knut espen solberg 20 october 2009 wp410 risk and opportunity assessment
TRANSCRIPT
Knut Espen Solberg 20 October 2009
WP410
Risk and Opportunity Assessment
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
2
Oceans of Tomorrow
Oceans offer opportunities for sustainable economic development.
However, human activities are exerting increasing environmental pressure on the oceans, which is threatening marine ecosystems and sustainable maritime activities.
In particular, the growing demand for maritime transport, offshore energy, tourism, coastal development, fisheries and aquaculture, security and surveillance pose a major threat to the marine environment.
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
3
WP410 – Risk Opportunity AssessmentOverall objective
Quantify and assess the total cross-sector impact of the activities in the arctic, and evaluate possible solutions to reduce impact and improve the sustainability of the activities.
Specific Objectives
1. Develop modelling framework for sustainability assessment of Arctic development; including model for evaluating the level of Sustainability for the arctic activity and model for assessing possible measures for improvement.
2. Development of common performance indicators and acceptance criteria.
3. Coordinated data gathering from Theme 3 (impacts).
4. Evaluation of sustainability level and measures for improvement.
Input required
Theme 3 - WP310, WP320 and WP330
Gives input to
WP110, WP120 and WP600
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
4
Sustainable development
Sustainable development seeks to meet the needs and aspiration of the present without compromising the ability to meet those of the future (WCED, 1987)
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
5
Oceans of Tomorrow
Impact Social
Impact Economy
Impact Environment
WP2X0 Theme 2 Theme 3 Theme 4
Drivers
Environment
e.g. CO2
Drivers Economy
e.g. income
Drivers
Social
e.g. unemployment
Inventory
Inventory
Inventory
Inventory
Inventory
Inventory
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
6
WP410 – Risk and Opportunity Assessment
Sustainability for shipping
Environmental sustainability
Impact building phase
Impact operational phase
Impact scrapping phase
Social sustainability
Economic sustainability
Sustainability in the Arctic
Economic sector A
Economic sector B
Economic sector C
Concept for sustainability in the arctic, comprising of three sub-components: environmental, social, economic components – considered across several (generic) economic sectors or activities.
WP310WP330WP320
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
7
Data gathering(per sector)
Etc.
Analysis & Improvements:
Economic
Environmental
Social
Oilspill
Marginal Cost of Averting A Tonne of CO275000 dwt bulker
-100
-50
0
50
100
150
200
0 %
3 %
5 %
8 %
10 %
13 %
15 %
18 %
20 %
23 %
25 %
28 %
30 %
33 %
35 %
CO2 reduction
Co
st
pe
r to
nn
e C
O2
av
ert
ed
(C
AT
CH
)
Wea
ther
rou
tin
g
Op
tim
al t
rim
Sili
con
bas
edco
atin
g
Op
tim
ized
hu
ll d
esig
n
Pre
-sw
irls
tato
r
Pro
pel
ler
po
lish
ing
Kit
e
Ele
ctro
nic
ally
con
tro
lled
eng
ines
Was
teh
eat
75 643Rating
Evaluate alternatives and quantify performance and cost implications
Sustainability Level
Concept overview
Shipping:
Oil/Gas:
Tourism:
Total
Tolerable
Intolerable
Acceptable
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
8
Example of WP410-5 Cost benefit analysis
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
9
WP410 - OverviewTask 1. WP410-1 - Develop generic modelling framework for sustainability assessment of arctic
development
(Leader: DNV, Participants: PIK, BMT)
Task 2. WP410-2 - Development of common performance indicators and acceptance criteria
(Leader: DNV, Participants: DNV, PIK, UC/AL)
Task 3. WP410-3 - Coordinated data gathering from the WP defined in Theme 3, Impact Studies
(Leader: PIK, Participants: DNV, PIK, DNIIMF, CEFAS, UU)
Task 4. WP410-4 - Calculation of sustainable levels for future scenarios
(Leader: PIK, Participants: DNV, PIK, DNIIMF, CEFAS, UU)
Task 5. WP410-5 - Evaluation of measures for improvement
(Leader: PIV, Participants: PIK, BMT)
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
10
WP410 – Risk and Opportunity Assessment
Workpackage number WP410 Start date or starting event:
Month 1
WP Package title: Risk an opportunity assessment
Activity Type RTD Participant number 1 2 3 4 5 6 7 Total Participant short name DNV PIK BMT CNIIMF UC/AL CEFAS UU Person-months per participant:
© Det Norske Veritas AS. All rights reserved.
WP410
20 October 2009
11
Safeguarding life, property and the environment
www.dnv.com