kodak- sap manufacturing industry forum v2
DESCRIPTION
SAP Manufacturing Industry Forum v2TRANSCRIPT
Eastman Kodak Company’s
SAP PLM Implementation
Case Study
April 16, 2014
Keith Satterfield
2 ©Eastman Kodak Company, 2014
Presenter
Keith Satterfield, IT Director
• Eastman Kodak Company
• Dayton, Ohio
• 30 years of IT experience
• 10 years of working with SAP
• Directed Commercial Inkjet Printing PLM Initiative
3 ©Eastman Kodak Company, 2014
SAP PLM at Kodak
In the graphic communications industry, Kodak serves
customers in the printing, publishing, packaging, and
enterprise markets with intelligent solutions for
competitive advantage and greater return on
investment.
Needing a solution to achieve scalable integration with
its global logistics system with seamless access, Kodak
selected SAP as the central PLM system with direct
CAD Integration for its Commercial Inkjet Printing
Business.
4 ©Eastman Kodak Company, 2014
• Challenges and Objectives of PLM Initiative
• SolidWorks® Integration with SAP
• SolidWorks 2013 Migration
• Benefits
Agenda
5 ©Eastman Kodak Company, 2014
Challenges
• Product Design Teams in Multiple Locations
– Rochester, New York
– Dayton, Ohio
– Asia
• Highly Complex Products
– Nearly 3,200 unique parts and 13,000 BOM items
– Multiple Vaulting Systems
– Duplicate Data
– No Common Change Process
• Large Amount of Legacy Data
6 ©Eastman Kodak Company, 2014
Objectives
• Reduce process defects and engineering design cycle time for
Kodak’s commercial inkjet products
• Provide a method to effectively manage aggressive
development and product release cycles, perform and track
cost-reduction activities, and perform change management
across both internal and external manufacturing and design
resources
• Deliverables
– Product data management
– Mechanical CAD integration with SolidWorks
– ECO process and workflow management
– Engineering design/change collaboration
• Establish foundation for future product design
7 ©Eastman Kodak Company, 2014
Document (DMS)
Collaboration
CAD Integration
Cost Estimates
Enabler Previous Current/Future
Single Source of Product
Information
Collaborative Design
through Strategic
Partners
Simulated Product
Costing
Early Procurement of
Materials in Design
Inaccurate Product
Design Information
Long Product Design
Cycles
Delayed Product Cost
Information during
Design
Introduction of
Products to Supply
Chain Takes Too
Long
Solution
Process Change
8 ©Eastman Kodak Company, 2014
SAP PLM SolidWorks Integration
Content
Server
Material Material BOM ECM Documents
DMS
Doc Info Rec
SAP
SAP CAD
Desktop
CIDEON Integration
9 ©Eastman Kodak Company, 2014
SAP CAD Desktop
• CAD Desktop is a powerful tool that brings together views of
information stored in both the SAP and CAD systems
• Document structures in SAP reflect the originals in SolidWorks
• SolidWorks defines the complete structure and transfers it to the
SAP system through the direct integration
• CAD Desktop provides several views of the CAD documents
– SAP View – shows what is stored in SAP
– CAD View – shows the current active SolidWorks document
– CAD Work List – shows all open SolidWorks documents
– CAD Working Directory – shows files in personal work directory
– Document List – shows documents based on search criteria
10 ©Eastman Kodak Company, 2014
CAD Desktop ‒ SAP View
• Shows the SAP structure of the last active CAD document
11 ©Eastman Kodak Company, 2014
CAD Desktop ‒ CAD View
• Shows the SAP structure of the CAD document currently being processed
in the CAD system
12 ©Eastman Kodak Company, 2014
Design Engineer Works from Familiar Interface
• Integration launched as SolidWorks Add-in
13 ©Eastman Kodak Company, 2014
Design Engineer Works from Familiar Interface
• SAP’s user-specific options added to SolidWorks menu
14 ©Eastman Kodak Company, 2014
Design Engineer Works from Familiar Interface
• SAP’s user-specific options added to SolidWorks menu
15 ©Eastman Kodak Company, 2014
CIDEON Conversion Engine
• CIDEON Conversion Engine for SAP PLM is a key
component of the Kodak SAP Solution
• The Conversion Engine creates neutral files (JPG,
PDF, JT) of each CAD file for viewing in various
applications
– For Kodak this includes the SAP GUI, SAP
EasyDMS, and the SAP Engineering Portal
– SAP Portal provides access to relevant documents
(SolidWorks, neutral files, procedures, etc.) for key
suppliers
16 ©Eastman Kodak Company, 2014
Conversion
Engine
CIDEON Conversion Engine
Status Network
CK- Check In
FZ - Frozen
PS - Pending
RL - Released
OB - Obsolete
Neutral File Format files created automatically as Solidworks
Document Progresses through the Status Network
Watermark Applied to Reflect Document Status
Title Block Information Updated
17 ©Eastman Kodak Company, 2014
SolidWorks Title Block
• What should show on the Title Block?
– Customizable content
• DIR #, Version, Revision?
• Material revision?
18 ©Eastman Kodak Company, 2014
Data Migration Strategy
PDMWorks
Vault 2
PDMWorks
Vault 1
Manual Save of
Latest Version
Export
Local File
System SAP Content
Server
SAP DIR
CIDEON
Import Utility
Iterative
Process
19 ©Eastman Kodak Company, 2014
SolidWorks Integration Timeline
• SAP PLM Solution Selected March 2011
• CIDEON to Assist with Integration April 2011
• Product Familiarization June 2011
• CIDEON Solution Blueprint October 2011
• CIDEON Solution Realization December 2011
• SolidWorks Integration Go-Live January 2012
• SolidWorks 2013 Migration February 2013
20 ©Eastman Kodak Company, 2014
SolidWorks 2013 Migration
• Upgrade from SW 2010 to SW 2013
• Needed to migrate existing SolidWorks files of various
versions
– SWP ~55K
– SWA ~20K
– SWD ~30K
• CIDEON®- CAD Release-Migration
– Automatic update of the original CAD files to a new
version and data format
– Flexible processing and configuration options
– Consists of two components
• Migration Control Center – controls processing
• One or more Conversion Clients – performs migration
21 ©Eastman Kodak Company, 2014
SolidWorks 2013 Migration
Migration Control Center allows the migration in SAP to be controlled
and monitored from a central location.
Select Documents for Migration
Summary of Migration Status
Filter by Migration Status
22 ©Eastman Kodak Company, 2014
SolidWorks 2013 Migration
Configurable to
create backup of
original
Log file provides information for errors
23 ©Eastman Kodak Company, 2014
Benefits
• Immediate Benefits
– Common and Consistent Change Process
– Single Source of Data
– Global Visibility of Product Information
– Better Document Control
• Benefits We Have Seen Improve over Time
– More Efficient Engineering Change Process
– Standardization of Product Information
– Reduced Errors from Inaccurate Documentation
– Able Track Process Metrics and Performance
24 ©Eastman Kodak Company, 2014
Learnings and Recommendations
• Have a Solid Document Migration Strategy
– Do as Much Data Cleanup as Possible before
Migrating
– How will you deal with missing files?
– Configured Parts/Toolbox
• Training
– DIR vs. Material. Semantics can be confusing
– Plan to spend twice the time that you had expected
• Spend Enough Time to Understand the Tool
25 ©Eastman Kodak Company, 2014
Possible Future Enhancements
• SAP PLM Upgrade
• Add Cache/Content Servers in Regions to Provide Access
• Improve Export of Information to Key Partners
• Add Additional Kodak Products
26 ©Eastman Kodak Company, 2014
Additional Information
• Number of SolidWorks Files Imported ~95K
• SAP ECC 6.0
• Oracle 11.2 DB
• PLM ver 7.01
• Single Content Server
• ~250 PLM Users
• ~50 SolidWorks Users
• Number of SolidWorks Files Migrated to 2013 ~105K
28