lampiran bathimetri,ecoshounding,hidro
TRANSCRIPT
-
8/10/2019 Lampiran Bathimetri,Ecoshounding,Hidro
1/2
Volume : 6.00 km
Lokasi : Malinau, Kaltara
A. PERSIAPAN, MOBILISASI, DEMOBILISASI)
Volume Pekerjaan = 6 km
Kapasitas/Tim/Hari = 1 km
Jumlah Tim = 4 Orang
Waktu Pelaksanaan = 15 hari
a. Mobilisasi Personil dan Peralatan
1 Tiket Pesawata Surabaya - Tarakan = 4 Orang x 2 pp x Rp. 2,000,000 = Rp. 16,000,000
Speed Boat (Tarakan - Malinau) = 4 Orang x 2 pp x Rp. 400,000 = Rp. 3,200,000
2 Penginapan Base Camp = 2 Unit 20 Hari x Rp. 200,000 = Rp. 8,000,000
3 Konsumsi = 15 hari x 4 org x Rp. 25,000 = Rp. 1,500,000
Jumlah (A) = Rp. 28,700,000
B. PEMBUATAN/ PEMASANGAN TUGU BM (Bench Mark) dan CP (Control Point)
Volume Pekerjaan = 4 tugu
Kapasitas/Tim/Hari = 2 tugu/hari
Jumlah Tim = 1 tim/lokasi
Waktu Pelaksanaan = 2 hari
1. Gaji
a. Surveyor = 1 Orang x 2 Hari x Rp. 250,000 = Rp. 500,000
c. Buruh Lokal = 4 Orang x 2 Hari x Rp. 100,000 = Rp. 800,000
2. Uang Makan
a. Surveyor = 1 Orang x 2 hari x Rp. 100,000 = Rp. 200,000
3. Biaya Material
a. Tugu BM = 4 Tugu x Rp. 200,000 = Rp. 800,000
b. Patok CP (Paralon) = 4 Tugu x Rp. 100,000 = Rp. 400,000
4. Tranportasi
a. Sewa kendaraan Roda 4 + BBM = 1 Unit x 2 hari x Rp. 250,000 = Rp. 500,000
Jumlah (B) = Rp 3,200,000
C. SURVEY TOPOGRAFI
Volume = 20 Ha
Jumlah Tim = 1 Tim
Kapasitas Tim/hari = 4 km
Waktu Pelaksanaan = 5 hari
1. Gaji
a. Surveyor = 1 Orang x 5 Hari x Rp. 250,000 = Rp. 1,250,000b. Ass. Surveyor = 2 Orang x 5 Hari x Rp. 150,000 = Rp. 1,500,000
c. Tenaga Lokal = 3 Orang x 5 Hari x Rp. 100,000 = Rp. 1,500,000
2. Uang makan
a. Surveyor = 1 Orang x 5 hari x Rp. 50,000 = Rp. 250,000
b. Ass. Surveyor = 4 Orang x 5 hari x Rp. 50,000 = Rp. 1,000,000
3. Biaya alat
a. Theodolite Total Station (TS) = 1 Unit x 5 hari x Rp. 250,000 = Rp. 1,250,000
b. Waterpass/ Leveling = 1 Unit x 5 hari x Rp. 75,000 = Rp. 375,000
c. GPS RTK / Trimbel DGPS = 1 Unit x 5 hari x Rp. 1,500,000 = Rp. 7,500,000
d. Radio Komunikasi/ Handy Talky = 5 Buah x 5 hari x Rp. 25,000 = Rp. 625,000
e. ATK Ls = Rp. 100,000
4 Sewa Kendaraan
a. Sewa kendaraan Roda 4 + BBM = 1 Unit x 5 hari x Rp. 400,000 = Rp. 2,000,000
Jumlah (C) = Rp. 17,350,000
D. SURVEY ARUS
Volume = 2 Titik
Jumlah Tim = 1 Tim
Kapasitas Tim/hari = 2 Titik
Waktu Pelaksanaan = 2 hari
1. Gaji
a. Surveyor = 1 Orang x 2 Hari x Rp. 300,000 = Rp. 600,000
b. Ass. Surveyor = 2 Orang x 2 Hari x Rp. 200,000 = Rp. 800,000
c. Tenaga Lokal = 1 Orang x 2 Hari x Rp. 100,000 = Rp. 200,000
2. Uang makan
a. Surveyor = 1 Orang x 2 hari x Rp. 50,000 = Rp. 100,000
b. Ass. Surveyor = 1 Orang x 2 hari x Rp. 50,000 = Rp. 100,000
3. Biaya alat
a. Current Meter = 1 Unit x 2 hari x Rp. 250,000 = Rp. 500,000
c. GPS Garmin = 1 Unit x 2 hari x Rp. 30,000 = Rp. 60,000
4 Sewa Kendaraan
a. Sewa Perahu = 1 Unit x 2 hari x Rp. 1,000,000 = Rp. 2,000,000
Jumlah (D) = Rp. 4,360,000
RENCANA ANGGARAN BIAYASURVEY TOPOGRAFI DAN BATHYMETRI
Malinau, Kalimantan Utara
-
8/10/2019 Lampiran Bathimetri,Ecoshounding,Hidro
2/2
E SURVEY BATHYMETRI, HIDRO-OCEANOGRAFI
Volume = 6 Km
Jumlah Tim = 1 Tim
Kapasitas Tim/hari = 2 KmWaktu Pelaksanaan = 3 hari
1. Gaji
a. Surveyor = 1 Orang x 3 Hari x Rp. 300,000 = Rp. 900,000
b. Ass. Surveyor = 3 Orang x 3 Hari x Rp. 150,000 = Rp. 1,350,000
c. Tenaga Lokal = 4 Orang x 15 Hari x Rp. 100,000 = Rp. 6,000,000
2. Uang makan
a. Surveyor = 1 Orang x 3 hari x Rp. 50,000 = Rp. 150,000
b. Ass. Surveyor = 2 Orang x 3 hari x Rp. 50,000 = Rp. 300,000
3. Biaya alat
a. Echosounder + Trimbel DGPS = 1 Unit x 3 hari x Rp. 1,500,000 = Rp. 4,500,000
b. Laptop = 1 Unit x 3 hari x Rp. 150,000 = Rp. 450,000
e. Pasang Surut = 1 Unit x 15 hari x Rp. 100,000 = Rp. 1,500,000f. Radio Komunikasi/ Handy Talky = 1 Buah x 3 hari x Rp. 50,000 = Rp. 150,000
g. Sewa Perahu = 1 Buah x 3 hari x Rp. 1,000,000 = Rp. 3,000,000
h. Kayu, Tali Ls = Rp. 300,000
Jumlah (E) = Rp. 18,600,000
F PENGOLAHAN DATA ,PENGGAMBARAN DAN PELAPORAN
Waktu pelaksanaan = 15 hari
1. Gaji
a. Juru Gambar/ Operator CAD = 1 Orang x 15 hari x Rp. 250,000 = Rp. 3,750,000
2. Reproduksi/ Pencetakan Peta Ls = Rp. 1,000,000
Jumlah (F) = Rp. 4,750,000
Total (A+B+C+D+E+F) = Rp. 76,960,000
NB ;
- DP 50% di bayar di muka
- Sisa Pembayaran 50% dibayar setelah laporan akhir diterima
- Waktu pelaksanaan pekerjaan 30 hari
- dimulai dari titik awal pengukuran