaji

Post on 04-Sep-2015

14 views

Category:

Documents


1 download

DESCRIPTION

Know about automatic pouring system

TRANSCRIPT

  • 1GREEN AUTOMATION 2007

    Aug 2-3, 2007

    LATEST TRENDS IN INDUCTION MELTING AND AUTOMATIC

    POURING SYSTEMS

    GREEN AUTOMATION 2007

    Aug 2-3, 2007

    LATEST TRENDS IN INDUCTION MELTING AND AUTOMATIC

    POURING SYSTEMS

  • 2

  • 3MELTING & POURING SYSTEMSMELTING & POURING SYSTEMS

  • 4HEATING & HARDENING SYSTEMSHEATING & HARDENING SYSTEMS

  • 5TUBE & PIPE WELDING SYSTEMSTUBE & PIPE WELDING SYSTEMS

  • 61. Fastest Melt Rates.

    2. Lower energy consumption.

    3. Lower kVA requirement.

    4. Higher power factor & Lower Harmonic distortion.

    5. Safety.

    Basic Requirements from an Induction Furnace -Productivity , Operating Cost , Safety

    Basic Requirements from an Induction Furnace -Productivity , Operating Cost , Safety

  • 7BASIC PRINCIPLE

    CURRENT FLOW HEATS THE METAL CHARGE

    BASIC PRINCIPLE

    CURRENT FLOW HEATS THE METAL CHARGE

  • 8A CONSTANT DC VOLTAGE IS

    APPLIED TO THE INVERTER

    THREE PHASES OF AC ARE CONVERTED TO

    SINGLE PHASE DC. DC ENERGY STORED IN

    CAPACITORS

    THE FURNACE COIL AND CAPACITOR BANK ARE CONNECTED IN SERIES

    VOLTAGE-FED INVERTER TECHNOLOGY APPLIED BY INDUCTOTHERM

    VOLTAGE-FED INVERTER TECHNOLOGY APPLIED BY INDUCTOTHERM

  • 9The VIP Power-Trak Systems track the power regardless of changing furnace conditions. Full power from start to finish for fastest melting.

    POWER-TRAKING ACHIEVES

    FASTEST MELT RATES

    POWER-TRAKING ACHIEVES

    FASTEST MELT RATES

  • 10

    A full melting cycle consist of the time for-

    1. Initial Charging2. Melting3. Deslagging4. Chemistry Analysis and Adjustment5. Pouring

    Utilization Factor = Melting timeCycle time

    DUAL-TRAKDUAL-TRAK

  • 11

    DUAL-TRAKDUAL-TRAK

  • 12

    DUAL-TRAKDUAL-TRAK

  • 13

    Power utilization of almost 100%.

    Batch production capability of two power supplies in a

    single unit.

    25 to 30% more metal output for a given kVA.

    Uninterrupted metal flow.

    Availability of liquid metal from both furnaces if

    required.

    Power sharing between two furnace in any ratio.

    ADVANTAGES OF A DUAL TRAKADVANTAGES OF A DUAL TRAK

  • 14

    Steel Shells hoop strength gives the furnace superior strength.

    Rugged construction minimizes distortion during tilting and pouring.

    Low noise level because of sound deadening characteristics of solid steel shell.

    STEEL SHELL FURNACES -STRUCTURAL STRENGTH

    STEEL SHELL FURNACES -STRUCTURAL STRENGTH

  • 15

    Thick walled coils reduce coil losses and put more energy into the metal.

    Open Coil spacing enhances coil efficiency.

    Appropriately contoured & larger coverage of magnetic shunts for re-directing electro-magnetic field into the metal and to reduce excessive shell heat-up.

    Insulated furnace lids minimize radiation losses.

    Cooling coils extend lining life.

    STEEL SHELL FURNACES HIGHLY EFFICIENT

    STEEL SHELL FURNACES HIGHLY EFFICIENT

  • 16

    Shell Protects the coil in the event of metal splash. Serves as barrier between the splashed metal and the coil.

    Higher freeboard protects workers from excessive heat when the lid is off.

    Open bottom provides superior ventilation reducing moisture build-up and damage in the event of metal run-out.

    Fume rings/Fume hoods are provided to remove smoke and fumes to protect workers from air pollution.

    STEEL SHELL FURNACES SAFE TO OPERATE

    STEEL SHELL FURNACES SAFE TO OPERATE

  • 17

    GLD Probe

    Wire ToGround Pusher Block

    Bottom Of Furnace Shell

    Probes Must Be in Contact With Metal

    Bottom of Metal Bath

    The Ground Leak Detector system includes both GLD module associated with Power Supply and GLD probe located in the furnace. The system indicates and shuts off the power when metal penetrates the furnace lining into the coil or when excessive moisture is present in the furnace or when low ground resistance exists in the electric system.

    SUPERIOR GROUND LEAKAGE DETECTOR SYSTEM

    SUPERIOR GROUND LEAKAGE DETECTOR SYSTEM

  • 18

    Hydraulically powered push-out mechanism distributes pressure uniformly up the side walls of the refractory. The complete lining can be removed almost entirely in one piece .

    Rammed Lining

    Coil

    Pusher BlockExtended

    Furnace

    Pusher Block

    Removable Push-OutMechanism

    SUPERIOR LINING PUSH-OUT TECHNOLOGY

    SUPERIOR LINING PUSH-OUT TECHNOLOGY

  • 19

    STEEL SHELL FURNACES -FUME HOOD

    STEEL SHELL FURNACES -FUME HOOD

  • 20

    STEEL SHELL FURNACES - BACK TILT

    SLAGGING

    STEEL SHELL FURNACES - BACK TILT

    SLAGGING

  • 21

    STEEL SHELL FURNACES -LOAD CELLS

    STEEL SHELL FURNACES -LOAD CELLS

  • 22

    1. Displays power, weight, and

    temperature readings.

    2. Displays temperature set

    points (Normal operating

    mode).

    3. Displays kilowatt-hour total

    (kWatt hour operating

    mode).

    4. Displays general furnace

    information.

    MELT MINDER - FURNACE DETAILS SCREENMELT MINDER - FURNACE DETAILS SCREEN

  • 23

    Sets the sinter recipe for furnace Starts and charts the sintering

    process .

    MELT MINDER - SINTER SCREENMELT MINDER - SINTER SCREEN

  • 24

    Displays, charts and prints selectable information for all heats over 24-

    hour period for a specific date

    MELT MINDER - STRIP CHART SCREENMELT MINDER - STRIP CHART SCREEN

  • 25

    AUTOMATIC POURING SYSTEMSAUTOMATIC POURING SYSTEMS

  • 26

    FILLS THE MOULD

    PROVIDES STORAGE

    REDUCES MANPOWER

    REDUCES REJECTS

    AUTOMATIC POURING SYSTEMSAUTOMATIC POURING SYSTEMS

  • 27

    1

    1 Vessel

    3 3 Outlet

    4

    4 Inductor

    5

    5 Pressure supply

    6

    6 Float

    7

    7 Stopper

    2

    2 Inlet

    PRESSURE POURING FURNACEPRESSURE POURING FURNACE

  • 28

    UNHEATED TUNDISH POURING SYSTEMUNHEATED TUNDISH POURING SYSTEM