kwv project examples 1
TRANSCRIPT
KIRBY VIEHLAND 8801 VIRGINIA LANE KANSAS CITY, MISSOURI 64114 – 816.572.8123 – [email protected]
Project Experience:
March 2007 – January 2015 PGAV Architects – Westwood, KS (PGAV Destinations – St. Louis)
Blue Valley Recreation Center – Overland Park Kansas
Addition to and renovation of existing metal building into facility for basketball, volleyball, and general fitness.
FEMA Storm Shelter. Code review, preparation of Construction Documents, coordinate specification and product
selection, consultant coordination
1900 West 47th Place – Westwood Kansas
Addition to and renovation of existing office space and new parking deck. Preparation of Construction Documents,
coordinate specifications and product selection, consultant coordination, construction administration
Colossal Curl – Adventure Island – Tampa Florida
Replacement of water slide with new water ride.
Project Architect: Preparation of Construction Documents, consultant coordination.
Space Shuttle Atlantis – Kennedy Space Center Visitor Complex – Cape Canaveral Florida
Addition to existing Launch Experience building to house Space Shuttle Atlantis. Preparation of Construction
Documents, consultant coordination, back of house Shuttle access, elevators and decorative railings.
SeaWorld Aquatica – San Antonio
Renovation of entire waterpark new bathing and restroom building. Preparation of Construction Documents,
consultant coordination, adaption of design criteria to several buildings.
KIRBY VIEHLAND 8801 VIRGINIA LANE KANSAS CITY, MISSOURI 64114 – 816.572.8123 – [email protected]
Wonders of Wildlife/Bass Pro Shops – Springfield Missouri
Addition to and renovation of existing museum, new convention center, and new connector/mall building.
Preparation of Construction Documents, Material Selections, consultant and BPS design coordination, animal life
support systems and tanks coordination, FEMA Storm Shelter, site final development plans, parking calculations,
construction administration
Baker Life Science Classroom Building – Baldwin City Kansas
Addition to and total renovation of existing science building. Project Architect: Design Development space
planning with staff, catalog existing equipment, preparation of Construction Documents, construction administration
Al Ain Animal Park – Emirate of Abu Dhabi, United Arab Emirates
New Animal Park. Preparation of Construction Documents, consultant coordination, animal life support systems,
unique building system
St. Louis Science Center Boeing Hall – St. Louis Missouri
Addition to existing science center building with green roof. Project Architect: Preparation of Construction
Documents, consultant coordination.
University of Oklahoma Stephenson Life Sciences
New Life Science Research Building. Project Architect: Design Development space planning with staff,
preparation of Construction Documents, consultant coordination, Construction Administration.
KIRBY VIEHLAND 8801 VIRGINIA LANE KANSAS CITY, MISSOURI 64114 – 816.572.8123 – [email protected]
July 2005 – March 2007 Peckham & Wright Architects – Columbia Missouri
HuHot Mongolian Grill – Columbia Missouri
New freestanding restaurant building, Project Architect: Exterior Design, preparation of Construction Documents,
consultant coordination, franchise design coordination, consultant coordination, construction administration
Missouri Credit Union (Mizzou Credit Union) – Jefferson City Missouri, Columbia Missouri
New freestanding branch banks. Project Architect: Design, preparation of Construction Documents, consultant
coordination, construction coordination
Columbia Fire Department – Columbia Missouri
Station 1 – Apparatus bay addition and headquarter renovation. Project Architect
Station 2 – Raised roof and lengthened apparatus bay and interior renovations. Project Architect
Station 7 – New Station LEED Silver, Associate Designer, Schematic Design
Machens BMW – Columbia Missouri
Renovation of existing dealership to BMW dealership. Preparation of Construction Document, consultant
coordination, adaptation of BMW standards, Construction Administration
January 1999 – November 2004 Simon Oswald Associates – Columbia, MO
Summer 1998 Intern Architect
Missouri Employer Mutual Corporate Headquarters – Columbia Missouri
New corporate headquarters buildings. Project Architect: Preparation of Construction Documents, consultant
coordination
Public School Retirement Systems of Missouri Headquarters – Jefferson City Missouri
New corporate headquarters building. Associate Designer/Project Architect: Design Development, preparation
of Construction Documents, consultant coordination, Construction Administration
First National Bank (Landmark Bank) – Columbia Missouri, Gunter Texas
New branch banks. Associate Designer/Project Architect: Design Development, preparation of Construction
Documents, consultant coordination, Construction Administration
Boone Hospital Center – Columbia Missouri
Various renovations of units. Project Architect: Schematic Design, Design Development, Construction
Documents, Construction Administration
Miller’s Professional Imaging – Columbia Missouri
New digital photo processing lab. Project Architect: Schematic Design, Design Development, Construction
Documents, fast track project