l-band test stands in esb carsten hast test facilities department helps to develop and test...

Download L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures

If you can't read please download the document

Upload: ramon-gadd

Post on 11-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1

L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures and power sources as well as beam optical, diagnostic and collimation systems. Operates and supports the large test facilities at SLAC End Station B NLCTA X-Band RF L-band RF SNS and Marx Test Stands End Station A FACET Contributions to ATF/ATF2 program at KEK Support for LCLS hard- and software development People Five engineering physicists, two technicians Slide 2 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 2 End Station B (ESB) Slide 3 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 3 Marx Test Stand Marx Modulator Slide 4 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 4 Marx Test Stand Toshiba MB Klystron Slide 5 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 5 Marx Test Stand Needed to install a new electrical and cooling water infrastructure Slide 6 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 6 Marx Test Stand *Control system for the klystron based on the new Fast Fault Finder F3-Boards. *F3-boards have fast inputs to monitor RF and to turn power off within the pulse if a fault occurs *F3-boards have slow inputs which monitor the conventional systems (water flow, temperature, magnets, heater, vacuum, etc.). *Needed to develop several different styles of signal conditioning and processing. *Slow control is backed with a conventional approach using relays Slide 7 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 7 Marx Test Stand Slide 8 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 8 Marx Test Stand Current Status *Marx Modulator functionality and safety systems were thoroughly checked out *Klystron F3-slow control and relay based interlock systems were tested and certified *Currently finishing a firm ware upgrade in the Marx control software *Need to perform spark down tests and verify the F3-boards fast interlocks *In about 2 weeks will connect Marx to the MB klystron Slide 9 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 9 SNS Test Stand SNS Modulator Slide 10 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 10 SNS Test Stand Klystron and Controls Slide 11 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 11 SNS Test Stand Test area in NLCTAand in ESB Slide 12 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 12 B-Target Room and ESB for KC and CTO Testing Slide 13 SLAC ART Review April 29 - 30, 2009 Carsten Hast ARD-TF Department Page 13 End Station B (ESB) You are welcome to see all that tomorrow morning during a tour of ESB