kuliah pp waduk-kurva massa dan sequent peak (ke-5)
TRANSCRIPT
1
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Dr.Eng Donny Harisuseno, ST., MT
MATERI:
Penentuan Tampungan EfektifPenentuan Tampungan EfektifPenentuan Tampungan EfektifPenentuan Tampungan Efektif
Sub Materi:Sub Materi:Sub Materi:Sub Materi:
Metode Kurva Massa dan Metode Sequent PeakMetode Kurva Massa dan Metode Sequent PeakMetode Kurva Massa dan Metode Sequent PeakMetode Kurva Massa dan Metode Sequent Peak
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
2
Analisa
Tampungan
Efektif Waduk
Metode periode kritis (Critical period
method)
1. Metode Kurva Massa
3. Metode Alexander
4. Metode Dincer
5. Metode Gamma-Gould
2. Metode Sequent Peak
2
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Dr.Eng Donny Harisuseno, ST., MT
Sub Materi:
KURVA MASSA (DIAGRAM RIPPL)KURVA MASSA (DIAGRAM RIPPL)KURVA MASSA (DIAGRAM RIPPL)KURVA MASSA (DIAGRAM RIPPL)
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
4
Metode KurvaMassa (Mass Curve)
Periode Kritisdidefinisikan sebagai“selang waktu antarakondisi waduk penuhdan kondisi wadukkosong”
Termasuk kelompok teknik periode kritis
Saat awal Periode Kritisadalah “waduk dalamkondisi penuh, dan saatakhir Periode Kritisadalah waduk dalamkondisi kosong untukpertama kalinya”
3
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
� A mass curve procedure (Rippl Diagram) is one of the
earliest methods for estimating the size of storage
required to meet a given draft (lepasan)
� A mass curve is constructed by plotting the
accumulative monthly or yearly inflow and draft
against time
� Demand curves are straight lines having a slope equal
to the demand rate which is uniform
� Demand lines drawn tangent to the high points of the
mass curve represent rates of withdrawal from the
reservoir.
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Contoh Diagram Rippl
6Debit inflow historis Lepasan = 50 juta m3 per bulan
4
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Asumsi Metode Kurva Massa
7
1. Pada awalnya, waduk dalam keadaan penuh, yang berartipada awal periode kritis,
2. Dalam menggunakan seri data debit historis, dianggapdalam masa mendatang tidak akan terjadi kondisikekeringan yang lebih jelek lagi.
1. Sederhana dan mudah dimengerti2. Metode kurva massa sudah memperhitungkan
pengaruh musiman, autokorelasi antar data historis,dalam analisa penentuan kapasitas tampungankarena analisa kurva massa menggunakan datahistoris
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Keterbatasan Metode Kurva Massa
8
1. Lepasan biasanya dianggap konstan.
2. Kapasitas tampungan yang diestimasi dengan Kurva Massa semakin besar dengan semakin panjangnya seri data historis yang digunakan.
3. Metode ini tidak memperhitungkan kehilanganevaporasi netto
5
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Contoh Diagram Rippl
9Debit inflow historis Lepasan = 50 juta m3 per bulan
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Langkah-Langkah Prosedur Kurva Massa (Diagram Rippl)
10
1. Untuk site waduk/bendungan yang telah diusulkan, gambarkan kurvamassa dari debit historis. Kurva massa ini merupakan garis debit historis kumulatif. Pada umumnya yang digunakan adalah debit historis bulanan atau tahunan,
Dalam contoh yang ditampilkan, simpangan terbesar adalah C2 = 1081 juta m3. Jadi untuk memenuhi kebutuhan Lepasan sebesar 50 juta m3 per bulan, dibutuhkan tampungan aktif waduk sebesar 1081 juta m3.
2. Tambahkan garis lepasan kumulatif (cumulative draft line) dari waduk. Setiap garis lepasan kumulatif inimenyinggung satu punggungkurva massa dari debit historis,
3. Ukur simpangan terbesar antara kurva massa dan garis lepasankumulatif. Simpangan terbesar ini merupakan tampungan wadukyang dibutuhkan.
6
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Rippl method
Lepasan (R) = 3,
Tampungan aktif yang dibutuhkan
= 40 – 35 = 5
Lepasan (R) = 4,
Tampungan aktif yang dibutuhkan
= 45 – 35 = 10
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
From the Figure, the
intercept C2 is greater than
C1, and therefore the design
capacity would be taken as
C2 (=150,000 m3). From the
figure, it can be seen that the
reservoir is full at A, begins
to empty from A to B, and
refills from B to C. From C to
D, the reservoir spills, and
again, the content falls until it
just empties at E. The critical
drawdown period, D to E,
for this example is
approximately 28 months.
Limpahan (spillout), C-D
Periode pengambilan air dari tampungan (A-B)
Periode pengisian (B-C)
7
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
13
Berapakah kapasitas waduk yang dibutuhkan untuk memastikan produksi sebesar 75000 acre-ft/th untuk aliran masuk yang diperlihatkan pada gambar disamping?
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Rippl Method Qt Rt
Capacity K
Accumulated Releases, ΣR
Accumulated Inflows, ΣQ
8
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Dr.Eng Donny Harisuseno, ST., MT
Sub Materi:
SEQUENT PEAKSEQUENT PEAKSEQUENT PEAKSEQUENT PEAK
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”16
Kebutuhantampunganbulanan
=
Inflow Bulanan – Lepasan Bulanan + Kebutuhan TampunganBulan lalu
Selalu non-positip. Apabila hasilnya positip, makadianggap = 0
Tampunganwaduk yang dibutuhkan
= Maks.Nilai absolut dari
Kebutuhantampungan bulanan
9
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Contoh Soal (1): Metode Sequent
Peak
17
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Lanjutan…Metode Sequent Peak
18
10
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Contoh Soal :
20
Persediaan air suatu kota dipompa dari sumur ke dalam waduk distribusi. Perkiraan kebutuhan air jam-jaman untuk hari maksimum diperlihatkan pada tabel di samping.
Bila pompa bekerja dengan laju seragam, berapakah kapasitas waduk distribusi yang dibutuhkan?
11
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Contoh Soal :
21
Diketahui inflow yang masuk dan lepasan (draft, release) dalam (juta m3) pada rencana sebuah waduk adalah sebagai berikut:
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Lanjutan……..
22
Hitung:Kapasitas kapasitas tampungan efektif waduk dengan: a) Diagram Ripple (Mass Curve, Kurva Massa)b) Metode Sequent Peak
12
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Penyelesaian:
23
a. Diagram Ripple
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Gambar Diagram Ripple:
24
13
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
b. Metode sequent peak
25
Jurusan Teknik Pengairan-FTUB
Kuliah PP. Waduk-Dr.Eng Donny Harisuseno, ST., MT “....thinks correctly n smartly...success!!”
Lanjutan……..
26
Diambil nilai negatifyang terbesar.
Jadi, kapasitastampungan aktif = 136 juta m3
KapasitasTampunganWaduk: