LAINS FARM SOLAR FARM OVERVIEW CLIENT INRG SECTORS Energy LOCATION Thruxton PLANNING AUTHORITY Test Valley Borough Council HIGHWAY AUTHORITY Hampshire County Council PROJECT TEAM INRG PROJECT MANAGER William Griffiths PROJECT DIRECTOR James Darrall RELATED PROJECTS Walpole Bank Solar Farm PROJECT TPA was appointed by INRG to support a planning application for a 5MW solar farm at Thruxton near Andover, Hampshire. APPROACH A planning application was submitted in 2014. To support the planning application, TPA produced a Construction Traffic Management Plan (CTMP). This set out information on the forecast construction vehicle trip generation, and provided a strategy to minimise the effect of construction traffic on the local highway network. As part of the CTMP, TPA prepared access drawings and swept path analysis to demonstrate that safe access could be achieved, and engaged with the local highway authority to agree an appropriate access route for the construction period. In addition, TPA liaised with Highways England to resolve issues surrounding glint and glare, with could affect drivers on the A303. OUTCOME The solar farm was granted planning permission in July 2015. The solar farm has since been constructed and is now operational. PLANNING APPLICATION PRE-APPLICATION PLANNING APPEAL POST-PLANNING POST-CONSTRUCTION, MONITORING & VALIDATION

Upload: others

Post on 09-Feb-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

  • LAINS FARM SOLAR FARM

    OVERVIEW CLIENT INRG SECTORSEnergy

    LOCATIONThruxton PLANNING AUTHORITYTest Valley Borough Council

    HIGHWAY AUTHORITYHampshire County Council PROJECT TEAMINRG

    PROJECT MANAGERWilliam Griffiths PROJECT DIRECTORJames Darrall

    RELATED PROJECTS Walpole Bank Solar Farm

    PROJECT

    TPA was appointed by INRG to support a planning application for a 5MW solar

    farm at Thruxton near Andover, Hampshire.

    APPROACH A planning application was submitted in 2014. To support the planning

    application, TPA produced a Construction Traffic Management Plan (CTMP).

    This set out information on the forecast construction vehicle trip generation,

    and provided a strategy to minimise the effect of construction traffic on the

    local highway network.

    As part of the CTMP, TPA prepared access drawings and swept path analysis to

    demonstrate that safe access could be achieved, and engaged with the local

    highway authority to agree an appropriate access route for the construction

    period.

    In addition, TPA liaised with Highways England to resolve issues surrounding

    glint and glare, with could affect drivers on the A303.

    OUTCOME The solar farm was granted planning permission in July 2015. The solar farm

    has since been constructed and is now operational.

    PLANNING APPLICATION

    PRE-APPLICATION

    PLANNING APPEAL

    POST-PLANNING POST-CONSTRUCTION,