Lanka Hydraulic Institute Limited (LHI) was established in 1984 by the conversion of
Coastal Engineering Research Center (CERC) of the Coast Conservation
Department (Sri Lanka) into a Public Limited Liability Company in accordance with a
Cabinet decision.
LHI has expertise that encompasses technical and engineering spheres as well as a
multi-disciplinary approach to a varied project genre, gearing its thorough knowledge
of socio-economic, financial and environmental components within each process.
The premise of dealing effectively with multi-faceted projects through a wide and
varied network of expert individuals and renowned local and foreign organizations is
enhanced by LHI proudly having the best state-of-the-art Hydraulics Laboratory in the
Indian Ocean region, giving LHI the impetus to provide total solutions in the field of
hydraulics. LHI has a rigorous and comprehensive Quality Assurance system and is
ISO 9001:2008 certified.
LHI is geared to cater to International Consultants working in the region and
elsewhere, giving them a reliable choice in outsourcing Hydraulics Laboratory
services.
Lanka Hydraulic Institute Ltd No 177, John Rodrigo Mawatha, Katubedda, Moratuwa, SRI LANKA.
Tel: + 94 11 2650471 / 2650409 Fax: + 94 11 2650470 Web: www.lhi.lk Email: [email protected]
Page | 2
AREAS OF EXPERTISE
2D and 3D Physical Model Studies
Harbour model studies including breakwater stability, overtopping, ship motion, harbor disturbance, wave and current forces etc. Coastal models for erosion management and protection Modelling of sea outfalls (storm water and effluent
outfalls) River and estuarine models Reservoir and hydraulic structures for irrigation, water supply and hydropower works Two-dimensional stability tests on breakwaters and revetments, or protection works of inland water
bodies.
Numerical Model Studies
Wave transformation and propagation Hydrodynamic studies Wave disturbance and basin resonance
Sediment transport (in sea and inland water bodies) Coastal evolution Storm water modelling Waste water and heat dispersion modelling Modelling of dredging effects Oil spill analysis River and urban hydraulics, and hydrology Water resources development
Page | 3
Field Investigations
Bathymetric and topographic surveys Directional wave measurements Water current measurements Water level measurements Salinity and temperature Wind measurements
Sediment sampling Hydrographic surveys in inland water bodies Flow measurements and measurement of other hydraulic and hydrologic parameters of rivers and inland water bodies Offshore inspection and geotechnical investigations.
Consultancy and Advisory Services
Technical pre-feasibility and feasibility studies and conceptual designs of water related engineering projects including relevant environmental considerations
Design of coastal and harbour works with technical specifications and tender documentation Design of recreational beach facilities Coastal Zone Management and related activities. Coastal stability for beach oriented tourist resort development Construction supervision
Page | 4
INFRASTRUCTURE
State-of-the-Art Hydraulic Laboratory
A wave basin of 35m (L) x 25m (W) x 0.8m (D) with four movable wave makers each 5.5m long, and three pumps capable of delivering 1.2 m3/s, alongside with all other facilities to simulate regular & irregular waves and currents;
A Two Dimensional wave flume 30m (L) x 0.8m (W) x 1.0m (D) fitted with a wave maker to produce regular or irregular waves;
Computerized data acquisition system, electronic-measuring devices such
as wave gauges, movement meters, strain gauge force meters to record model parameters, and specific driving software for model;
Standard laboratory equipment for sediment analyses; Mechanical and Electronic workshops; Special software for data acquisition; Online visual access of the basin and flume with high resolution IP cams.
An outdoor area (35m x 20m) is available for testing of inland water structures.
Advanced Numerical Simulations Unit
LHI’s Numerical Modelling facility is powered by several well known modelling software developed by DHI Water and Environment in addition to software developed in-house, and many reputed tools available in the public domain. LHI possesses the exclusive licence for DHI’s MIKE softwares and conducts a wide range of numerical model studies. LHI’s present modelling capabilities include:
MIKE 11 – rainfall/runoff model and the one-dimensional Hydrodynamic model coupled with Transport Dispersion, Sediment Transport, Urban Hydrology and Ground Water,
MIKE 21 – two-dimensional model with modules for Hydrodynamics,
Advection /Dispersion, Nearshore Waves and short waves, MIKE 12 – one-dimensional stratified Hydrodynamic and Transport
Dispersion Model, MIKE 3 – three dimensional particle / spill analysis, and LITPACK – one-dimensional Littoral Drift Simulation model.
Instruments for Field Investigations and Sample Collections
SonTek ADP System InterOcean S4DW for multiple wave parametric measurements Direct recording Current meters
Salinity and Temperature meters DGPS Positioning Systems Sediment and water sampling equipment All ancillary hydrographic and land surveying equipment.
Page | 5
CLIENTS AND PROJECTS
Region Country Client Project End
Europe France ACRI IN Coastal stabilization of French Riviera
2013
North America
Belize DANIDA Coastal Zone Management Programme- Belize
1994
Africa Algeria HMI Hydraulic Modelling of New El Kala Fishing Port
2007
HMI Hydraulic Modelling of Old El Kala Port
2008
HMI Development of Fishing Port at Messida: Hydraulic Model Studies
2014
Senegal Industries Chimiques du Senegal
Development of ICS Marine Terminal at Mboro
2012
Mauritius Rodrigues Regional Assembly EIA Study for Widening and Deepening of Passes in Rodrigues
2009
Ministry of Envi. and Sustainable Development
Coastal Protection, Landscaping and Infrastructural Works
2011
Eritrea Pöyry Energy Ltd Env. and Social Impact study of Petroleum Jetty in Massawa, Eritria
2008
Middle East
Oman Consulting Engineering Services LLC
Mathematical Model Studies for Fishery Harbour at Duqm
2014
Consulting Engineering Services LLC
Mathematical Model Studies for Fishery Harbour at Nabur
2013
Consulting Engineering Services LLC
Mathematical Model Study for the Coastal Erosion at Wudam Al Sahil
2011
Ministry of Agriculture and Fisheries
Improvement of Gamdah Fishery Harbour in Musandam Region
2012
Consulting Engineering Services LLC
Improvement of Al Lakbi Fishery Harbour
2007
Iran Flower of the East Field Investigations at Kish Island 2004
UAE Halcrow International Partnership
Al Marjan Island Development: Physical Modelling
2006
Page | 6
Region Country Client Project End
East Asia
S.Korea Kyeong Seung Design and Consulting Incorporated
Incheon Harbour: Physical Modelling
2007
Handong Global University Song-Do Beach Restoration Project: Physical Modelling
2007
SEIL Engineering Co Busan New Port: Physical Modelling
2005
Brunei Department of Public Works, Govt. of Brunei
Control of Erosion at Tanjong Sapo, Tutong and Belait in Brunei
1998
South Asia
India Karaikal Port (P) Ltd, India
Physical Mdoelling of New Breakwaters in Karaikal Port
2011
WAPCOS Ltd River Regulatory Measures in Hugli Estuary for Haldia Port
2010
Navayuga Engineering Co Ltd Numerical Model Studies for Development of Astaranga Port
2014
Machilipatnam Port Ltd Hydraulic Model Studies for Machilipatnam Port
2012
Krishnapatnam Port Co Ltd Construction of Krishnapatnam Port: Physical Modelling
2008
Ministry of Foreign Affairs Sethusamudram Ship Channel Project
2006
Maldives MT Hojgaard Design and Build of Harbour at Ga. Maamendhoo: Design Review
2013
MT Hojgaard Coastal Protection in Gulhi Falhu and K. Huraa Harbour
2012
MT Hojgaard Design and Build of Noomaraa Harbour: Design Review
2011
MT Hojgaard Design and Build of Meedhoo Harbour: Design Review
2011
UNOPS Flood Mitigating Measures at Fares-Maathoda Island
2013
Travel Club Ltd Coastal Environment Improvement of Ellaidhoo Tourist Resort
2007
Land and Marine Envi. Resources Group
Palm Tree Island Development: Mathematical Modelling
2005
Land and Marine Envi. Resources Group
Technical Study for Fun Island Barrier Reef System
2005
Danish Port Consultancy Group AS
Fuah Mulaku Harbour Project, Maldives
1996
Ministry of Public Works, Male
First Wave and Tide Monitoring Programme
1989
Ministry of Environment, Energy and Water
Development of Sewerage Facilities in Ten Islands
2008
Ministry of Environment, Energy and Water
Development of Sewerage Facilities in Four Islands
2009
Bhutan Carl Bro International River Training Works - Torsa River-Bhutan
1989
Page | 7
SRI LANKAN PROJECTS
Unawatuna Bay Shoreline Stabilization Project – Study on Beach Erosion for CCD (2014).
Strategic Cities Development Project: Consultancy Services for Hydrologic-Hydraulic Modelling of Meda
Ela and Upstreams of Kandy Lake for UDA (2014)
Investigation of Sea Bottom Profile near Galle Marine Drive: Bathymetric Survey for CCD (2014).
Survey at Kelani River, Biyagama for Lion Brewery (Ceylon) Plc (2014)
Investigation of Near-Shore Bottom Profile at Muttur in Koddiyar Bay: Bathymetric Survey for CCD (2014).
Badulla, Haliela and Ella Integrated Water Supply Project: Hydrological Investigation for Tetra Tech Inc
(2014)
Consultancy Services for Preparation of Master Plan for Storm Water Drainage System for Kallady Area,
Batticaloa for Batticaloa Municipal Council (2014)
Sea Outfall for Treated Effluent of Wastewater Treatment Plant at Base Hospital, Tangalle: Field Survey &
Design or Southern Provincial Council (2014)
Greater Ratnapura Integrated Water Supply Project - Phase I: Hydraulic Study for ABEIMA (2014)
Trincomalee Thermal Power Project: Thermal Dispersion Study for NTPC (2014)
Muttur Water Supply Project: Design of Protective Measures for Proposed Intake Structure at Neelapola for
NWSDB (2014)
Development of a Deepwater Jetty for Heavy Industry Zone, Trincomalee for SLGI (2014)
UKHP: Monitoring and Evaluation of Watershed Hydrology - Measurement of Suspended Sediment Load
at Kotmale Oya for CEB (2014)
Upper Kotmale Hydropower Project: Flood Forecasting Program for Mitsubishi Corporation (2014)
Proposed Sea Outfall for Treated Effluent at Saman Villas, Bentota: Field Survey & Design for Saman
Villas Ltd (2014)
Greater Colombo Wastewater Management Project: Rehabilitation of Sea Outfalls - Field Investigations for
Leader Civil-Guangzhou Salvage (2013)
Extension of Southern Highway from Matara to Hambantota: Phase I – from Matara to Beliatta - Study on
the Hydrological Implications for RDA (2014)
Extension of Southern Highway from Matara to Hambantota: Preliminary Hydrological Study for Feasibility
Study for RDA (2013)
Pre-Feasibility Study for Coal Fired Thermal Power Plant in Southern Sri Lanka: Field Investigations for
Electric Power Development Co Ltd (J Power) (2013)
Longitudinal Profile and Cross Sectional Survey along Sudu Ganga from Ukuwela to Bowatenna for
Mahaweli Authority (2013)
GEF-IFAD Project: Preparation of a Shoreline Status Report Covering Effectiveness of Structural / Non-
Structural Solutions Adopted by the Coast Conservation Department Since 2004 for CCD (2014)
GEF-IFAD Project: Preparation of an Information Compendium on Coastal Pollution for CCD (2014)
Energy Diversification Enhancement Project: Phase IIA – Feasibility Study for Introducing LNG to Sri
Lanka, for Oriental Consultants (Japan) (2013)
Water Supply Master Plan Update for Western Province Metropolitan Area: Water Resources Modelling
Study for Ceywater Consultants (P) Ltd (2013)
Sampur Thermal Power Project: Area Drainage and Ground Water Study for NTPC (2013)
Sampur Thermal Power Project: Water Drawl System from Mahaweli Ganga / Sea for NTPC (2012)
Update / Upgrade of the Hydrologic-Hydraulic Model and New Urban Micro-Drainage System Model for
Greater Colombo Basin for World Bank (WB) (2013)
Oluvil Port Development Project: Studies on Beach Erosion for Sri Lanka Ports Authority (SLPA) (2010)
Page | 8
Colombo Port Expansion Project: Harbour Infrastructure Works – 2D (Flume) Physical Modelling for
Hyundai (2010)
Mahaweli River Survey at Halloluwa for York Hotels (Kandy) Ltd (2010)
Detailed Design of Fishery Anchorages at Kalametiya for UNOPS-LKOC (2010)
Development of Modern City at Southern Border of the Colombo Port for Uni Consultancy Services (2010)
Hambantota Port Development Project: Study on Artificial Island for China Harbour Engineering Co Ltd
[CHEC] (2010)
Kelani River Survey for Colombo Dockyard Ltd (2010)
Bathymetric Surveys for the Design of Marine Structures at Kaikawala, Kaluwankerni and Palachchenai for
UNOPS-LKOC (2010)
Training Program on MIKE 21 for Ceylon Fishery Harbours Corporation (2010)
Development of the Heavy Industry Zone in the BOI Licence Zone, Trincomalee – Field Investigations for
Trincomax Industries (Pvt) Ltd (2009)
Appraisal Mission of Kalu Ganga Development Project for The OPEC Fund for International Development
[OFID] (2009)
Puttalam Coal-Fired Thermal Power Plant Project – Wave Study for China Harbour Engineering Co Ltd
[CHEC] (2009)
Design & Construction of Dikkowita Fishery Harbour for BAM International (2009)
Assessing Colombo Wastewater Systems for Asian Development Bank (ADB) (2009)
Design & Construction Supervision Work of Cod Bay Fishery Harbour for Ceylon Fishery Harbour
Corporation (CFHC) (2009)
Muthurajwela SPM & 2nd Offshore Pipeline Project – IEE Study for Ceylon Petroleum Storage Terminals
Ltd (2008)
Pottuvil Stormwater Design for North East Coastal Community Development Project (2008)
Trincomalee Integrated Infrastructure Project for China Harbour Engineering Co (2008)
Colombo Port Expansion Project – 2D (Flume) Physical Modeling for Hyundai (2008)
Detailed Design of Sewage Sea Outfall at Lunawa for Environmental Engineering Consultants (2008)
Polonnaruwa Water Supply Scheme – Manampitiya Water Intake for the National Water Supply & Drainage
Board (2008)
Valaichchenai Fishery Harbour – Design & Supervision for Ceylon Fishery Harbours Corporation (2007)
Galle Port Development – Topographic Survey & Hydrographic Survey for Pacific Consultants International
(2007)
Nearshore Profile Survey at Hambantota – Survey for Penta Ocean Construction Co Ltd (2006/2007)
Hambantota Seaport Development (Modelling) – Phase 1 Project – Mathematical Modelling for Sri Lanka
Ports Authority (2006/2007)
Panadura Fishery Harbour – Mathematical Modelling for Chang Jiang Institute of Survey Planning, Design
& Research of Chang Jiang Water Resources Commission (CWRC) (2006/2007)
Hambantota Seaport Development: Directional Wave Measurements for SLPA (2006/2008)
Near-Shore Profile Survey at Hambantota for Penta-Ocean Construction Co Ltd, Japan (2005/2006)
Sri Lanka Tsunami Reconstruction Program: Fish Harbours Repairs and Improvements for CH2M Hill, USA
(2006/2007)
Recovery, Rehabilitation and Development of Kirinda Fishery Harbour: Topographic and Bathymetric
Survey for Padeco Co Ltd, Japan (2005/2006)
Reclamation Study of Eastern Coast of Sri Lanka for Ministry of Urban Development and Water Supply
(2005/2006)
Colombo Port Directional Wave Measurements for SLPA (2005/2006)
Hambantota Salt Intake Improvement for Lanka Salt Ltd (2005/2006)
Page | 9
Bentota Beach Survey for Ministry of Fisheries and Aquatic Resources: Coastal Resources Management
Project (2005)
Hambantota Seaport Development: Detailed Feasibility Studies for Ramboll, Denmark and SLPA
(2004/2005)
Colombo Port Enhancement Project: Mathematical Modelling for Japan Port Consultants, Japan (2004)
Recovery, Rehabilitation and Development of Kirinda Fishery Harbour: Topographic, Bathymetric and
Underwater Survey for ECOH Corporation, Japan (2004/2005)
Colombo Port Efficiency and Expansion Project for Scott Wilson, UK (2003/ 2005)
Coastal Investigations for GTZ
Wave Measurements and 2D Model Studies for Kirinda Fishery Harbour for Nippon Tetrapod Ltd., Japan
Wave Measurements Colombo for JICA
Hikkaduwa Coastal Investigation for Erosion Management (1989/1991) for Portconsult, Denmark
Investigation for Trincomalee Coal Power Plant Project - Black and Veatch International (1980/1987)
Wave Measurements and Environmental Studies for Thermal Power Project Kalpitiya (1996/1997)
Mapping of Coastal Habitats Sri Lanka for Coastal Resources Management Project - University of Rhode
Island (1988)
Model Studies for Salinity Barrier across Kelani river - Danida funded Project (1996/1997)
Quantitive Surface Water Management of Bolgoda River system - EC Funded Project (1994/1995)
Western River Basin Sector Project - ADB with Danish Hydraulic Institute (1998/1999)
Coastal Resources Management Project (TA) with Primex of Philippines (1998)
Physical and Mathematical Model - Galle Harbour Feasibility Study - Posford Duvivier (SLPA)
Colombo South Harbour - Field Investigations & Mathematical Modelling - Maunsell (SLPA) (2000)
CRMP - Offshore Sand Search - Seismic Surveys, Vibro Coring, Sand Sampling for Portconsult
(2001/2002)
Hydraulic Studies - Colombo Drainage Improvements JICA (SLLRDC) (2001)
Colombo Katunayake Expressway - Hydraulic and Hydrologic Studies - Daewoo Engineering - RDA
(2001/2002)
Kelani River Flood Study - Department of Irrigation - Danida Funded Project
Kelani Ganga Water Quality Study - National Water Supply & Drainage Board, Sri Lanka
Model Studies for Expansion of Ambatale Intake - National Water Supply & Drainage Board, Sri Lanka
Investigations, Model Studies and Conceptual Designs for Panadura, Chilaw, Hikkaduwa Fishery Harbour
Anchorages for Ceylon Fishery Harbours Corporation (CFHC) - ADB Fisheries Sector Project
Investigations Model Studies and complete Feasibility Study for Dikkowita Fishery Harbour - CFHC - ADB
funded
Detailed Design and Tender documents for Beruwala, Puranawella, Hikkaduwa Fishery Harbours - CFHC
Coast Protection Works including investigations, designs and construction supervision for the following
tourist resorts - Hotel Ceysands, Bentota, Hotel Sinbad, Kalutara, Hotel Dolphin, Waikkal Negombo,
Robinson Club, Bentota
Oluvil Harbour Project - Field investigations, Feasibility Studies & Detailed Designs (SLPA)
Storm Water Drainage Projects - UDLIHP - Ministry of Housing
EIA for Offshore Sand Dredging - CKE-RDA, CPC Tank Farm, QEQ Colombo Port
Salinity Studies - Gin Ganga, Nilwala Ganga, Kalu Ganga (NWS & DB)
CRMP - Coastal Stabilisation, Field Investigations, Wave Modelling
Page | 10
KEY PERSONNEL
H. N. R. Perera CEO / Director
BSc Eng (SL), PG Dip (Coastal Eng)
(Netherlands), CEng, FIE (SL)
Expertise: Coastal Engineering
Overall Exp : 34 yrs
Dr. K. Raveenthiran Senior Engineering Manager
BSc Eng (Hon) (SL), MEng (Hydraulics) (Thailand), D. Eng (Coastal Eng) (Japan)
Expertise: Coastal /Water Engineering Overall Exp : 20 yrs
Dr. S. Wickramaratne Senior Engineering Manager (R & D)
BSc Eng (Hon) (SL), PhD (Coastal / Project Mgt) (Canada), CEng, MIE (SL)
Expertise: Coastal Engineering Overall Exp : 11 yrs
Dr. D.P.C. Laknath Engineering Manager
B. Sc. Eng (Hon) (SL), M.Sc. (Water Res) (Thailand), PhD (Coastal Eng) (Japan), MISOPE, MISCE, AMIESL
Expertise: Coastal Engineering Overall Exp : 12 yrs
K. P. M. Fernando Engineering Manager
BSc Eng (Hon) (SL), MSc (Coastal Eng) (SL), AMIE (SL)
Expertise: Coastal Engineering Overall Exp : 11 yrs
Dr. P.L. Ranasinghe Engineering Manager
BSc Eng (Hon) (SL), MSc. (Coastal Eng) (SL), PhD (Coastal Eng) (Japan)
Expertise: Coastal Engineering Overall Exp : 8 yrs
S. M. C. K. Subasinghe Engineering Manager
BSc Eng (Hon) (SL), M Eng (Water Res) (Thailand), AMIE (SL)
Expertise: Water Res. Engineering Overall Exp : 6 yrs
Dr. H.A.K.S. Ariyarathne Engineering Manager
BSc (Hons) (SL), MSc(USA), MSc (Coastal Eng) (SL), PhD (Coastal Eng) (USA)
Expertise: Coastal Engineering Overall Exp : 12 yrs
M. S. L. Fernando Engineering Manager
BSc Eng (Hon) (SL), MSc. (Coastal Eng) (SL), AMIE (SL)
Expertise: Coastal Engineering Overall Exp : 8 yrs
Page | 11
T.A.J.G. Sirisena Research Engineer
BSc. Eng (Hon) (SL), M.Eng (Water Res) (AIT), AMIE (SL) Overall Exp : 4 yrs
I. L. Abeygoonasekera Research Engineer
BSc. Eng (Hon) (SL), AMIE (SL) Overall Exp : 5 yrs
R. W. C. N. Rajapaksha Research Engineer
BSc. Eng (Hon) (SL), AMIE (SL) Overall Exp : 5 yrs
I. G. I. K. Kumara Research Engineer
BSc. Eng (Hon) (SL), AMIE (SL) Overall Exp : 4 yrs
K. B. A. Silva Research Engineer
BSc. Eng (Hon) (SL), AMIE (SL) Overall Exp : 4 yrs
D. E. N. Senarathne Research Engineer
BSc. Eng (Hon) (SL), AMIE (SL) Overall Exp : 3 yrs
K.Maiyourathaan Research Engineer
BSc. Eng (Hon) (Cuba), AMIE (SL) Overall Exp : 3 yrs
S.M. Hewavidana Graduate Engineer
BSc. Eng (Hon) (SL) Overall Exp : 1 yrs
T.M.S.B. Tennakoon Graduate Engineer
BSc. Eng (Hon) (SL) Overall Exp : 1 yrs
M. K. N. Neminda Hydrographic Surveyor
BSc. Survey. Sc. (SL) Overall Exp : 4 yrs
Y.Karunaratne
Hydrographic Surveyor
BSc. Survey. Sc. (SL) Overall Exp : 2 yrs
Page | 12
OOrrggaanniizzaattiioonnaall SSttrruuccttuurree