land development update-naiop/nvbia joint meeting: sept. 8, 2016
TRANSCRIPT
![Page 1: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/1.jpg)
Land Development Update
NAIOP/NVBIA Joint MeetingSeptember 8, 2016
![Page 2: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/2.jpg)
05/01/2023 2
Booster Shot Hiring
Agency Division Classification Status Comments1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 DPZ Zoning Evaluation Planner III S27 1 - Filled Filled as Planner III5 FCDOT Transportation Planner II S24 1 - Filled 6 FCDOT Transportation Planner II S24 1 - Filled 7 Fire Marshal Fire Inspector II S20 1 - Filled 8 Fire Marshal Fire Inspector II S20 1 - Filled 9 Fire Marshal Administrative Assistant II S13 1 - Filled
10 Fire Marshal Engineer III S27 1 - Filled
11Health Department Environmental Health Environmental Health Spec II S23 1 - Filled
12 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 13 LDS Director's Office Management Analyst I S21 1 - Filled 14 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 15 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 16 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 17 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 18 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 19 LDS IT Business Analyst III S27 1 - Filled 20 LDS Director's Office Planner IV S29 1 - Filled 21 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 22 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled23 LDS Site Development & Inspections Senior Engineering Inspector S21 1 - Filled 24 LDS Director's Office Assistant Director S34 1 - Filled LDS Operations Director25 LDS HR Human Resources Generalist II S24 1 - Filled 26 LDS Building Plan Review & Inspections Engineer IV S29 1 - Filled Reclassified from Eng III to Eng IV27 Urban Forestry Urban Forester II S24 1 - Filled 28 Fire Marshal Engineer III S27 2 -Interviews re-advertised; interviews in progress
![Page 3: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/3.jpg)
05/01/2023 3
Average Site Plan Timelines
Plan Types Target May - July
Last Period (Apr - June)
Avg for
2015Avg for 2014
Infill Lot Grading Plan (INF, Non-bonded Single Family)
21 18 19 26.0 25.9
Major Plan First Submission (SP, SD, PI)
60 52 53 58.5 66.8
Major (SP, SD, PI) Second DPE
14 / 28 22 23 22.2 33.1
Major (SP, SD, PI) Subsequent Non-DPE
45 39 36 62.1 68.6
![Page 4: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/4.jpg)
05/01/2023 4
SDID Review Times by Branch
Three Months Average Review Times SDID North Branch Central Branch South Branch
Current Period
Last Period Current Period
Current Period
Last Period Current Period
Current Period
Last Period Current Period
Current Period
Last Period Current Period
Plan Types TargetMay - July
April-June
# of Plans
Approval %
May - July
April-June
# of Plans
Approval %
May - July
April-June
# of Plans
Approval %
May - July
April-June
# of Plans
Approval %
Infill Lot Grading Plan (INF, Non-bonded Single Family)
21 Days 18 19 230 81 15 16 131 88 23 24 50 74 21 22 49 69
Major Plan First Submission (SP, SD, PI) 60
Days 52 53 20 0 42 50 5 0 61 62 4 0 53 49 11 0
Major (SP, SD, PI) Second DPE14 -28 Days 22 23 10 90 18 18 5 100 17 17 1 100 28 34 4 75
Major (SP, SD, PI) Subsequent Non-DPE 45
Days 39 36 16 75 16 17 1 100 41 36 8 75 41 41 7 71
![Page 5: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/5.jpg)
05/01/2023 5
Average Review TimeResidential Building
![Page 6: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/6.jpg)
05/01/2023 6
Average Review Time Commercial Building
![Page 7: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/7.jpg)
05/01/2023 7
Average Review Time Commercial Building
![Page 8: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/8.jpg)
05/01/2023 8
Fairfax First Update
![Page 9: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/9.jpg)
05/01/2023 9
Top 7 Initiatives
![Page 10: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/10.jpg)
05/01/2023 10
Fire Marshal’s Office
![Page 11: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/11.jpg)
05/01/2023 11
Fire Marshal Inventory
Plan Type No. on Hand Oldest Date Work Day Lag
Sprinkler, Tenant plans without calculations 10 8-31-16 3
Sprinkler, Tenant plans with calculations 6 8-11-16 17
Sprinkler, Shell Bldgs., NFPA 13 systems 8 7-29-16 26
Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 9 8-16-16 14
Town of Herndon Building Tenant 2 9-2-16 1
Fire Alarm, Tenant plans 19 8-31-16 3
Fire Alarm, Shell Bldgs. 9 8-24-16 8
Door Lock / Security plans 1 9-2-16 1
Range Hood/Tanks/Foam/Public Safety Plans /Misc. 8 8-31-16 3
Site Plans/Rezoning 5 / 0 9-2-16 1
High-Piled Storage Plans 2 8-19-16 11
Evacuation / Lockdown Plans 0 -- 0
Burkholder Building Summary 79 7-29-16 XXXXXXXXX FM Architectural Review done at Herrity Building(Class 4 and Greater Building Plans) 11 8-25-16 7
FM Architectural Review (Fast Track Tenant Plans) 0 -- 0
FM Arch. Review (non-Fast Track Tenant Plans) 8 8-30-16 4
Herrity Building (B-2) Summary 19 8-25-16 XXXXXXXXX
![Page 12: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/12.jpg)
05/01/2023 12
Planning & Zoning
![Page 13: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/13.jpg)
05/01/2023 13
New NVBIA/NAIOP Webpage
http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm
![Page 14: Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070516/58751ca71a28ab05598b7a1d/html5/thumbnails/14.jpg)
05/01/2023 14
Thank you