Latest Developments on the E mbedded A ssembly Sy stem Power Supply for LHC Experiments. Giovanni GRIECO CAEN SpA [email protected] 9th Topical Seminar on Innovative Particle and Radiation Detectors 23 - 26 May 2004 Siena, Italy. Summary. Background / previous CAEN HV/LV activities - PowerPoint PPT PresentationTRANSCRIPT
Latest Developments on the Embedded Assembly System
Power Supply for LHC Experiments
Latest Developments on the Embedded Assembly System
Power Supply for LHC Experiments
Giovanni GRIECO
CAEN [email protected]
9th Topical Seminar on Innovative Particle and Radiation Detectors23 - 26 May 2004 Siena, Italy
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
2
SummarySummary
• Background / previous CAEN HV/LV activities
• Birth of the EASY System• EASY specifications• EASY modules• EASY integration in DCS
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
3
BackgroundBackground
• CAEN’s Power Supplies R&D activities in the last 8 years:– SY1527/2527 family– OPC Server for the SY1527/2527 – SASY2000 for Radiation Tolerant and Magnetic Field
solutions tested working devices up to: • 7 kGauss• 1*1011 p/cm2 TD - 15 kRad TID• 2*1012 n/cm2 TD
• Result: – existence of a series of building blocks for a new
power supply concept
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
4
Hostile Area Experience Milestones
Hostile Area Experience Milestones
Feb ‘97
First COTS rad-tolerance tests (ENEA - La Casaccia)
Tests with p and n in Louvain-la-Neuve of A877( CMS Muon Chambers)
May ‘99
New design (Patented) for a family of High and Low voltage DC/DC converters
Nov 01 Today
EASY 3000/4000
Start of Special material research
Apr 00
First SASY 2000 functional prototype
May 02
SASY 2000 tested under Radiation in LLN
Aug 02
SASY 2000 tested in Magnetic field in
CERN
Sept 02
SASY 2002 (CMS Tracker PS Proto)
tested under Radiation in LLN
May 03
SASY 2002 (CMS Tracker PS Proto)
tested in Magnetic field in CERN
Jul 03
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
5
Why the EASY ?Why the EASY ?
• The LHC experiments need common solutions:– Reduce R&D costs (Hardware & Software)– Reduce Hardware/Software proliferation:
• Use of the same crates for all Sub-detectors• Use of the same modules where possible• Use of a Common Control System
– Reduce Maintenance costs:• Use of Common spare units
• CAEN proposes a “catalog” approach with a limited set of modules
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
6
Syste
m P
hilosop
hy
Syste
m P
hilosop
hy
CO
NT
RO
LL
OG
IC
V+
V-
S+S-
V+
V-
S+S-
V+
V-
S+S-
DC-DC
DC-DC
DC-DC
CO
NT
RO
LL
OG
IC
V+
V-
S+S-
V+
V-
S+S-
V+
V-
S+
S-
DC-DC
DC-DC
DC-DC
HOSTILE AREAS
Y1
52
7 S
YS
TE
M M
AIN
FR
AM
E
CONTROL ROOM
SY1527
EASY Module
EASY Module
48VPOWERSOURCE
48VSERVICEPOWERSOURCE
BR
AN
CH
CO
NT
RO
LL
ER
- A
16
76
INTERRUPTPOWER FAILURE
Control Bus
Po
wer
Lin
e
P.
Ser
vice
Lin
e
48VBACKUPBATTERY
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
7
EASY3000/EASY4000EASY3000/EASY4000S
tan
dalo
ne
Sta
nd
alo
ne EASY
3000
19" (21 slots)
6 U EASYEASY
30003000
Rack
Rack M
ou
nt
Mou
nt
EASY4000
EASY3000
EASY4000
EASY3000
EASY4000
EASY4000
Radiation & Magnetic Field
OptionalWhen
NO magnetic field is present
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
8
EASY Main FeaturesEASY Main Features
• Full integration in SY1527/SY2527 (it appears as a single SY1527 board)
• 48V DC input• 21 slots per crate• 3 kW Maximum Output Power• Magnetic field capability: 2 kGauss• Expected rad.tol.: 1*1011 p/cm2 TD
2*1012 n/cm2 TD15 kRad TID
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
9
EA
SY
Mod
ule
sEA
SY
Mod
ule
sModel Ch. per
moduleMax
Output Voltage per Ch.
Max Output Current per Ch.
Max Output Power per ch.
Width (slots)
Modules per
Crate
MAX Channels per Crate
Hostile Area
A3009 12 2-8V 9A 45 W 4 5 60 YesA3016 6 2-8V 16A 90 W 4 5 30 YesA3025 4 2-8V 25A 150 W 4 5 20 YesA3050 2 2-8V 50A 300 W 4 5 10 YesA3100 1 2-8V 100A 600 W 4 5 5 YesA3507 12 700V 15mA 11 W 2 10 120 YesA3540 12 4kV 1mA 4 W 2 10 120 YesA3512 6 12kV 1mA 12 W 3 7 42 Yes
A4601H 2 complex 2 10 20 complex Yes8.5V 15A Yes7.3V 8A Yes600V 20mA Yes
A4601F 2 complex 2 10 20 complex No8.5V 15A No7.3V 8A No600V 20mA No
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
10
A3009 - A3016A3009 - A3016• Reversible polarity• VMon and VSet accuracy
+/- (30mV + 3% Vout)• IMon and ISet accuracy
+/- (50mA + 3% Iout)• Ripple < 20mVpp (10Hz-15MHz)• VMax & IMax by trimmer per ch.• Channel alarms:
– Load and Connector Over-Voltage, – Over-Current, Over-Temperature, Over-Power
• On/off per Ch.• LDR trimmer on the board panel• Board enable (interlock)• 48V Service local & remote on/off • DB50 connectors
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
CH5
CH4
CH3
CH2
CH1
CH0
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
EARTH
C.A.E.N.Mod. A3016
6 CH8V/15A/90W
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
ImaxOn
VmaxLDR
CH11
CH10
CH9
CH8
CH7
CH6
CH5
CH4
CH3
CH2
CH1
CH0
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
EARTH
C.A.E.N.Mod. A3009
12 CH8V/5A/25W
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
11
A3025 – A3050 – A3100A3025 – A3050 – A3100• Reversible polarity• VMon and VSet accuracy
+/- (30mV + 3% Vout)• IMon and ISet accuracy
+/- (50mA + 3% Iout)• Ripple < 20mVpp (10Hz-15MHz)• VMax & IMax by trimmer per ch.• Channel alarms:
– Load and Connector Over-Voltage, – Over-Current, Over-Temperature, Over-
Power• On/off per Ch.• LDR trimmer on the board panel• Board enable (interlock)• 48V Service local & remote on/off • Hex head bolt connector (A3050, A3100)
C.A.E.N.Mod. A3025
4 CH8V/25A/150W
On
Imax
LDR
V+
V-
CH0
Vout+
Vout-Sense+
Sense-
Vmax
On
Imax
LDR
V+
V-
CH1
Vout+
Vout-Sense+
Sense-
Vmax
On
Imax
LDR
V+
V-
CH2
Vout+
Vout-Sense+
Sense-
Vmax
On
Imax
LDR
V+
V-
CH3
Vout+
Vout-Sense+
Sense-
Vmax
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
EARTH FAGND
C.A.E.N.Mod. A3050
2 CH8V/50A/300W
On
Vmax
Imax
LDR
Vout+
Vout-
Vout+
Vout-Sense+
Sense-
CH0
Vout+
Vout-Sense+
Sense-
On
Vmax
Imax
LDR
Vout+Vout-
CH1
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
EARTH FAGND
C.A.E.N.Mod. A3100
1 CH8V/100A/
600W
On
Vmax
Imax
LDR
Vout+
Vout-
Vout+
Vout-Sense+
Sense-
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
EARTH FAGND
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
12
A3507 - A3540 – A3512A3507 - A3540 – A3512• Polararized Floating Channels• VMon and VSet accuracy
(A3540 & A3512) +/- (2V + 0.1% Iout)(A3506) +/- (1V + 0.1% Iout)
• IMon and ISet accuracy(A3540 & A3512) +/- (2uA + 1% Iout)
(A3507) +/- (5uA + 1% Iout)
• Ripple (A3540 & A3507) < 20 mV (10Hz-15MHz)
(A3512) < 100 mV (10Hz-15MHz)
• VMax & IMax by trimmer per board• Channel alarms: Over-Voltage,
Over-Current, Over-Temperature• On/off per Ch. & Board enable
(interlock)• 48V Service local & remote on/off • SHV or CPE(A3512) HV connectors
C.A.E.N.Mod. A3540
12 CH4KV/1mA
On
CH0
On
CH1
On
CH2
On
CH3
On
CH4
On
CH5
On
CH6
On
CH7
On
CH8
On
CH9
On
CH10
On
CH11
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
Imax Vmax
EARTH FAGND
C.A.E.N.Mod. A3512
6 CH12KV/1mA
On
CH0
On
CH1
On
CH2
On
CH3
On
CH4
On
CH5
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
Imax Vmax
EARTH FAGND
C.A.E.N.Mod. A3506
12 CH600V/20mA
On
CH0
On
CH1
On
CH2
On
CH3
On
CH4
On
CH5
On
CH6
On
CH7
On
CH8
On
CH9
On
CH10
On
CH11
Comm SlotOKPowerGood
Interlock
48Vs On/Off
Loc Rem
on
off
Imax
EARTH FAGND
Vmax
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
13
First EASY module: A4601H/FFirst EASY module: A4601H/F
• Developed for CMS Tracker• Can be used in hostile area
or in counting room• Currently under test in CAEN
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
14
• Full integration with the software developed for SY1527/SY2527:– OPC Server– Wrapper libraries (Linux/Win32)
• Full integration with the software developed for SY1527/SY2527:– OPC Server– Wrapper libraries (Linux/Win32)
EASY IntegrationEASY Integration
• Controlled by SY1527/SY2527 power supplies
• Controlled by SY1527/SY2527 power supplies
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
15
CAEN OPC Server MilestonesCAEN OPC Server Milestones
Mar 99
CAEN delivers the 1° SY1527 to CERN
Oct 99
CAEN and IT/CO start the collaboration
May 00
Presentation of the CAEN OPC Server project to the JCOP Meeting
Sep 00
OPC Server rel. 1.0(SY1527 via TCP/IP)
Nov 00
Permanent Test Bench (CAEN PS +
OPC) at IT/CO Labs
Sep 01
Integration of SY1527 into
the JCOP Framework
Jan 02
Presentation of the CAEN OPC Server
rel. 2.0 new features
Today
200 Downloads from CAEN web
site(25% by CERN)
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
16
EASYEASY
EASYEASY
EASYEASY
EASYEASY
EASYEASY
EASYEASY
EASY ArchitectureEASY Architecture
+DCSDCS
• CAN Bus based link• Ad-hoc protocol• Speed and reliability• No interoperability issues• Can work in hostile area
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
17
EASY Channels RepresentationEASY Channels Representation
Channel 00Channel 01Channel 02
Channel 00Channel 01Channel 02
Channel 03Channel 04Channel 05
Channel 03Channel 04Channel 05
Channel 06Channel 07Channel 08
Channel 06Channel 07Channel 08
Channel 09Channel 10Channel 11
Channel 09Channel 10Channel 11
Channel 12Channel 13Channel 14
Channel 12Channel 13Channel 14
Channel 15Channel 16Channel 17
Channel 15Channel 16Channel 17
EA
SY
EA
SY
3000
3000
EA
SY
EA
SY
3000
3000
EA
SY
EA
SY
3000
3000
EA
SY
EA
SY
3000
3000
…Board 01 - Channel 000Board 01 - Channel 001Board 01 - Channel 002Board 01 - Channel 003Board 01 - Channel 004Board 01 - Channel 005 Board 01 - Channel 006Board 01 - Channel 007Board 01 - Channel 008Board 01 - Channel 009Board 01 - Channel 010Board 01 - Channel 011Board 01 - Channel 012Board 01 - Channel 013Board 01 - Channel 014Board 01 - Channel 015Board 01 - Channel 016Board 01 - Channel 017
…
…Board 01 - Channel 000Board 01 - Channel 001Board 01 - Channel 002Board 01 - Channel 003Board 01 - Channel 004Board 01 - Channel 005 Board 01 - Channel 006Board 01 - Channel 007Board 01 - Channel 008Board 01 - Channel 009Board 01 - Channel 010Board 01 - Channel 011Board 01 - Channel 012Board 01 - Channel 013Board 01 - Channel 014Board 01 - Channel 015Board 01 - Channel 016Board 01 - Channel 017
…
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
18
A1676 Branch ControllerA1676 Branch Controller
• Single slot on SY1527/SY2527 systems:
– 16 boards per SY1527
– 6 boards per SY2527
• Up to 6 independent EASYs
• CANBus based bus protocol
• Up to 720 indipendent ch. per branch
• Up to 11.520 indipendent ch. per system
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
19
EASY Module FeaturesEASY Module Features
• Local microcontroller• Firmware remotely upgradable• Hardware Imax• Per low voltage channel:
– Independent ON/OFF– Vmon (Connector and Load)– Imon– Vset (Software or Hardware)– Programmable Trip– Sense wires– Status Signals
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
20
SY1527 / SY2527 (front view)SY1527 / SY2527 (front view)
SY1527 SY2527
• Modular and Expandable
• Flexible: HV, LV & branch controller boards
• Reliable
• Remote Firmware upgrading & Maintenance
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
21
SY1527 / SY2527 (rear view)SY1527 / SY2527 (rear view)
3GND3GND3GND3GND
DB091GND2GND3GND4GND5GND
Branch Controller
Branch Controller
DB
091G
ND
2GN
D3G
ND
DB
09
1GN
D2G
ND
3GN
D
4GN
D5G
ND
SY1527
SY2527
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
22
SY1527/SY2527 ConnectivitySY1527/SY2527 Connectivity
Telnet Client LabView onPC/Mac/Linux
OPC Server
LAN Ethernet
LAN Ethernet
OPC Client OPC Client
Router
Internet
Firewall
Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments
23
ConclusionsConclusions
• CAEN has completed all developments in Magnetic Field and Radiation
• Integration in DCS (OPC Server + SY1527) is well established and already in use
• The architectures of the EASY System and modules are completely defined