kribi region development project chris holtslag lilli linkola jan wouter vorderman gerald wegh...
TRANSCRIPT
![Page 1: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/1.jpg)
Kribi region development project
Chris Holtslag
Lilli Linkola
Jan Wouter Vorderman
Gerald Wegh
Supervisor
Gijsbert Korevaar
Interdisciplinaire Project Groups “IPG” IE3620
Anna Corriol
Egbert van den Berg
Ivo van Vliet
![Page 2: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/2.jpg)
Contents
• Introduction
• The Area
• Methods (Backcasting)
• Research so far
• To Do’s
![Page 3: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/3.jpg)
About us
Name
Age
Nationality
Background
Name
Age
Nationality
Background
Jan Wouter Vorderman
22
Dutch
Sustainable Molecular
Science and Technology
Lilli Linkola
24
Finish
Civil and
Environmental
Engineering
Chris Holtslag
26
Dutch
Industrial Design
Gerald Wegh
24
Dutch
Chemical Engineering
About usAbout us
![Page 4: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/4.jpg)
Government Cameroon
Ministry of Economy and Spatial Planning
Steering Comittee
Goals:
- Protect environment
- Exploit area
- Develop country
-Boost economy
Source: www.cia.gov/library/publications/dhe-world-factbook
Population 18.5M (estimate)
![Page 5: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/5.jpg)
Royal Haskoning
AimsTo win the tender by creating a project proposal for the sustainable development of a whole (Greenfield) area, by providing:
• (Advanced) solutions for the development of an industrial zone (to be an eco-industrial park).• Concept solutions/proposal for the development of the whole area in a sustainable way. • Develop a “model concept” of sustainable industrial development for developing countries.
![Page 6: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/6.jpg)
Systems thinking
Sustainable Solutions
Integration of Social, Environmental and Technical disciplines
(People, Planet, Prosperity)
The Industrial Ecology approach
![Page 7: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/7.jpg)
Our Goal
We gain experience of applying Industrial Ecology principles and integrating them in a real case by doing this project.
This project proposal should help and/or inspire Royal Haskoning to win the call for tender proposed by the Cameroon government for the development of the industrial zone and maybe later the development of the whole area.
![Page 8: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/8.jpg)
The Area
![Page 9: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/9.jpg)
Backcasting overview
![Page 10: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/10.jpg)
Backcasting 2
Analysing the present situation:Existence (current problems)
Resources (Stakeholder inventory)
Incentives (existing projects)
![Page 11: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/11.jpg)
Backcasting 3
Envision possible future situations:Eco-Industrial Complex
Local Environmental Rehabilitation
100% Renewable Energy
Integration of the government ideals and local lives
Population welfare: richness of culture/healthcare/education
![Page 12: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/12.jpg)
Backcasting 4
• Build scenarios– Create concepts for the industrial site– Elaborate on local social issues (eg. providing jobs,
healthcare, education & sanitary solutions)– Feasability and cost estimation
• Think about implementation of the project (Especially in organisational and financing terms)
![Page 13: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/13.jpg)
Researched
•Stakeholders•Renewable energy potential•Aluminium refinery integration•General facts and resources of the country•Indigenous people•Water management Kribi area
![Page 14: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/14.jpg)
Draft Stakeholders
People ProfitMinistry Rio Tinto Alcan
Steering Committee Plantations
Indigenous People Other Companies
Future workforce (Port, Gas, Coastal sand, Foresters)
Planet
NGO’s
Ecotourism
![Page 15: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/15.jpg)
Renewables
SolarPossibilities mainly in off grid appliancesGeothermalMain sources north of the areaWindNot much on land, offshore possibleBiofuelsAlgae possible, maybe classical biofuelsHydroAlready being build, possibilities for extending this effort
![Page 16: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/16.jpg)
Renewables
![Page 17: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/17.jpg)
Renewables
![Page 18: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/18.jpg)
Aluminium refinery
Input: Output:
Bauxite Aluminium
Energy Heat
Water Wastewater
Possibilities:
Integrating industry
Generate electricity
Utilize waste heat
Bauxite mining in the country
![Page 19: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/19.jpg)
Opportunities in the Country
Kyoto ProtocolCameroon has signed the protocol,
carbon trading possible
Millennium goalsThe trend in the country is that they
get closer to reaching the goals.
Development is made with both
educational, health and poverty
goals
![Page 20: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/20.jpg)
Indigenous people Hunter Gatherers Tourist attraction
though they rarely benefit
• Indigenous People Plan (IPP)
• Minorities should be specifically
• protected (land rights for the Pygmies)
![Page 21: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/21.jpg)
To Do
Make the scenarios for the backcastingMake a preliminary plan of the developement of
the Industrial zone Interviews with experts & research on
• CO2 (trading)• Similar projects• Logistics• Eco Tourism• Ecology and biodiversity
![Page 22: Kribi region development project Chris Holtslag Lilli Linkola Jan Wouter Vorderman Gerald Wegh Supervisor Gijsbert Korevaar Interdisciplinaire Project](https://reader036.vdocuments.mx/reader036/viewer/2022062720/56649f065503460f94c1bd3a/html5/thumbnails/22.jpg)
other ideas?