L a C o s t a C a n y o n H i g h S c h o o lMaster Plan, January 16, 2012Roesling Nakamura Terada Architects
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 3
I n t r o d u c t i o n
I n t r o d u c t i o n1.0 INTRODUCTION
The vision for the facilities of the San Dieguito Union High School District focuses on creating learning environments that embrace variety in teaching and learning styles, are responsive to our rapidly changing world, and will encourage students to be good stewards and citizens of a greater community.
Three areas of focus are:
-Flexible, Adaptable, and Technology Rich Facilities-Sustainable High Performance Environments for Learning-Community Focused Campuses
1.0 Campus Capacity
The current campus enrollment is approximately 2,500 students. The campus can serve 3,000 students at capacity.
The goal of the campus build out is to provide permanent classroom buildings and facilities to function at campus capacity.
1.1 Scope
The scope of services to accomplish the Master Plans for La Costa Canyon High School includes:
-Facility Evaluations
-Programming -Site and Facilities Development -Project Budget Development -Master Plan Document Preparation
1.2 Campus Identity
The campus, established in 1995, is an open campus with a collegiate atmosphere. The quality of the campus relates a strong community feeling, and is reinforced with high academic achievement and an excellent athletic program. The goal of the master plan is to strengthen the campus through increased interaction and flexibility.
The master plan process focused on reenvisioning the campus and facilities to foster 21st Century Learning, providing students with the tools to prepare for the unforeseen. In a world with so much information the critical issue becomes a student’s ability to discernibly synthesize and collaborate. To accomplish this goal, the faculty strives to foster imagination, effective communication, adaptability, curiosity, critical thinking and problem solving.
Campus design and spaces need to be flexible, adaptable and varied. To foster cross disciplinary exchange and campus identity, the master plan draws connections between disparate sections of campus to create a unified whole, and improve the flexibility of the facilities.
As a relatively new campus, the majority of the campus will remain, receiving technology
upgrades and air conditioning.
1.3 Requirements of Learning
Many of the spaces and techniques found to foster 21st century learning have been established as timeless elements of learning. These include social learning, hands on learning, and comprehension.
Environmental aspects that contribute to learning include:
- natural light & fresh air- interaction- flexibility/adaptability
The master plan creates and enhances spaces across the campus to create a technology rich and flexible learning environment for daily classes and extracurricular activities. Indoor/outdoor teaching space gives teachers flexibility, while large gathering spaces accommodate collaborative campus activities.
Technology rich classrooms not only provide spaces for organized classroom learning, but also space for group learning, clubs and extracurricular activities. These activities are often where students engage in flexible, rigorous, and technology rich learning.
1.4 Reflection of Campus Ideals
The strongest critiques of the existing La Costa Canyon High School campus relate to usable outdoor space, and shade.
It is a goal of the reenvisioned master plan to remedy this by creating and improving gathering space at the center of campus as well as at the existing quads. Quad based outdoor teaching spaces are easily accessible from their respective classrooms, and will provide a variety of learning spaces on campus.
The connections between these outdoor spaces are strengthened by the placement of new campus facilities, completing the campus.
The new facilities increase the technological capabilities of the campus. The much needed Videoconference Center provides students and faculty a space for media presentations and distance learning.
The new general classroom building and science buildings replace the portable buildings at the 700’s quad, providing permanent technology rich, flexible learning spaces. The new Field House building provides much needed flexibility to the athletics program, and becomes a venue for school wide events.
Lastly, the Campus facility upgrades reflect a campus focus on sustainability and energy efficiency. New and existing facilities will be outfitted with energy efficient building envelopes, lighting and energy management systems to maximize energy efficiency. Additional photovoltaic panels will also be added to the campus to further offset energy use.
Administration Building
Performing Arts Center
Library
Classroom Building
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 4
NORTH E x i s t i n g C a m p u s P l a n
E x i s t i n g C a m p u s P l a n
Admin
PAC1100s
Gym
Stadium
MediaCenter800s
Desert300s
Alpine400s
Arroyo500s
Arbor600s
Chaparral700sTech & Arts
900s
CounselingCenter200s
1300s
6th Quad
Campus Entry
30 150
Informal Entry
1300’s Building
1300’s Building
PAC Trellis
Classroom Building
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 5
NORTH E x i s t i n g C a m p u s Z o n e s
E x i s t i n g C a m p u s D i a g r a m
Athletics
AcademicCenter
Administration
Arts & Tech
Academics
30 150
Classroom Building
Gymnasium Entrance
Gym - Back Entrance
Library Entrance
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 6
NORTH C a m p u s T i m e l i n e
C a m p u s T i m e l i n e
The original campus included the: - Administration Building - Counseling Building- General Classrooms- Gymnasium- Arts & Theater
Original Campus - 1995
- Arts & Technology Building- Classroom Portables Added
5th Quad Built - 1996
- Food Satellite- Lunch Shade Structure
Food /Shade Structure - 2000
- New Classroom Building
6th Quad Added - 2005
- 1 mW PV Parking Shade Structure
PV Structure - 2010
30 150
La Costa Canyon High School Master PlanSan Dieguito Union High School District
P r o p o s e d C a m p u s I m p r o v e m e n t s
Page 7NTS
S i t e P l a n - P r o p o s e d C a m p u s I m p r o v e m e n t sNORTH
Theater 1100s
Media Gym
800s
REPLACE PORTABLES WITH 2-STORY CLASSROOM BUILDING (INCLUDING PHYSICS LABS)
RESTORE ART YARD
RELOCATE CULINARY ARTS + ADD CULINARY GARDEN
IMPROVE FIELD AREA UTILIZATION
IMPROVE TRAFFIC FLOW
REMODEL INTO COUNSELING CENTER + REGISTRAR
REPAIR + UPDATE CONCESSIONS + PRESS BOX
EXPAND MEDIA CENTER TO OUTDOOR PATIO CONSOLIDATE
STUDENT CENTER
REPAIR + UPDATE SCIENCE LABS + SPECIALTY CLASSROOMS
RELOCATE MAINT. + OPERATIONS
IMPROVE SECURITY + ADD CART PATH
ACCESS
NEW VIDEOCONFERENCE
CENTER
NEW FIELD HOUSE
RELOCATE FOOD SERVICE ADJACENT TO SATELLITE
MODIFY CLASSROOMS
INTO FLEX SPACE FOR TESTING &
STORAGE
UPGRADE CLASSROOMS TO 21ST CENTURY LEARNING STANDARD
REDEVELOP QUADS TO OUTDOOR LEARNING AREAS
La Costa Canyon High School Master PlanSan Dieguito Union High School District
NORTH
30 150
S i t e P l a n - C a m p u s R e n o v a t i o n P l a nPage 8
C a m p u s R e n o v a t i o n P l a n
Minor RenovationsMajor RenovationsNew ConstructionPriority 2 - Wishlist
Technology Upgrades Only
New 2-Story Structure6,645 Sq. Ft.Videoconference Center
New 1-Story Structure14,400 Sq. Ft.New Field House
Existing 1-Story Structure2,520 Sq. Ft.
Renovate classroom into Food Service
MEDIA CENTER
ADMIN
PAC1100s
INTERIM HOUSING
Technology Upgrades & Air Conditioning
New 1-Story Structure3,500 Sq. Ft.Science Labs
GYM
300s
200s
400s
500s
700s
600s
800s
900s
1300s
New 2-Story Structure15,700 Sq. Ft.Classroom Building
Existing 1-Story Structure4,200 Sq. Ft.Minor Remodel
Existing 1-Story Structure21,679 Sq. Ft.
Renovate Library to Media Center & Renovate
Flexible Classrooms
1. New Maintenance and Operations facility in order to restore Arts Yard to the 900’s quad.
2. New Food Service Facility achieved by overtaking and remodeling existing science lab freeing up existing Food Service facility for Culinary Arts.
3. Develop Culinary Arts Classroom at existing Food Service Building
4. New Announcers and Concessions Building as well as upgrades to the field facilities.
WishlistDesired Campus Additions/Changes
New Announcers / Field Facilities
New Maintenance and Operations Facility
Existing 1-Story Structure2,200 Sq. Ft.Convert Existing Food Service into Culinary Arts
C a m p u s P h a s i n g P l a n
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 9NTS
S i t e P l a n - P h a s i n g P l a nNORTH
0. Interim Housing
Phase 0
1A. New (2) story Classroom Bldg to replace portables @ 700’s1B. New Science Lab Bldg to replace portables @ 700’s1C. New Videoconference Center1D. Tech and AC upgrades 600’s & 700’s
Phase 1
2A. Tech and AC upgrades 800’s2B. Tech and AC upgrades 500’s2C. Tech and AC upgrades 400’s2D. Tech and AC upgrades 300’s
Phase 2MEDIA CENTER
ADMIN
PAC1100s
M & O
INTERIM HOUSING
Interim Housing
Interim Housing & Upgrades
UpgradesGYM
300s
200s
400s
500s
700s
600s
800s
900s
1300s
3A. New (1) Story Field House to replace portables3A. Minor Renovations 200’s3B. Tech upgrade Admin, Gym & 1300’s3C. Tech and AC upgrades 900’s, and Theater3D. Wishlist: New M and O Building, Upgrade Field Facilities including Announcers Box
Phase 3New Buildings, and Upgrades
NEW FIELD HOUSE
(2A)
(1A)(1B)
(1D)
(2B)
(2C)
(2D)
(1C)
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 10
NORTH S i t e P l a n
O v e r a l l S i t e P l a n
30 150
Site Additions/Changes
Technology Facilities1. New Videoconference Center2. Renovated 6th Quad
Counseling Building1. Renovated Interior and Exterior Space
700s Quad1. New (2) Story Classroom Building to replace portables (12 new classrooms total)2. New (1) Story Science Building to replace portables (2 new science labs total)
Athletics1. New Field House2. Repaired Announcers Bldg.3. Field Improvements
Exterior Quads1. New plantings & Hardscapes2. New Outdoor Teaching Areas
A.
B.
C.
D.
E.
A
B
C
D
E
Existing BuildingNew Building
E
E
E
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 11
NORTH V i d e o c o n f e r e n c e C e n t e r
V i d e o c o n f e r e n c e C e n t e r
Classroom
Videoconference Center
Key Map
6th QuadThe “Meadow”
Existing Classroom Bldg
Theater
Arts and Technology Building
Classroom
Classroom
Roof Below
Second Level
Ground Level
5 20
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 12
NORTH
5 20
N e w C l a s s r o o m B u i l d i n g a n d S c i e n c e L a b s
Science Lab
Classroom, Typ.
Key Map
C l a s s r o o m B l d g a n d S c i e n c e L a b s
Science Lab
Prep. Room
Existing Science Labs
Existing Science Labs Existing
Science Labs
Second Story Identical
Ground Level
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 13
NORTH F i e l d H o u s e P l a n
F i e l d H o u s e
Key Map
Court
Covered Entry
Flex Room
Stor.
Weights/Cardio
Existing GymExisting Courts
6 12 24
La Costa Canyon High School Master PlanSan Dieguito Union High School DistrictPage 14
NORTH S i t e S e c t i o n s
S i t e S e c t i o n s
NTS
Key Map
Section B
Classroom
C
Classroom
Chaparral Quad
Section A
Section C
B
A
CourtStorage Cardio
Court
Gym Beyond