Page 1: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

L. PontecorvoL. Pontecorvo

MDT Status: Installation and Commissioning

5

1 9

8

7

643

2

10

11

16

15 1

412

Missing 9 stationsMissing 9 stationsMissing 9 stationsMissing 9 stations

Page 2: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

2

OutlineOutlineOutlineOutline

Installation and infrastructure status

Commissioning Status

Sector Commissioning strategy

Integration with other ATLAS sub-detectors

Results from Toroid run in November

Page 3: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

3

Installation and services

Page 4: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

4

Installation and PositioningInstallation and PositioningInstallation and PositioningInstallation and Positioning

673/682 installed: 673/682 installed: missing 6 sideA + 3 side missing 6 sideA + 3 side

C C

After installation on the After installation on the rails must be rails must be positioned positioned

specs:~2mm; 2mradspecs:~2mm; 2mrad

Main limitationsMain limitations: : Interference with other Interference with other sub-sub-systems servicessystems services and and access access

Very tricky: BIR/BIMVery tricky: BIR/BIM in in sectors 11 and 15sectors 11 and 15 andand BMS BMS all all sectors and sectors and BOL/BOSBOL/BOS external external chamberschambersIt goes It goes very fastvery fast once we once we have have access + OK from TCaccess + OK from TC

575/682575/682~84% of the barrel is ~84% of the barrel is positionedpositioned

673/682 installed: 673/682 installed: missing 6 sideA + 3 side missing 6 sideA + 3 side

C C

After installation on the After installation on the rails must be rails must be positioned positioned

specs:~2mm; 2mradspecs:~2mm; 2mrad

Main limitationsMain limitations: : Interference with other Interference with other sub-sub-systems servicessystems services and and access access

Very tricky: BIR/BIMVery tricky: BIR/BIM in in sectors 11 and 15sectors 11 and 15 andand BMS BMS all all sectors and sectors and BOL/BOSBOL/BOS external external chamberschambersIt goes It goes very fastvery fast once we once we have have access + OK from TCaccess + OK from TC

575/682575/682~84% of the barrel is ~84% of the barrel is positionedpositioned

Gray: not installedGray: not installedLight green: installedLight green: installedDark green: installed Dark green: installed AND positionedAND positioned

Gray: not installedGray: not installedLight green: installedLight green: installedDark green: installed Dark green: installed AND positionedAND positioned

Feet r

egion

Page 5: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

5

Cables and Gas Cables and Gas Cables and Gas Cables and Gas

All MDT optical and control cables

(~200) from USA15 to barrel PP

installed in 2005

- All patch panels installed

- All Alignment,

- All CANBUS DCS cables

- All MDT RO and TTC fibers

All LV and HV cables installed

All DCS daisy chain installed on

positioned sectors

> 70 % of Optical patch cords

installed

Rack dressing for upper sectors well under way

Page 6: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

6

Gas system statusGas system statusGas system statusGas system status

All manifolds and valves

installed

15 UX racks operational

All (~300) pneumatic valves

ok;

All barrel racks equipped with

zeolite filters

Connection of chambers to

manifold following chamber

positioning

Systematic leak tests of combined system using PVSS control:

Leaks found in:BIS S2: two chambersBIS S8: one chamber RepairedBIS S10: five chambersBOL S1: not identified yet BOLS15 Repaired

Page 7: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

7

Power supply: LV/HVPower supply: LV/HVPower supply: LV/HVPower supply: LV/HV

In 2007 CAEN will deliver:

80% of RPC and barrel LVL1 PS (HV/LV)

80% of TGC

40% of the LV for MDT

25% of the HV for MDT-CSC

MDT Commissioning issues:

HV/LV boards for sectors 5 & 6 Available

Need more boards for the commissioning of other

sectors

Follo

wed by A. L

anza

Page 8: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

8

Commissioning

Page 9: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

9

USA15 - DCS and AlignmentUSA15 - DCS and AlignmentUSA15 - DCS and AlignmentUSA15 - DCS and Alignment

TTC Crates ready both for Barrel and

End-Cap (E. Pasqualucci)

All ROD-ROB fibers routed (Italian

Techs)

CANbus PS and DCS PCs for all

Barrel

Full Barrel alignment system

HV-LV DCS-PCs for Barrel (also for

RPCs) (P. Valente, G. Aielli)

Sectors 5, 6, 3A & 4A RODS are

available and cabled

Page 10: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

10

Commissioning StrategyCommissioning StrategyCommissioning StrategyCommissioning Strategy

All stations arrived at ATLAS after cosmic ray certification and All stations arrived at ATLAS after cosmic ray certification and retested at SX1 (now dismissed)retested at SX1 (now dismissed)

Due to Due to late availabilitylate availability of services of services level-by-levellevel-by-level strategy adopted strategy adopted in the pitin the pit

Level I:Level I: fast test of station integrity: gas tightness, broken wires Level II:Level II: check basic functionalities with provisional services:

DCS, FE elx. behavior, in some cases also noise runs

Level III:Level III: check full functionality and sign-off of complete sectors – done only when final services available final services available MDT+RPC/LVL1MDT+RPC/LVL1:

Full test up to cosmic ray runFirst determination of optimal working pointDead channels maps, …

After Level III Full SECTORS ready to be integrated After Level III Full SECTORS ready to be integrated in ATLAS: commissioning Phase IIin ATLAS: commissioning Phase II

Page 11: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

11

MDT test up to MDT test up to Level IILevel IIMDT test up to MDT test up to Level IILevel II

MDT: 216/630 tested Mainly Inner

chamber difficult to access later (BIL and BIS)

Up to now test done using provisional services

Since January moved to final services sector 5 and 6 DONE with FINAL services

Many problems found and fixed: mainly damaged components: ELMB, CSM, cables, fibers,…

Page 12: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

12

LVL IIILVL III -Full Sectors commissioning schedule -Full Sectors commissioning scheduleLVL IIILVL III -Full Sectors commissioning schedule -Full Sectors commissioning schedule

Constraints Possibility/Access to position stationsAvailability of services + CAEN Power supplies

Strategy: start from top sectors Schedule

Sector 5 and 6: April/May (Under way) Sectors: 3–4 7-8 1-2 9-10 13-14-12 11-15-16 Month: June July Aug Sept Oct. Nov.

PS schedule: October ‘07 ~80% of RPC/LVL1 and only 40% of MDT LV expected: After sector 5/6 move around “Jolly” set of CAEN boards to

commission all other sectors (depending on delivery from CAEN)

Only part of the barrel integrated in ATLAS by fall 2007

Page 13: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

13

Phase II commissioning: Integration in Phase II commissioning: Integration in ATLASATLAS

Phase II commissioning: Integration in Phase II commissioning: Integration in ATLASATLAS

Integration of sector 13 in March combined ATLAS run: MDT: ROD-ROS readout – HV/LV DCS integrated RPC/LVL1: VME readout – muon trigger via MUTCPI-CTP

Starting from June integrate sector 5A & 6A (after we have commissioned it): Use these sectors as benchmark for phase II to

include all final features needed in ATLAS: DCS, DSS, chamber initialization, configuration DB, high level muon trigger, Data analisys

1 FULL CAEN PS set left on this sector

Other sectors can be added later once are signed off depending on PS availability

Page 14: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

14

MDT HV-LV DCS integrationMDT HV-LV DCS integrationMDT HV-LV DCS integrationMDT HV-LV DCS integration

MDT HV-LV DCS succesfully integrated in Central DCS.

1 PC, 1 branch controller, 1 PC, 1 branch controller,

6 boards in 4 crates in 6 boards in 4 crates in

UX15 UX15

Controlled from ATLAS Controlled from ATLAS

Global Control Station Global Control Station

Project almost completed still to be finalized:

ArchivingArchiving

Configuration databaseConfiguration database

Condition database Condition database

INFN- University of Athens joint project

Page 15: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

Results from Sector 13 cosmic ray test with Magnetic Field

Page 16: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

16

Full weekend of data taking with 13 feet chambers Full weekend of data taking with 13 feet chambers during the Barrel Toroid test in Novemberduring the Barrel Toroid test in November

13 Muon stations read-out

LVL1 muon Trigger provided by 3 BML RPC/LVL1 and distributed via MUCTPI + CTP to muon system

Sector 13 run: set upSector 13 run: set upSector 13 run: set upSector 13 run: set up

BIL

BML

BOL

BOFBOF

BIL 1BIL 3 BIL 2

BOF1BOF3

BML 3

BOL 3

Side A

Page 17: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

17

Sector 13 dataSector 13 dataSector 13 dataSector 13 data

Sector 13 cosmic data used as benchmark to test commissioning procedures for sector sign-offMDT:

NoiseDead channelsDrift behaviorPreliminary alignment

RPC/LVL1:NoiseEfficiencyWorking point optimizationLVL1 timing

Automatic tools to perform stations sign-off under preparation

Page 18: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

18

MDT Inefficient tubes from chamber profile

Silvia Franchino (INFN Pavia)

dead tubes

Page 19: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

19

MDT Noise rates

Silvia Franchino (INFN Pavia) 15 / 12 / 2006

t< t0

per ogni tubo:

GNAM result

Online monitoring

Typical physical background in barrel ~10kHz

1.4% occupancy

Offline analysis

Page 20: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

20

Impact of magnetic field on MDT driftImpact of magnetic field on MDT driftImpact of magnetic field on MDT driftImpact of magnetic field on MDT drift

B field expected to change drift-to-radius relationship by Lorentz angleB field expected to change drift-to-radius relationship by Lorentz angle

Page 21: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

21

Installation and Commissioning Installation and Commissioning CoordinationCoordination

Installation and Commissioning Installation and Commissioning CoordinationCoordination

Overall coordination: F. Cerutti (INFN) & L. Pontecorvo (INFN)

Run coordination: S. Vlachos (CERN) & D. Boscherini (INFN)

MDT DCS: P.Valente (INFN) S. Zimmermann (Friburg)

Gas MDT: T. Meyer (CERN)

RPC DCS : G. Aielli (INFN)

Gas RPC: R. De Asmundis (INFN)

DAQ: E. Pasqualucci (INFN)

Trigger: S. Veneziano (INFN)

Service Installation: A. Lanza (INFN)

Page 22: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

22

ConclusionsConclusionsConclusionsConclusions

Installation almost completedleft over only due to interference with other

detectors or unavailability of BOG chambers Services Installation:

Cabling almost finished moving to rack dressing DCS, Alignment and DAQ systems well under way. Level III Sector commissioning starting now

Very tight schedule and shortage of final power supply.

Sectors will be available for integration in ATLAS Toroid test with cosmic rays showed good results

Page 23: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

23

Richieste finanziarieRichieste finanziarieRichieste finanziarieRichieste finanziarie

Nuovo finanziamento per contratti con CAEN (Lettera Referee di A. Lanza):

55 KEuro per contratto per manutenzione software e aggiornamento firmaware

12.5 KEuro per Filtri sul sistema di potenza Costruzioni apparati : Pavia

Page 24: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

24

Back Up-Slides

Page 25: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

25

Alignment CommissioningAlignment CommissioningAlignment CommissioningAlignment Commissioning

Systematic check of the 5817 optical lines has started: Difficulties: mainly conflicts with gas-pipes, cable

trays, support structure,…Main emphasis now on the 117 projective lines

(backbone of the Barrel alignment) ~only 20 lines are working today… Clashes with struts found in 28 cases

Page 26: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

26

Cabling IICabling IICabling IICabling II

Inner Layer Cabling of inner layer is mostly done 244 LV, 488 HV cables, 244 alignment, 448 pairs

of optical patch cords in total All HV, LV alignment cables installed DCS daisy chain installed on positioned sectors Almost all of RO&TTC patch cords installed.

Midlle Layer 178 LV, 356 HV, 178 alignment cables, 356 pairs

of optical patch cords All LV and HV cables installed DCS Daisy chain installed on positioned sectors ~75% of RO&TTC patch cords installed,

installation is ongoing

Page 27: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

27

Cabling IIICabling IIICabling IIICabling III

Outer Layer Cabling of MDT outer layer is mostly done 202 LV, 404 HV cables, 202 alignment, 404 pairs of

optical patch cords in total All HV, LV and alignment cables installed, few HV

cables still to be re-arranged DCS Daisy chain installed on positioned sectors ~75% of RO&TTC patch cords installed, installation

is ongoing

Page 28: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

28

Leak TestLeak TestLeak TestLeak Test Systematic leak tests of combined system using PVSS control:

Tested until now: (red = test currently underway) (315 in total)

BIS: S2, S4, S6, S8, S10, S16BMS: S2, S4, S6, S8, S10, S16

BML: S3, S5, S7, S13BOL: S1, S3, S5, S7, S9, S11, S15BOF/BOG: S14

Work still to start on : BIL, BIR, BIM, BOS, EIL4 Leaks found in:

BIS S2: two chambersBIS S8: one chamber RepairedBIS S10: five chambersBOL S1: not identified yet BOLS15 Repaired

All other leaks (mostly in plumbing) identified and corrected.Ongoing work:Connect remaining chambers (~33%) to valves (ongoing - 3 months).Finish leak tests (synchronous with chamber connection)Repair work according to damage found.

Page 29: L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations

29

Muon DAQ IntegrationMuon DAQ IntegrationMuon DAQ IntegrationMuon DAQ Integration

Sector 13A + 2 chambers of sector 52 crates, 3 MROD

11 MDT chamber2 ROS, 3 s-link

RPC SL board, 1 crateROD emulator usedTTC signals sent through ROD prototypeConnected to ROS via Ethernet

Muons + Calorimeters +CTP+MUCTPI partition built MDT online histogram viewed by OHP Connection to Data Quality desk