kuzu sunu2013rev.pptx

51

Upload: mehmet-emre-bastopcu

Post on 05-Dec-2014

135 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: KUZU SUNU2013rev.pptx
Page 2: KUZU SUNU2013rev.pptx

KUZU GROUP Founded in 1943 by Abdülkerim KUZU in

Siirt. One of the Major Contractors in Turkey Projects completed and in progress exceed a

value of billions of USD. More than 250 projects and millions m2 of

construction area built by 2010. 55.000 dwelings: Giant Housing Project in

Parand & Pardis-Tehran – IRAN – 6.000.000 m2 “Maskan Mehr”

Major Wastewater Plant Private Operator and Contractor

Offices in Ankara, İstanbul and Siirt

Page 3: KUZU SUNU2013rev.pptx

Mass Housing (10.000s of dwellings for TOKİ)

Luxury Housing Projects

Educational Facilities

Governmental Buildings

Hospitals

Business and Shopping Centers

Wastewater Treatment Plants…

KUZU GROUP

Page 4: KUZU SUNU2013rev.pptx

Recent Hospital Projects (2012-2013)

SİİRT and MARDİN STATE HOSPITALS(each with 300 beds capacity)

Page 5: KUZU SUNU2013rev.pptx

MASS HOUSINGMAJOR CONTRACTING PROJECTS

Page 6: KUZU SUNU2013rev.pptx

Spradon Projects / Bahçeşehir

1.957 luxury dwellings + 1.037 more to come…

Page 7: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU SPRADON HOUSES 320 units /

ISTANBUL

Page 8: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU SPRADON HOUSES 320 units /

ISTANBUL

Page 9: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU SPRADON TOWERS 413 units /

ISTANBUL

Page 10: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU SPRADON TOWERS 413 units /

ISTANBUL

Page 11: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU SPRADON TERRACES & RESIDENCE 179 units /

ISTANBUL

Page 12: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU SPRADON QUARZT 1.045 units /

ISTANBUL

Page 13: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU -2013 SPRADON VADI 1.037 units/

ISTANBUL

Page 14: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU PARKVADI / ANKARA

www.parkvadi.com

Page 15: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU

PARKVADI / ANKARAwww.parkvadi.com

Page 16: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU DİVAN RESIDENCE 740 / ISTANBUL

Page 17: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU DİVAN RESIDENCE & MALL / ANKARA

www.divankonutlari.com

Page 18: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU BATIKENT EVLERİ / ANKARA

www.batievleri.com

Page 19: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU ETİPARK MALL / ANKARA

www.etipark.com

Page 20: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU JEWELLERY CITY / ISTANBUL

www.kuyumcukent.com.tr

Page 21: KUZU SUNU2013rev.pptx

MASS HOUSING Projects by KUZU

Page 22: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU KAYABAŞI 3.120 units / İSTANBUL

TOKI (T. R. Prime Ministry Mass Housing Authority)

Page 23: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU GÜLTEPE DWELLINGS / ANKARA

TOKI (T. R. Prime Ministry Mass Housing Authority)

Page 24: KUZU SUNU2013rev.pptx

Some Recent Projects by KUZU MAMAK DWELLINGS / ANKARA

TOKI (T. R. Prime Ministry Mass Housing Authority)

Page 25: KUZU SUNU2013rev.pptx

MASS HOUSING Projects by KUZU YUVAM IZMIT 416 units / IZMIT

Page 26: KUZU SUNU2013rev.pptx

MASS HOUSING Projects by KUZU TOKI UZUNDERE 616 units / IZMIR

Page 27: KUZU SUNU2013rev.pptx

MASS HOUSING Projects by KUZU

Parand/ Tehran IRAN 20.000 completed in 2010-2012

Page 28: KUZU SUNU2013rev.pptx

MASS HOUSING Projects by KUZU

NEW PARDIS Project – 35.000 units in 2013

Page 29: KUZU SUNU2013rev.pptx

WASTEWATER TREATMENT PLANT

OPERATION & MAINTENANCE

Page 30: KUZU SUNU2013rev.pptx

KUZU GROUP - İSTANBUL

Operating all of the ISKI (Istanbul Water and Sewage Administration) Wastewater Treatment Plants in Istanbul. 3.000.000 m3/day – 15.000.000 million PE since 2003.

Operation of 41 Advanced -Biological Plants, 9 Pretreatment Plants and 65 Pumping Stations

Over 500 technically qualified personnel working for Istanbul 7/24

Responsible for Operation-Maintenance-Repair and Renovation of the WWT Plants.

Page 31: KUZU SUNU2013rev.pptx

İSTANBUL WWT Plants Operated by KUZU

Page 32: KUZU SUNU2013rev.pptx

Some of the Major ISKI WWTPs Operated by KUZU Group

Baltalimanı - 625.000 m3/d

Kadıköy – 833.000 m3/d

Yenikapı - 873.000 m3/d

Küçüksu- 400.000 m3/d

Paşabahçe- 350.000 m3/d

Tuzla Biological –

250.000 m3/d

Page 33: KUZU SUNU2013rev.pptx

KUZU GROUP - BURSA Operating all of the BUSKİ (Bursa Water

and Sewage Administration) Wastewater Treatment Plants in Bursa. 500.000 m3/day – 2.500.000 million PE since 2012.

Operation of 3 Advanced -Biological Plants (one of them MSW leachate)4 Pretreatment Plants and 5 Pumping Stations5 Package Treatment Plants

Over 200 technically qualified personnel working for Bursa 7/24

Responsible for Operation-Maintenance-Repair and Renovation of the WWT Plants.

Page 34: KUZU SUNU2013rev.pptx

Major BURSA WWT Plants Operated by KUZU

Page 35: KUZU SUNU2013rev.pptx

Some of the Major BUSKİ WWTPs Operated by KUZU Group

Bursa Batı WWTP, 165.000 m3/d

Bursa Doğu WWTP, 245.000 m3/d

Bursa Hamitler MSW Leachate Treatment Plant, 1.000 m3/d

Page 36: KUZU SUNU2013rev.pptx

GEBZE WWT Plant Operated by KUZU as PPP(incl. electricity cost)

KUZU GROUP - GEBZE

Page 37: KUZU SUNU2013rev.pptx

İSU GEBZE WWTP Operated by KUZU Group

Gebze WWTP, 144.000 m3/d, comissioning: 2012

Page 38: KUZU SUNU2013rev.pptx

WASTEWATER TREATMENT PLANT

DESIGN-BUILD-OPERATE

Page 39: KUZU SUNU2013rev.pptx

High End Technologies

Advanced Biological Treatment (C, N,P) Fine Bubble Diffused Aeration by Turbo

Blowers Mechanical Dewatering by Decanter

Centrifuges Thermal Sludge Drying - Cogeneration Sand Filtration – UV Disinfection – WW

REUSE ODOR Removal by Ozone, Chemical

Scrubber, Biofiltration UF and NF by Submerged Membranes SCADA Automation

Page 40: KUZU SUNU2013rev.pptx

WATER REUSE (100.000 m3/day)

Page 41: KUZU SUNU2013rev.pptx

TURNKEY DBO

Page 42: KUZU SUNU2013rev.pptx

PAŞAKÖY A.B. WWTP 2. Phase (100.000 m3/day)

Page 43: KUZU SUNU2013rev.pptx

PAŞAKÖY WWTP 2. Phase

CAPACITY: 2. Phase 100.000 m3/day and 250.000 PE (started operation: 2009)

PROCESS: The system consists of pretreatment, biological phosphorus removal, denitrification, nitrification thru extended aeration and final clarifiers. Thus carbon, nitrogen and phosphorus removal is achieved. Additionally there are sludge drying with CHP and UV disinfection facilities at the discharge.

OBJECTIVES:1- Advanced biological treatment , protecting Ömerli

reservoir.2- Thermal sludge drying (200ton/day), dry product (50

ton/day)3- Thermal energy by Gas Turbine Cogeneration (1x4,6 MW)4- Sand filtration – UV disinfection (100.000 m3/day, zero

FC )5- Odor removal by Biofiltration.

Page 44: KUZU SUNU2013rev.pptx

TUZLA A.B. WWTP 2. Phase (100.000 m3/day)

Page 45: KUZU SUNU2013rev.pptx

TUZLA A.B. WWTP 2. Phase

CAPACITY: 2. Phase 100.000 m3/day and 500.000 PE (started operation: 2009)

PROCESS: The system consists of pretreatment, biological phosphorus removal, denitrification, nitrification thru extended aeration and final clarifiers. Thus carbon, nitrogen and phosphorus removal is achieved. Additionally there are sludge drying with CHP, anaerobic sludge digestion and odor removal ozonation facilities.

OBJECTIVES:1- Advanced biological treatment , protecting Marmara Sea.2- Thermal sludge drying (300ton/day), dry product (75

ton/day)3- Thermal energy by Gas Turbine Cogeneration (2x4,6 MW)4- Anaerobic Sludge Digestors (4x8.000 m3) for Biogas5- Odor removal by Ozonation..

Page 46: KUZU SUNU2013rev.pptx

DÜZCE A.B. WWTP 2. Phase (50.000 m3/day)

Page 47: KUZU SUNU2013rev.pptx

DÜZCE A.B. WWTP 2. Phase

“FASTEST IN TURKEY:50.000 m3/day ADVANCED BIOLOGICAL WASTEWATERTREATMENT PLANT CONSTRUCTED READY FOR

OPERATIONIN A RECORD CONSTRUCTION TIME OF JUST 120 DAYS.” CAPACITY: 2. Phase 50.000 m3/day and 125.000 PE

(started operation: 2009) PROCESS: The system consists of pretreatment, biological

phosphorus removal, denitrification, nitrification thru extended aeration and final clarification. Thus carbon, nitrogen and phosphorus removal is achieved.

OBJECTIVES:Advanced biological treatment of all wastewater collected in Düzce, posing apollution threat to Melen River which had become a major source of potable water for the city of Istanbul following recent infrastructure investments.

Page 48: KUZU SUNU2013rev.pptx

ANTALYA Hurma WWTP Extension

Page 49: KUZU SUNU2013rev.pptx

ANTALYA Hurma WWTP Extension

“A SIGNIFICANT REFERENCE PROJECT FINANCED BY THE WORLDBANK”

CAPACITY: 2. Phase 135.000 m3/day and 675.000 PE (started operation: 2011)

PROCESS: The system consists of pretreatment, primary clarifiers, biological phosphorus removal, denitrification, nitrification thru extended aeration and final clarifiers. Thus carbon, nitrogen and phosphorus removal is achieved. Additionally there are, anaerobic sludge digestion, biogas treatment-storage-power gen., and odor removal chemical scrubber facilities.

OBJECTIVES:1- Advanced biological treatment , protecting the Antalya

Konyaaltı Coastline.2- Anaerobic Sludge Digestors (4x9.000 m3) for Biogas3- Odor removal by Chemical Scrubbers.

Page 50: KUZU SUNU2013rev.pptx

İSKİ Büyükçekmece WWTP-

130.000 m3/d under construction (2013-2015)

Page 51: KUZU SUNU2013rev.pptx

KUZU GROUPWe have been Constructing for a Better Life for

more than 60 years…

Adding its vast experience and knowledge obtained during the management of WWT Plants to its past

business experiences, KUZU Group gains the vision of

DESIGNING –BUILDING and OPERATING

Wastewater Treatment Plants with greater efficiency and less cost.

THANK YOU…