Goal and Period of KASS Program
1
2
[Period] 5 Phases in 8 Years (2014 - 2022)
• Phase A (Oct. 2014-Jun. 2015): System Definition
• Phase B (Jul. 2015-Mar. 2017): System Design
• Phase C (Apr. 2017-Mar. 2019): Critical Design
• Phase D (Apr. 2019-Jun. 2020): Integration and Verification
• Phase E (Jul. 2020-Oct. 2022): Initial Operation and Approval Process
[Program Participants]
• Supervising Agency (MOLIT, KAIA), KASS Program Office, KARI, ETRI, TASF, KT, Ktsat
2
Organizational Structure related with KASS
Inspection Organization
(KIAST, TTA)
KPO GNSS center(KSP) Not established yet
International Co-development
Contract
MOLIT: Ministry of Land, Infrastructure, and Transport IO : Inspection Organization (KIAST, TTA) KPO: KASS Program Office, KARI KSP: KASS Service Provider ESSP : European Satellite Services Provider EASA: European Aviation Safety Agency
KASS Handover
KASS development
EASA
System Qualification
MOLIT
KASS operation
consulting
Private Company (like ESSP)
Designate
Domestic Co-development
KASS Program
3
KASS System Architecture
S/S (Sub System)
Qty. (Baseli
ne)
KRS (KASS Reference
Station)
7
GEO satellite 2
KUS (KASS Uplink
Station)
3
KCS (KASS Control
Station)
2
KPS (KASS Processing
Station)
2
KUS 1 (Master)
KUS 3 (Master)
KRS Channel 2(B)
KRS Channel 1(A) KCS(Master)
KCS(Backup)
KPS 1
KPS 2
GEO 1
GEO 2
GPS satellites
7 KRS Sites
L1 L2 L5
L band
L1 /L2
SBAS Message
GEO
SBAS Message
GEO
L1 /L2
L1 /L2
L1 /L2
KUS 2 (Backup)
L band C band
C band
L band
C band
L band
4
Sites and Satellites for KASS system
: KRS
: KCS & KPS
: KUS
: GEO satellite
Legend
The survey was conducted for about 2 years in order to select the best sites.
(KRS : 60 locations → 7 locations, KUS : 14 locations → 2 locations)
5
GEO and SBAS payload Acquisition Status
`18 `19 `20 `21 `22 `23 `24 `25 `26
Acquisition (lease) Plan
1st GEO
2nd GEO
SoL (Oct., 2022)
3Q, 2021
ktsat-Airbus
Korean GEO (Not
Confirmed)
For Test and Open Service(KPO) For SoL Service(MOLIT)
6
OS (2Q, 2022)
PRN code acquisition
※ SMC/GP (Space and Missile system Center / Global Positioning systems directorate)
SMC/GP has assigned the PRN code (134) to KASS for use on L1 C/A & L5
7
IPKP - Open Service Performance
Assessed availability performance is more than 99%
Availability, HNSE and VNSE are calculated applying failure ratio of GPS, GEO and Ground
segment(KR, KPS, KUS and Data Networks).
※ LM (Land Mass) : South Korea Peninsula + Jeju Island
1.57 m 1.64 m
※ KASS APVI 99% availability Region
8
Republic of Korea’s SBAS Concept
9
Organizational Structure of KASS Operation
• System Operation
(24hours – 7days) • 1st Level
Maintenance • ILS Management
• KASS O&M, Engineering System Management
• Certification Management
• KASS Service Improvement and Developing New Service
• Performance Monitoring and Analysis
• 2nd Level Maintenance
• KASS Improvement
• Developing next step SBAS
• KASS Operation Management
• SLA management • NOTAM , System
Inspection
• GNSS Service Provision
• Signing of SLA and cooperation with related organizations
• International cooperation
GNSS Center
(MOLIT]
Dept. of KASS
Operation
Dept. of GNSS Policy
Planning
KASS Operation Office Head
(Delegated Private Company)
KASS Service Management
Team
KASS O&M Team
KASS SoL Engineerin
g Team
Government Section
Private company Section
KSP(KASS Service Provider) organization chart - Draft
10
Future Plan
MOLIT will perform system and operation certification (commission) in 2022
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ~
Operation (GNSS Center with Private Company)
Development (KPO)
Certification (MOLIT)
System Design System IVQ
System Operation Support
Establishing KASS Service Provider
SQR (Oct., 2022)
1st GEO (3Q, 2021)
System Certification
Modify Regulation for Operation Approval
Operation Approval
SoL Service
Provision
SoL Initial Operation
System Design Verification (Safety Case A Review)
Open Service Provision(GEO)
Develop Safety-related Work Procedures and Tools
(Safety Case B)
Develop/Implement SBAS Procedures
11
Back-up Slide
KASS Operation Approval(Designating Operation Company) - Draft
System(Design) Certification
Designate of Operation Company
By Inspecting Safety Case B
(EC Regulation 1035, 552, 482, etc)
Safety Case A Take Over From
KPO
Operation Approval
Safety Case A submission
Complete
Safety Case A
KPO
Performance
Inspection
(ICAO ANNEX 10, DO-178B)
Inspection Organization
Private company (Applicant for KASS Operation)
Safety Case B Take Over From
Private Company
Complete
Safety Case B
Safety Case B submission
Safety Case A Handover
GNSS Center(MOLIT)
13