laser news awake performance meeting 25.11.2013
DESCRIPTION
Laser news AWAKE performance meeting 25.11.2013. Overview. There was a meeting on 05.11.2013 with the supplier of the laser system (AMPLITUDE) No new information on the laser system yet - PowerPoint PPT PresentationTRANSCRIPT
Laser news
AWAKE performance meeting25.11.2013
Overview• There was a meeting on 05.11.2013 with the supplier
of the laser system (AMPLITUDE)• No new information on the laser system yet• The placement of the optical compressor and the
focusing telescope has to be defined before drilling the connection tunnel
• Availability of vacuum components for the compressor and telescope is under study.
• 10-6 Torr “easily” achievable. Pellicle or differential pumping as an option to go better
• Provocative: is 10-8 Torr overestimated?
Some measurements of laser room with respect to merging point
System To define / To doLaser room, equipped with a big SAS
Air circulation, conditioning, humidity, filters, circuits (electrical, demineralized water, tap water, compressed air, control cables), safety (fire/smoke alarm), shutters, access etc.
Connection tunnel 40cm Drilling, coordinates of laser beam to be definedAccess to laser room and tunnel AWAKE access concept including Laser Access Modes to p-tunnel and e-
gun room, safety shuttersTi:Sa laser Arrangement in a squeezed room, max laser table width is 1m
Chillers and electronics are below the tables or in the separate ventilated rack/cabinet or in the big SAS
Vacuum pulse compressor and focusing telescope.
HV (10-6 Torr) or UHV (10-8 Torr): pellicle or differential pumping
Placement is not defined yet (->AMPLITUDE)!Placement in the laser room is a base-lineIn case of p-tunnel everything must fit between p-beam and wall,“dirty” environment in p-tunnel is not good for compressor/telescope installation and maintenance
Transfer line to p-tunnelMerging point chamber
HVUHV (only 2 mirrors, possibly without in-vacuum motors)
Transfer line to e-gunSeparate small compressor3rd harmonic generation
In fore-vacuumNext to the gun
Laser dedicated list of “Things to Do”:Laser Installation
Preliminary
AWAKE access will be discussed preliminary on the dedicated meeting
Courtesy of C.Hessler
System IssuesTi:Sa laser Controls and diagnostics are provided by the supplier of the laser
system (AMPLITUDE)Vacuum pulse compressor and focusing telescope
Diagnostics are provided by the supplier
Laser beam in the p-tunnel Steady diagnostics:Focused beam spot monitor (virtual plasma, the same long distance run); near field before merging mirror; screens before and after plasma tube sensitive to “both” beams (laser, electrons, protons) also equipped with fiber-coupling for rough timimg measurementsOn demand or maintenance diagnostics:Auto-correlator, angular spectrometer, phase-front detector, …
Laser beam in the e-gun room(small compressor and 3rd harmonic generation are next to the gun)
Steady diagnostics:Virtual cathode CCD, UV energy meter, some IR signal coupled to a fiber for rough timimg measurementOn demand or maintenance diagnostics:Auto-correlator, angular spectrometer, …
Delay control between pulses: ionization and e-gun
Delay line either on one of 2 beams, proper delay simulation required.Split after RegAmp was proposed by AMPLITUDE with 2.5mJ IR output for e-gun
Laser dedicated list of “Things to Do”:Laser Operation
OTR or laser light- Imaging (lens system and CCD)- Capture and measure with PhD or
streak-camera (coupling to a fiber or lens system)
- Other techniques
Alignment of 3 beams
plasma
p-beamlaser-beam
e-beam
BPM
BPM
Alignment of 3 beams• 3 beams (protons, electrons and laser) have to be align in space and
time• Transverse accuracy ~ 0.2mm• Angular accuracy ~ 0.2mm / 10 m = 20rad• Timing electrons-laser ~ 100fs – alignment by response? Rough
alignment is needed anyway• Timing protons-laser ~ 10ps – alignment with fast PhD and scope
possible, 1pJ of light is required. Streak-camera.
For robust alignment of 3 beams we need an optical signal which comes from the same screen sensitive to 3 beams (the power of laser beam can be reduced for the measurements not to damage the screen)