Activity ID Activity Name Original Duration Start Finish 14234-1 Egbaoma Gas Processing Plant - Resource Loaded 344 05-Aug-14 A 30-Nov-15 14234-1.Contract About Contract 250 05-Aug-14 A 30-Nov-15 A21270 Kick Off Meeting 0 05-Aug-14 A A21280 Commencement of Project Work 0 05-Aug-14 A A21790 HAZOP 8 17-Dec-14 A 24-Dec-14 A A21800 Engineering Completion 0 02-Jun-15 A21810 Procurement Completion 0 08-Jun-15 A21820 Site Modification, Construction & Erection Works Completion 0 14-Oct-15 A21830 Pre-Commissioning & Commissioning Works Completion 0 27-Oct-15 A21840 First Gas In & Successful Test Run 0 27-Oct-15 A21940 Performance Test 3 27-Oct-15 29-Oct-15 A21950 Reliability Test 30 29-Oct-15 30-Nov-15 A21960 Project Closing 0 30-Nov-15 14234-1.Engineering Engineering 216 17-Aug-14 A 02-Jun-15 14234-1.Engineering.1 Process 187 18-Aug-14 A 22-Apr-15 A21350 Process Design Completion 0 20-Apr-15 14234-1.Engineering.1.1 Documents and Reports 187 18-Aug-14 A 22-Apr-15 14234-1.Engineering.1.2 Drawings 174 27-Aug-14 A 10-Apr-15 14234-1.Engineering.2 Mechanical Static 210 21-Aug-14 A 25-May-15 A21360 Mechanical Static Design Completion 0 14-May-15 14234-1.Engineering.2.1 Documents 137 11-Sep-14 A 05-Apr-15 14234-1.Engineering.2.2 Design Calculation Book 143 17-Sep-14 A 14-May-15 14234-1.Engineering.2.3 Drawings 203 21-Aug-14 A 14-May-15 14234-1.Engineering.2.4 Datasheet 149 17-Sep-14 A 25-May-15 14234-1.Engineering.4 Piping 205 11-Sep-14 A 18-May-15 A21380 Piping Design Start 0 05-Apr-15 A21670 Piping Design Completion 0 13-May-15 14234-1.Engineering.4.1 Documents 101 03-Nov-14 A 04-Feb-15 A 14234-1.Engineering.4.2 General Drawings 161 11-Sep-14 A 13-May-15 14234-1.Engineering.4.3 Skid General Arrangement Drawing 205 02-Oct-14 A 18-May-15 14234-1.Engineering.3 Mechanical Rotating 65 06-Jan-15 A 12-Apr-15 A21370 Mechanical Rotating Design Completion 0 12-Apr-15 14234-1.Engineering.3.1 Datasheets 64 06-Jan-15 A 10-Apr-15 14234-1.Engineering.5 Electrical 183 02-Oct-14 A 16-Apr-15 A21390 Electrical System Design Completion 0 16-Apr-15 14234-1.Engineering.5.1 Data Sheets 63 07-Jan-15 A 12-Apr-15 14234-1.Engineering.5.2 Documents 180 02-Oct-14 A 13-Apr-15 14234-1.Engineering.5.3 Drawings 59 26-Jan-15 A 16-Apr-15 14234-1.Engineering.6 Instrumentation 164 17-Aug-14 A 12-May-15 A21400 Instrumentation System Design Completion 0 12-May-15 14234-1.Engineering.6.2 Documents 164 17-Aug-14 A 12-May-15 14234-1.Engineering.6.1 Data Sheets 61 07-Jan-15 A 06-Apr-15 14234-1.Engineering.6.3 Layouts & Drawings 132 02-Oct-14 A 15-Apr-15 14234-1.Engineering.7 Civil & Structure 180 21-Aug-14 A 13-Apr-15 A21410 Civil & Structure Design Completion 0 13-Apr-15 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t 2015 Kick Off Meeting Commencement of Project Work HAZOP Engineering Completion Procurement Completion 02-Jun-15, 14234-1.Engineerin 22-Apr-15, 14234-1.Engineering.1 Proces Process Design Completion 22-Apr-15, 14234-1.Engineering.1.1 Docu 10-Apr-15, 14234-1.Engineering.1.2 Drawing 25-May-15, 14234-1.Engineering Mechanical Static Design Completio 05-Apr-15, 14234-1.Engineering.2.1 Documen 14-May-15, 14234-1.Engineering.2.2 14-May-15, 14234-1.Engineering.2.3 25-May-15, 14234-1.Engineering 18-May-15, 14234-1.Engineering.4 Piping Design Start Piping Design Completion 04-Feb-15 A, 14234-1.Engineering.4.1 Documents 13-May-15, 14234-1.Engineering.4.2 18-May-15, 14234-1.Engineering.4. 12-Apr-15, 14234-1.Engineering.3 Mechanic Mechanical Rotating Design Completion 10-Apr-15, 14234-1.Engineering.3.1 Datashe 16-Apr-15, 14234-1.Engineering.5 Electrica Electrical System Design Completion 12-Apr-15, 14234-1.Engineering.5.1 Data Sh 13-Apr-15, 14234-1.Engineering.5.2 Docum 16-Apr-15, 14234-1.Engineering.5.3 Drawin 12-May-15, 14234-1.Engineering.6 I Instrumentation System Design Com 12-May-15, 14234-1.Engineering.6.2 06-Apr-15, 14234-1.Engineering.6.1 Data She 15-Apr-15, 14234-1.Engineering.6.3 Layout 13-Apr-15, 14234-1.Engineering.7 Civil & Str Civil & Structure Design Completion Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31 Actual Work Remaining Work Critical Remaining Work Milestone Sum... Page 1 of 7 TASK filter: All Activities © Primavera Systems, Inc.

Upload: makrand-kulkarni-pmp-2750

Post on 16-Aug-2015

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1 Egbao14234-1 Egbaoma Gas Processing Plant - Resource Loaded 344 05-Aug-14 A 30-Nov-15

14234-1.Contr14234-1.Contract About Contract 250 05-Aug-14 A 30-Nov-15

A21270 Kick Off Meeting 0 05-Aug-14 AA21280 Commencement of Project Work 0 05-Aug-14 AA21790 HAZOP 8 17-Dec-14 A 24-Dec-14 AA21800 Engineering Completion 0 02-Jun-15A21810 Procurement Completion 0 08-Jun-15A21820 Site Modification, Construction & Erection Works Completion 0 14-Oct-15A21830 Pre-Commissioning & Commissioning Works Completion 0 27-Oct-15A21840 First Gas In & Successful Test Run 0 27-Oct-15A21940 Performance Test 3 27-Oct-15 29-Oct-15A21950 Reliability Test 30 29-Oct-15 30-Nov-15A21960 Project Closing 0 30-Nov-15

14234-1.Engin14234-1.Engineering Engineering 216 17-Aug-14 A 02-Jun-15

14234-1.Engine14234-1.Engineering.1 Process 187 18-Aug-14 A 22-Apr-15A21350 Process Design Completion 0 20-Apr-1514234-1.Engin14234-1.Engineering.1.1 Documents and Reports 187 18-Aug-14 A 22-Apr-1514234-1.Engin14234-1.Engineering.1.2 Drawings 174 27-Aug-14 A 10-Apr-15

14234-1.Engine14234-1.Engineering.2 Mechanical Static 210 21-Aug-14 A 25-May-15A21360 Mechanical Static Design Completion 0 14-May-1514234-1.Engin14234-1.Engineering.2.1 Documents 137 11-Sep-14 A 05-Apr-1514234-1.Engin14234-1.Engineering.2.2 Design Calculation Book 143 17-Sep-14 A 14-May-1514234-1.Engin14234-1.Engineering.2.3 Drawings 203 21-Aug-14 A 14-May-1514234-1.Engin14234-1.Engineering.2.4 Datasheet 149 17-Sep-14 A 25-May-15

14234-1.Engine14234-1.Engineering.4 Piping 205 11-Sep-14 A 18-May-15A21380 Piping Design Start 0 05-Apr-15A21670 Piping Design Completion 0 13-May-1514234-1.Engin14234-1.Engineering.4.1 Documents 101 03-Nov-14 A 04-Feb-15 A14234-1.Engin14234-1.Engineering.4.2 General Drawings 161 11-Sep-14 A 13-May-1514234-1.Engin14234-1.Engineering.4.3 Skid General Arrangement Drawing 205 02-Oct-14 A 18-May-15

14234-1.Engine14234-1.Engineering.3 Mechanical Rotating 65 06-Jan-15 A 12-Apr-15A21370 Mechanical Rotating Design Completion 0 12-Apr-1514234-1.Engin14234-1.Engineering.3.1 Datasheets 64 06-Jan-15 A 10-Apr-15

14234-1.Engine14234-1.Engineering.5 Electrical 183 02-Oct-14 A 16-Apr-15A21390 Electrical System Design Completion 0 16-Apr-1514234-1.Engin14234-1.Engineering.5.1 Data Sheets 63 07-Jan-15 A 12-Apr-1514234-1.Engin14234-1.Engineering.5.2 Documents 180 02-Oct-14 A 13-Apr-1514234-1.Engin14234-1.Engineering.5.3 Drawings 59 26-Jan-15 A 16-Apr-15

14234-1.Engine14234-1.Engineering.6 Instrumentation 164 17-Aug-14 A 12-May-15A21400 Instrumentation System Design Completion 0 12-May-1514234-1.Engin14234-1.Engineering.6.2 Documents 164 17-Aug-14 A 12-May-1514234-1.Engin14234-1.Engineering.6.1 Data Sheets 61 07-Jan-15 A 06-Apr-1514234-1.Engin14234-1.Engineering.6.3 Layouts & Drawings 132 02-Oct-14 A 15-Apr-15

14234-1.Engine14234-1.Engineering.7 Civil & Structure 180 21-Aug-14 A 13-Apr-15A21410 Civil & Structure Design Completion 0 13-Apr-15

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

Kick Off MeetingCommencement of Project Work

HAZOPEngineering Completion

Procurement Completion

02-Jun-15, 14234-1.Engineerin

22-Apr-15, 14234-1.Engineering.1 ProcesProcess Design Completion22-Apr-15, 14234-1.Engineering.1.1 Docu

10-Apr-15, 14234-1.Engineering.1.2 Drawing25-May-15, 14234-1.Engineering

Mechanical Static Design Completio05-Apr-15, 14234-1.Engineering.2.1 Documen

14-May-15, 14234-1.Engineering.2.214-May-15, 14234-1.Engineering.2.3

25-May-15, 14234-1.Engineering18-May-15, 14234-1.Engineering.4

Piping Design StartPiping Design Completion

04-Feb-15 A, 14234-1.Engineering.4.1 Documents13-May-15, 14234-1.Engineering.4.2

18-May-15, 14234-1.Engineering.4.12-Apr-15, 14234-1.Engineering.3 MechanicMechanical Rotating Design Completion10-Apr-15, 14234-1.Engineering.3.1 Datashe

16-Apr-15, 14234-1.Engineering.5 ElectricaElectrical System Design Completion

12-Apr-15, 14234-1.Engineering.5.1 Data Sh13-Apr-15, 14234-1.Engineering.5.2 Docum16-Apr-15, 14234-1.Engineering.5.3 Drawin

12-May-15, 14234-1.Engineering.6 IInstrumentation System Design Com12-May-15, 14234-1.Engineering.6.2

06-Apr-15, 14234-1.Engineering.6.1 Data She15-Apr-15, 14234-1.Engineering.6.3 Layout13-Apr-15, 14234-1.Engineering.7 Civil & StrCivil & Structure Design Completion

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 1 of 7 TASK filter: All Activities

© Primavera Systems, Inc.

Page 2: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1.Engin14234-1.Engineering.7.1 Document 98 03-Nov-14 A 29-Jan-15 A14234-1.Engin14234-1.Engineering.7.2 Drawings 180 21-Aug-14 A 13-Apr-15

14234-1.Engine14234-1.Engineering.8 HSE 158 20-Aug-14 A 03-May-15A21420 HSE Documentation Completion 0 03-May-1514234-1.Engin14234-1.Engineering.8.1 Document 158 20-Aug-14 A 03-May-15

14234-1.Engine14234-1.Engineering.9 QAQC 115 20-Aug-14 A 05-Apr-15A21430 QAQC Documentation Completion 0 05-Apr-1514234-1.Engin14234-1.Engineering.9.1 Document 73 20-Aug-14 A 10-Mar-15 A

14234-1.Engine14234-1.Engineering.10 Commissioning 102 05-Nov-14 A 02-Jun-15A21440 Commissioning Documentation Completion 0 02-Jun-1514234-1.Engin14234-1.Engineering.10.1 Documents 102 05-Nov-14 A 02-Jun-15

14234-1.Engine14234-1.Engineering.11 General 197 15-Sep-14 A 06-May-15A21450 General Documentation Completion 0 05-Apr-1514234-1.Engin14234-1.Engineering.11.1 Documents 197 15-Sep-14 A 06-May-15

14234-1.Proco14234-1.Procourment Procurement 129 19-Oct-14 A 07-Jun-15

A21460 Procurement Completion 0 07-Jun-15

14234-1.Procou14234-1.Procourment.1 Issuance of PO for major buyout Items 112 19-Oct-14 A 14-May-15A21570 PO Placed for all Major Items 0 14-May-1514234-1.Proco14234-1.Procourment.1.1 Chiller E-301 58 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.2 Deethanizer OH Condenser E-401 53 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.3 Condensate Stabilization Column C-3001 9 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.4 Propane Receiver V-706 9 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.5 Condensate Reboiler E-3001 9 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.6 Gas/Gas Exchanger E-300A 9 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.7 Gas/Gas Exchanger E-300B 9 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.8 Gas/Liquid Exchanger E-302A 67 19-Oct-14 A 08-Dec-14 A14234-1.Proco14234-1.Procourment.1.9 Gas/Liquid Exchanger E-302B 67 19-Oct-14 A 08-Dec-14 A14234-1.Proco14234-1.Procourment.1.10 Regeneration Gas Cooler E-303 67 19-Oct-14 A 04-Jan-15 A14234-1.Proco14234-1.Procourment.1.11 Water Degassing Boot V-3401 8 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.12 CPI Separator V-3402 9 19-Oct-14 A 19-Oct-14 A14234-1.Proco14234-1.Procourment.1.13 On Spec Condensate Storage Tank T-3301 8 05-Apr-15 15-Apr-1514234-1.Proco14234-1.Procourment.1.14 Off Spec Condensate Storage Tank T-3302 8 05-Apr-15 15-Apr-1514234-1.Proco14234-1.Procourment.1.15 Bulk Materials 21 08-Dec-14 A 08-Dec-14 A

14234-1.Procou14234-1.Procourment.2 Receipt of Head & Shell Materials at SPEC Facility 120 19-Oct-14 A 07-Jun-15A21560 Fabrication Material Received @ SPEC Fabrication Facility 0 07-Jun-1514234-1.Proco14234-1.Procourment.2.1 Chiller E-301 21 19-Oct-14 A 02-Dec-14 A14234-1.Proco14234-1.Procourment.2.2 Deethanizer OH Condenser E-401 21 19-Oct-14 A 02-Dec-14 A14234-1.Proco14234-1.Procourment.2.3 Condensate Stabilization Column C-3001 21 19-Oct-14 A 02-Dec-14 A14234-1.Proco14234-1.Procourment.2.4 Propane Receiver V-706 21 19-Oct-14 A 02-Dec-14 A14234-1.Proco14234-1.Procourment.2.5 Condensate Reboiler E-3001 21 19-Oct-14 A 02-Nov-14 A14234-1.Proco14234-1.Procourment.2.6 Gas/Gas Exchanger E-300A 50 19-Oct-14 A 02-Dec-14 A14234-1.Proco14234-1.Procourment.2.7 Gas/Gas Exchanger E-300B 50 19-Oct-14 A 02-Dec-14 A14234-1.Proco14234-1.Procourment.2.8 Gas/Liquid Exchanger E-302A 59 19-Oct-14 A 11-May-1514234-1.Proco14234-1.Procourment.2.9 Gas/Liquid Exchanger E-302B 59 19-Oct-14 A 11-May-1514234-1.Proco14234-1.Procourment.2.10 Regeneration Gas Cooler E-303 59 19-Oct-14 A 24-May-15

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

29-Jan-15 A, 14234-1.Engineering.7.1 Document13-Apr-15, 14234-1.Engineering.7.2 Drawin

03-May-15, 14234-1.Engineering.8 HSHSE Documentation Completion03-May-15, 14234-1.Engineering.8.1 D

05-Apr-15, 14234-1.Engineering.9 QAQCQAQC Documentation Completion

10-Mar-15 A, 14234-1.Engineering.9.1 Document02-Jun-15, 14234-1.EngineerinCommissioning Documentation02-Jun-15, 14234-1.Engineerin

06-May-15, 14234-1.Engineering.11 GGeneral Documentation Completion

06-May-15, 14234-1.Engineering.11.1 07-Jun-15, 14234-1.Procourm

Procurement Completion14-May-15, 14234-1.Procourment.1 PO Placed for all Major Items

19-Oct-14 A, 14234-1.Procourment.1.1 Chiller E-30119-Oct-14 A, 14234-1.Procourment.1.2 Deethanizer OH Condenser E-40119-Oct-14 A, 14234-1.Procourment.1.3 Condensate Stabilization Column C-300119-Oct-14 A, 14234-1.Procourment.1.4 Propane Receiver V-70619-Oct-14 A, 14234-1.Procourment.1.5 Condensate Reboiler E-300119-Oct-14 A, 14234-1.Procourment.1.6 Gas/Gas Exchanger E-300A19-Oct-14 A, 14234-1.Procourment.1.7 Gas/Gas Exchanger E-300B

08-Dec-14 A, 14234-1.Procourment.1.8 Gas/Liquid Exchanger E-302A08-Dec-14 A, 14234-1.Procourment.1.9 Gas/Liquid Exchanger E-302B

04-Jan-15 A, 14234-1.Procourment.1.10 Regeneration Gas Cooler E-319-Oct-14 A, 14234-1.Procourment.1.11 Water Degassing Boot V-340119-Oct-14 A, 14234-1.Procourment.1.12 CPI Separator V-3402

15-Apr-15, 14234-1.Procourment.1.13 On S15-Apr-15, 14234-1.Procourment.1.14 Off S

08-Dec-14 A, 14234-1.Procourment.1.15 Bulk Materials07-Jun-15, 14234-1.ProcourmFabrication Material Received

02-Dec-14 A, 14234-1.Procourment.2.1 Chiller E-30102-Dec-14 A, 14234-1.Procourment.2.2 Deethanizer OH Condenser E-40102-Dec-14 A, 14234-1.Procourment.2.3 Condensate Stabilization Column C-3002-Dec-14 A, 14234-1.Procourment.2.4 Propane Receiver V-706

02-Nov-14 A, 14234-1.Procourment.2.5 Condensate Reboiler E-300102-Dec-14 A, 14234-1.Procourment.2.6 Gas/Gas Exchanger E-300A02-Dec-14 A, 14234-1.Procourment.2.7 Gas/Gas Exchanger E-300B

11-May-15, 14234-1.Procourment.2.811-May-15, 14234-1.Procourment.2.9

24-May-15, 14234-1.Procourmen

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 2 of 7 TASK filter: All Activities

© Primavera Systems, Inc.

Page 3: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1.Proco14234-1.Procourment.2.11 Water Degassing Boot V-3401 27 19-Oct-14 A 07-Dec-14 A14234-1.Proco14234-1.Procourment.2.12 CPI Separator V-3402 26 19-Oct-14 A 07-Dec-14 A14234-1.Proco14234-1.Procourment.2.13 On Spec Condensate Storage Tank T-3301 37 15-Apr-15 05-Jun-1514234-1.Proco14234-1.Procourment.2.14 Off Spec Condensate Storage Tank T-3302 37 15-Apr-15 05-Jun-1514234-1.Proco14234-1.Procourment.2.15 Bulk Materials 25 08-Dec-14 A 30-Dec-14 A

14234-1.Procou14234-1.Procourment.3 Successful Vessel Hydro Test 36 05-Apr-15 25-May-15A21550 Hydrotesting of Vessels Completion 0 25-May-1514234-1.Proco14234-1.Procourment.3.1 Chiller E-301 1 15-Apr-15 16-Apr-1514234-1.Proco14234-1.Procourment.3.2 Deethanizer OH Condenser E-401 0 05-Apr-15 05-Apr-1514234-1.Proco14234-1.Procourment.3.3 Condensate Stabilization Column C-3001 0 05-Apr-15 05-Apr-1514234-1.Proco14234-1.Procourment.3.4 Propane Receiver V-706 1 16-Apr-15 19-Apr-1514234-1.Proco14234-1.Procourment.3.5 Condensate Reboiler E-3001 0 05-Apr-15 05-Apr-1514234-1.Proco14234-1.Procourment.3.6 Gas/Gas Exchanger E-300A 0 05-Apr-15 05-Apr-1514234-1.Proco14234-1.Procourment.3.7 Gas/Gas Exchanger E-300B 0 05-Apr-15 05-Apr-1514234-1.Proco14234-1.Procourment.3.8 Gas/Liquid Exchanger E-302A 1 11-May-15 12-May-1514234-1.Proco14234-1.Procourment.3.9 Gas/Liquid Exchanger E-302B 1 11-May-15 12-May-1514234-1.Proco14234-1.Procourment.3.10 Regeneration Gas Cooler E-303 1 25-May-15 25-May-1514234-1.Proco14234-1.Procourment.3.11 Water Degassing Boot V-3401 1 29-Apr-15 30-Apr-1514234-1.Proco14234-1.Procourment.3.12 CPI Separator V-3402 1 14-May-15 14-May-15

14234-1.Procou14234-1.Procourment.4 Equipment FAT at SPEC Facility 37 06-Apr-15 26-May-15A21540 Equipment FAT Completion 0 26-May-1514234-1.Proco14234-1.Procourment.4.1 Gas/Gas Exchanger (E-300A/B) Skid 1 06-Apr-15 06-Apr-1514234-1.Proco14234-1.Procourment.4.2 Gas Liquid Exchanger (E-302A/B) Skid 1 12-May-15 13-May-1514234-1.Proco14234-1.Procourment.4.3 Regeneration Gas Cooler (E-303) Skid 1 26-May-15 26-May-1514234-1.Proco14234-1.Procourment.4.4 Gas Metering Package 0 17-May-15 17-May-1514234-1.Proco14234-1.Procourment.4.5 Condensate Stabilization Package 0 17-May-15 17-May-1514234-1.Proco14234-1.Procourment.4.6 Condensate Loading Pump Package 0 17-May-15 17-May-1514234-1.Proco14234-1.Procourment.4.7 Water Degassing Boot & CPI Separator Package 0 17-May-15 17-May-1514234-1.Proco14234-1.Procourment.4.8 ESD/FGS Panel 1 17-May-15 18-May-15

14234-1.Procou14234-1.Procourment.5 Shipping Readiness of Materials from SPEC Facility 5 13-May-15 19-May-15A21530 Shipping Readiness of Materials @ SPEC Facility 0 19-May-1514234-1.Proco14234-1.Procourment.5.1 Gas/Gas & Gas/Liquid Exchangers Package 3 13-May-15 18-May-1514234-1.Proco14234-1.Procourment.5.2 Gas Metering Package 1 18-May-15 18-May-1514234-1.Proco14234-1.Procourment.5.3 Condensate Stabilization Package 1 18-May-15 18-May-1514234-1.Proco14234-1.Procourment.5.4 Condensate Loading Pump Package 1 18-May-15 18-May-1514234-1.Proco14234-1.Procourment.5.5 Water Degassing Boot & CPI Separator Package 1 18-May-15 18-May-1514234-1.Proco14234-1.Procourment.5.6 ESD/FGS Panel 1 19-May-15 19-May-15

14234-1.Projec14234-1.Project Constraints Project Constraints 144 05-Apr-15 A 10-Oct-15

A23580 Payment Receiving against Invoice # 4 & 5 0 05-Apr-15 AA23600 Procurement of Shutdown Valves, Pumps, PSV, & Flow Transmitters 14 06-Apr-15 20-Apr-15A23610 Ex. Works Readiness of SDVs, Pumps, PSVs, & Flow Transmitters 98 20-Apr-15 30-Jul-15A23620 Air Shipment Direct to Site 21 30-Jul-15 21-Aug-15A23650 Custome Clearance in Nigeria & Logistics Time to Site 28 21-Aug-15 19-Sep-15A23660 Installation of SDVs, Pumps, PSVs, & Flow Transmitters on Respective Sk 14 19-Sep-15 03-Oct-15A23670 Pre-Commissioning & Commissioning of Skid Package 7 03-Oct-15 10-Oct-15

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

07-Dec-14 A, 14234-1.Procourment.2.11 Water Degassing Boot V-340107-Dec-14 A, 14234-1.Procourment.2.12 CPI Separator V-3402

05-Jun-15, 14234-1.Procourm05-Jun-15, 14234-1.Procourm

30-Dec-14 A, 14234-1.Procourment.2.15 Bulk Materials25-May-15, 14234-1.ProcourmenHydrotesting of Vessels Completi

16-Apr-15, 14234-1.Procourment.3.1 Chille05-Apr-15, 14234-1.Procourment.3.2 Deethan05-Apr-15, 14234-1.Procourment.3.3 Conden

19-Apr-15, 14234-1.Procourment.3.4 Prop05-Apr-15, 14234-1.Procourment.3.5 Conden05-Apr-15, 14234-1.Procourment.3.6 Gas/Ga05-Apr-15, 14234-1.Procourment.3.7 Gas/Ga

12-May-15, 14234-1.Procourment.3.12-May-15, 14234-1.Procourment.3.

25-May-15, 14234-1.Procourmen30-Apr-15, 14234-1.Procourment.3.11 W

14-May-15, 14234-1.Procourment.326-May-15, 14234-1.ProcourmenEquipment FAT Completion

06-Apr-15, 14234-1.Procourment.4.1 Gas/Ga13-May-15, 14234-1.Procourment.4.

26-May-15, 14234-1.Procourmen17-May-15, 14234-1.Procourment.417-May-15, 14234-1.Procourment.417-May-15, 14234-1.Procourment.417-May-15, 14234-1.Procourment.418-May-15, 14234-1.Procourment.419-May-15, 14234-1.Procourment.Shipping Readiness of Materials @18-May-15, 14234-1.Procourment.518-May-15, 14234-1.Procourment.518-May-15, 14234-1.Procourment.518-May-15, 14234-1.Procourment.518-May-15, 14234-1.Procourment.519-May-15, 14234-1.Procourment.

Payment Receiving against Invoice # 4 & 5Procurement of Shutdown Valves, Pumps,

Ex. Works ReadAir Shipme

Cu

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 3 of 7 TASK filter: All Activities

© Primavera Systems, Inc.

Page 4: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1.Const14234-1.Construction Site Modification, Construction & Erection W 137 06-Apr-15 14-Oct-15

A21860 Receiving of Instruments on Site 56 14-May-15 11-Jul-15A21870 Receiving of Piping Bulk Material at Site 56 14-May-15 11-Jul-15A21880 Site Modification, Construction & Erection Completion 0 14-Oct-15

14234-1.Constr14234-1.Construction.1 Site Modification Works 137 06-Apr-15 14-Oct-15A21520 Site Modification Works Completion 0 14-Oct-1514234-1.Const14234-1.Construction.1.1 Three Phase Separator Package 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.14 Heat Medium Expansion Tank/Pumps Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.19 LPG Bullets Control Station Skid 137 06-Apr-15 14-Oct-1514234-1.Const14234-1.Construction.1.26 LPG Loading Arm Skid 62 11-Jul-15 07-Oct-1514234-1.Const14234-1.Construction.1.27 Distributed Control System (DCS) 85 06-Apr-15 03-Aug-1514234-1.Const14234-1.Construction.1.28 Power Generators 79 06-Apr-15 24-Jul-1514234-1.Const14234-1.Construction.1.29 LV Switchgear & MCC 11 11-Jul-15 28-Jul-1514234-1.Const14234-1.Construction.1.23 Heat Medium Heater Skid 12Mmbtu 62 11-Jul-15 07-Oct-1514234-1.Const14234-1.Construction.1.24 Flare KO Drum Skid 62 11-Jul-15 07-Oct-1514234-1.Const14234-1.Construction.1.25 Propane Loading Arm Skid 62 11-Jul-15 07-Oct-1514234-1.Const14234-1.Construction.1.15 Fuel Gas Conditioning Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.16 Instrument Air Package 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.17 Depropanizer Reboiler Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.18 Debutanizer Reboiler Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.30 Synchronization Panel 11 11-Jul-15 28-Jul-1514234-1.Const14234-1.Construction.1.13 Deethanizer Reboiler Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.2 Booster Compressor Package 135 06-Apr-15 10-Oct-1514234-1.Const14234-1.Construction.1.3 Inlet Compressor Package - A 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.4 Inlet Compressor Package - B 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.5 Inlet Compressor Package - C 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.7 Regeneration Heater Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.8 Deethanizer Reflux Accumulator Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.9 Depropanizer Reflux Accumulator Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.10 Debutanizer Reflux Accumulator Skid 137 06-Apr-15 14-Oct-1514234-1.Const14234-1.Construction.1.11 Condensate Flash Tank Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.12 Cold & LP Separator Skid 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.20 Propane Bullets Control Staion Skid 137 06-Apr-15 14-Oct-1514234-1.Const14234-1.Construction.1.21 LPG Loading Pumps Skid 67 11-Jul-15 14-Oct-1514234-1.Const14234-1.Construction.1.22 Heat Medium Heater Skid 6Mmbtu 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.6 Molecular Sieve Filters Package 132 06-Apr-15 07-Oct-1514234-1.Const14234-1.Construction.1.31 UPS System 11 11-Jul-15 28-Jul-15

14234-1.Constr14234-1.Construction.2 Site Construction & Erection Works 122 06-Apr-15 22-Sep-15A21510 Site Construction & Erection Works Completion 0 22-Sep-1514234-1.Const14234-1.Construction.2.1 Foundation for Gas Metering Package 41 14-May-15 11-Jul-1514234-1.Const14234-1.Construction.2.2 Foundation for Water Degassing Boot & CPI Separator Sk 42 06-Apr-15 03-Jun-1514234-1.Const14234-1.Construction.2.3 Foundation for Condensate Storage Tank T-3301 & T-3302 42 06-Apr-15 02-Jun-1514234-1.Const14234-1.Construction.2.4 Foundation for Condensate Stabilization Skid 42 06-Apr-15 03-Jun-1514234-1.Const14234-1.Construction.2.5 Foundation for Condensate Transfer Pump Skid 42 13-Apr-15 10-Jun-1514234-1.Const14234-1.Construction.2.6 Foundation for Gas/Gas Exchanger (E-300A/B) Skid 41 14-May-15 11-Jul-15

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

Receiving of InstrumReceiving of Piping B

03-Aug-15, 14224-Jul-15, 14234-28-Jul-15, 14234

28-Jul-15, 14234

28-Jul-15, 142342S

11-Jul-15, 14234-1.C03-Jun-15, 14234-1.Constructi02-Jun-15, 14234-1.Constructi03-Jun-15, 14234-1.Constructi

10-Jun-15, 14234-1.Construc11-Jul-15, 14234-1.C

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 4 of 7 TASK filter: All Activities

© Primavera Systems, Inc.

Page 5: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1.Const14234-1.Construction.2.7 Foundation for Gas Liquid Exchanger (E-302(A/B Skid 42 06-Apr-15 03-Jun-1514234-1.Const14234-1.Construction.2.8 Foundation for Regeneration Gas Cooler (E-303) Skid 41 14-May-15 11-Jul-1514234-1.Const14234-1.Construction.2.9 Foundation for Lighting Poles 42 06-Apr-15 03-Jun-1514234-1.Const14234-1.Construction.2.26 Erection of Gas Metering Skid 4 17-Aug-15 22-Aug-1514234-1.Const14234-1.Construction.2.10 Erection of Condensate Storage Tank T-3301 & T-3302 52 02-Jun-15 13-Aug-1514234-1.Const14234-1.Construction.2.11 Erection of Water Degassing Boot & CPI Separator Skid 5 09-Jul-15 17-Jul-1514234-1.Const14234-1.Construction.2.12 Erection of Condensate Stabilization Skid 11 09-Jul-15 24-Jul-1514234-1.Const14234-1.Construction.2.13 Erection of Condensate Transfer Pump Skid 5 16-Jul-15 24-Jul-1514234-1.Const14234-1.Construction.2.14 Erection of Gas/Gas Exchanger (E-300A/B) Skid 5 17-Aug-15 25-Aug-1514234-1.Const14234-1.Construction.2.15 Erection of Gas Liquid Exchanger (E-302(A/B Skid 5 09-Jul-15 17-Jul-1514234-1.Const14234-1.Construction.2.16 Erection of Regeneration Gas Cooler (E-303) Skid 5 17-Aug-15 25-Aug-1514234-1.Const14234-1.Construction.2.17 Erection of Lighting Poles 5 09-Jul-15 17-Jul-1514234-1.Const14234-1.Construction.2.18 Cable Pulling - Instrument Cables 16 10-Aug-15 01-Sep-1514234-1.Const14234-1.Construction.2.19 Cable Pulling - Electrical Cables 16 10-Aug-15 01-Sep-1514234-1.Const14234-1.Construction.2.20 Electrical Cables Termination in MCC 10 02-Sep-15 16-Sep-1514234-1.Const14234-1.Construction.2.21 Erection of ESD/FGS Panel 5 29-Jun-15 06-Jul-1514234-1.Const14234-1.Construction.2.22 Instruments Cable Termination in DCS Panel 11 17-Aug-15 01-Sep-1514234-1.Const14234-1.Construction.2.23 Instruments Cable Termination in ESD/FGS Panel 11 07-Jul-15 22-Jul-1514234-1.Const14234-1.Construction.2.24 Interconnecting Cables - DCS to ESD/FGS Panel 10 01-Sep-15 15-Sep-1514234-1.Const14234-1.Construction.2.25 Interconnecting Piping Works 107 27-Apr-15 22-Sep-15

14234-1.Comm14234-1.Commissioning Precommissioning & Commissioning Wo 72 17-Jul-15 27-Oct-15

A21480 Precommissioning & Commissioning Completion 0 27-Oct-15

14234-1.Comm14234-1.Commissioning.1 Pre-Commissioning Works 69 17-Jul-15 21-Oct-15A21500 Pre-Commissioning Completion 0 21-Oct-1514234-1.Comm14234-1.Commissioning.1.1 Three Phase Separator Package 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.2 Booster Compressor Package 5 10-Oct-15 17-Oct-1514234-1.Comm14234-1.Commissioning.1.3 Inlet Compressor Package - A 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.4 Inlet Compressor Package - B 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.5 Inlet Compressor Package - C 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.6 Molecular Sieve Filters Package 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.7 Regeneration Heater Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.8 Deethanizer Reflux Accumulator Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.9 Depropanizer Reflux Accumulator Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.10 Debutanizer Reflux Accumulator Skid 5 14-Oct-15 21-Oct-1514234-1.Comm14234-1.Commissioning.1.11 Condensate Flash Tank Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.12 Cold & LP Separator Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.13 Deethanizer Reboiler Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.14 Heat Medium Expansion Tank/Pumps Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.15 Fuel Gas Conditioning Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.16 Instrument Air Package 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.17 Depropanizer Reboiler Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.18 Debutanizer Reboiler Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.19 LPG Bullets Control Station Skid 5 14-Oct-15 21-Oct-1514234-1.Comm14234-1.Commissioning.1.20 Propane Bullets Control Staion Skid 5 14-Oct-15 21-Oct-1514234-1.Comm14234-1.Commissioning.1.21 LPG Loading Pumps Skid 5 14-Oct-15 21-Oct-15

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

03-Jun-15, 14234-1.Constructi11-Jul-15, 14234-1.C

03-Jun-15, 14234-1.Constructi22-Aug-15

13-Aug-15, 17-Jul-15, 14234-1

24-Jul-15, 14234-24-Jul-15, 14234-

25-Aug-117-Jul-15, 14234-1

25-Aug-117-Jul-15, 14234-1

01-Sep01-Sep

16-06-Jul-15, 14234-1.Co

01-Sep22-Jul-15, 14234-

15-2

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 5 of 7 TASK filter: All Activities

© Primavera Systems, Inc.

Page 6: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1.Comm14234-1.Commissioning.1.22 Heat Medium Heater Skid 6Mmbtu 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.23 Heat Medium Heater Skid 12Mmbtu 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.24 Flare KO Drum Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.25 Propane Loading Arm Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.26 LPG Loading Arm Skid 5 07-Oct-15 14-Oct-1514234-1.Comm14234-1.Commissioning.1.27 Gas Metering Skid 5 22-Aug-15 29-Aug-1514234-1.Comm14234-1.Commissioning.1.28 Water Degassing Boot & CPI Separator Skid 5 17-Jul-15 24-Jul-1514234-1.Comm14234-1.Commissioning.1.29 Condensate Stabilization Skid 5 24-Jul-15 31-Jul-1514234-1.Comm14234-1.Commissioning.1.30 Condensate Transfer Pump Skid 5 24-Jul-15 31-Jul-1514234-1.Comm14234-1.Commissioning.1.31 Gas/Gas Exchanger (E-300A/B) Skid 5 25-Aug-15 01-Sep-1514234-1.Comm14234-1.Commissioning.1.32 Gas Liquid Exchanger (E-302(A/B Skid 5 17-Jul-15 24-Jul-1514234-1.Comm14234-1.Commissioning.1.33 Regeneration Gas Cooler (E-303) Skid 5 25-Aug-15 01-Sep-1514234-1.Comm14234-1.Commissioning.1.34 F&G System 5 22-Jul-15 29-Jul-1514234-1.Comm14234-1.Commissioning.1.35 ESD/FGS System 5 22-Jul-15 29-Jul-1514234-1.Comm14234-1.Commissioning.1.36 Distributed Control System (DCS) 5 03-Aug-15 10-Aug-1514234-1.Comm14234-1.Commissioning.1.37 Synchronization Panel 5 28-Jul-15 04-Aug-1514234-1.Comm14234-1.Commissioning.1.38 LV Switchgear & MCC 5 28-Jul-15 04-Aug-1514234-1.Comm14234-1.Commissioning.1.39 UPS System 5 28-Jul-15 04-Aug-1514234-1.Comm14234-1.Commissioning.1.40 Power Generators 5 24-Jul-15 31-Jul-15

14234-1.Comm14234-1.Commissioning.2 Commissioning Works 4 21-Oct-15 27-Oct-15A21490 Commissioning Completion 0 27-Oct-1514234-1.Comm14234-1.Commissioning.2.1 Three Phase Separator Package 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.2 Booster Compressor Package 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.3 Inlet Compressor Package - A 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.4 Inlet Compressor Package - B 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.5 Inlet Compressor Package - C 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.6 Molecular Sieve Filters Package 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.7 Regeneration Heater Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.8 Deethanizer Reflux Accumulator Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.9 Depropanizer Reflux Accumulator Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.10 Debutanizer Reflux Accumulator Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.11 Condensate Flash Tank Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.12 Cold & LP Separator Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.13 Deethanizer Reboiler Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.14 Heat Medium Expansion Tank/Pumps Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.15 Fuel Gas Conditioning Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.16 Instrument Air Package 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.17 Depropanizer Reboiler Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.18 Debutanizer Reboiler Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.19 LPG Bullets Control Station Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.20 Propane Bullets Control Staion Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.21 LPG Loading Pumps Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.22 Heat Medium Heater Skid 6Mmbtu 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.23 Heat Medium Heater Skid 12Mmbtu 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.24 Flare KO Drum Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.25 Propane Loading Arm Skid 4 21-Oct-15 27-Oct-15

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

29-Aug-24-Jul-15, 14234-

31-Jul-15, 142331-Jul-15, 1423

01-Sep24-Jul-15, 14234-

01-Sep29-Jul-15, 142329-Jul-15, 1423

10-Aug-15, 104-Aug-15, 1404-Aug-15, 1404-Aug-15, 14

31-Jul-15, 1423

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 6 of 7 TASK filter: All Activities

© Primavera Systems, Inc.

Page 7: latest level 4 schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-1.Comm14234-1.Commissioning.2.26 LPG Loading Arm Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.27 Gas Metering Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.28 Water Degassing Boot & CPI Separator Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.29 Condensate Stabilization Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.30 Condensate Transfer Pump Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.31 Gas/Gas Exchanger (E-300A/B) Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.32 Gas Liquid Exchanger (E-302(A/B Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.33 Regeneration Gas Cooler (E-303) Skid 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.34 F&G System 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.35 ESD/FGS System 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.36 Distributed Control System (DCS) 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.37 Synchronization Panel 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.38 LV Switchgear & MCC 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.39 Power Generators 4 21-Oct-15 27-Oct-1514234-1.Comm14234-1.Commissioning.2.40 UPS System 4 21-Oct-15 27-Oct-15

14234-1.Perfor14234-1.Performance Test Performance & Reliability Test 0

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep t2015

Egbaoma Gas Processing Plant - Resource Loaded level IV Schedule 23-Apr-15 12:31

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Sum... Page 7 of 7 TASK filter: All Activities