  • 7/27/2019 Lab report 2.doc

    1/4

    ET 603

    ELECTRICAL MAINTENANCE & REPAIR

    TITLE : THREE PHASE DISTRIBUTION BOARD

    OUTCOMES :

    Demonstrate a three phase distribution board installation which follow the MS IEC 60634 and

    electricity regulation 1994.

    Demonstrate the specification a three phase small switch board which follow the MS IEC

    60634 and electricity regulation 1994.

    Conduct maintenance and fault detection of the distribution board.

    EQUIPMENT :

    Distribution board box

    MCCB (40A/60A)

    RCCB (63A/100mA)

    RCCB (40A/30mA)

    MCB (6A)

    MCB (20A)

    Tool box

    Multimeter

    Mega meter

    Cables (red,yellow,blue,black,green)

    PROCEDURES :

    i. Firstly, draw a single line diagram to understand how to install hardware into a distribution

    board.

    ii. After complete a single line diagram, before install hardware into distribution board, must

    know the condition device before install in the distribution board and which follow a single

    line diagram.

    iii. Check cables connection after install hardware.

    iv. After check cables connection, check installation device with using continuity test.

    v. Get a result after using continuity test.

  • 7/27/2019 Lab report 2.doc

    2/4

    ET 603

    ELECTRICAL MAINTENANCE & REPAIR

    EXERCISE 2

    Identifying the data labels at the protection device in the distribution board.

    Protection Device

    Types

    Brand Voltage Rating Nominal Current Operating Current

    Moulded Case

    Circuit Breaker

    EPS 415 VOLT 25kA 63A

    Residual Current

    Circuit Breaker

    TAIAN-JAYA 415 VOLT 63A 30mA

    Miniature Circuit

    Breaker

    EPS 415 VOLT 6A 20A

    6A

    EXERCISE 4

    Conduct maintenance and fault detection of the distribution board.

    Testing Measurement Equipment Remarks

    Continuity Test Multimeter

    Insulation Resistance Test Multimeter

  • 7/27/2019 Lab report 2.doc

    3/4

    ET 603

    ELECTRICAL MAINTENANCE & REPAIR

    DISCUSSION

    A. Explain the meaning of data labelled at the protection device casing in the distribution

    board.

    a) MCCB

    -The standard range of Moulded Case Circuit Breakers (MCCBs) are designed for

    circuit protection of low voltage distribution system. They are suitable for application

    as main breakers and for protection of branch and feeder circuit & connected

    equipments / load. These MCCBs provide overload and short circuit protection for all circuit

    elements. They are designed for use in Switchboards, Control Panels, Combination Starters,

    in separate enclosures and meet the requirements of lighting, distribution and power circuits.

    b) RCCB

    -The Fault current overloads and short circuits can be detected by circuit breakers like MCBs

    ,MCCBs & HRC Fuses etc. But, Circuit breakers dont detect leakage currents, which are

    dangerous for humans and livestock and if not detected can lead to fire hazards.

    c) MCB

    -It automatically switches off the electrical circuit during abnormal condition of the network

    means in over load condition as well as faulty condition. The fuse does not sense

    but Miniature Circuit Breaker does it in more reliable way. MCB is much more sensitive to

    over current than fuse.

    B. State THREE MS IEC 60364 or electricity regulation 1994 which

    related to the three phase distribution.- Supply voltage single phase 230V AC nominal, range +10%, -6%;- Supply voltage 400V AC nominal three-phase, the range of +10%, -6%;

    - The permitted frequency is 50Hz 1% and

    -The type of earthing system (TT system)

  • 7/27/2019 Lab report 2.doc

    4/4

    ET 603

    ELECTRICAL MAINTENANCE & REPAIR

    CONCLUSION

    - In this lab for Three Phase Distribution Board we able to demonstrate a

    three phase distribution board installation which follow the MS IEC 60364

    and electricity regulation 1994.After that,we also know how to determinethe specification on three phase small switch board which follow the MS

    IEC 60364 and electricity regulation 1994.Lastly,know to conduct

    maintenance and fault detection of the distribution board.