Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 1
GAS
INDUSTRY DEVELOPMENT IN
BRUNEI DARUSSALAM
GAS
INDUSTRY DEVELOPMENT IN
BRUNEI DARUSSALAM
PRESENTATION OUTLINEGAS INDUSTRY DEVELOPMENT IN BRUNEI DARUSSALAM
BRUNEI DARUSSALAM – ABODE OF PEACE
OIL & GAS INDUSTRY CONTRIBUTIONS
KEY PLAYERS IN GAS INDUSTRY
KEY MILESTONES OF GAS INDUSTRY
NATURAL GAS PRODUCTION
NATURAL GAS DEMAND
BRUNEI LNG
GAS INDUSTRY ASPIRATION
OFFERED ACRAEGE
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 2
BRUNEI DARUSSALAM – ABODE OF PEACE
• Politically & Economically Stable.
• Well-positioned and has proximity to existing & potential Asia-Pacific markets.
• More than 70 years experience in upstream E&P activities.
• More than 30 years in LNG Business.
BRUNEIDARUSSALAM
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 3
OIL & GAS INDUSTRY CONTRIBUTIONS
• Country revenue
• Direct employment of 3,500 staffs.
• Indirect employment of large part of workforce.
• Local business development.
• Technology development.
• Promotion of technical and HSEQ Standards.
• Promotion of Bruneian interest.
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 4
KEY PLAYERS IN BRUNEI GAS INDUSTRY
§ Brunei Shell Petroleum (BSP)
§ Block B Joint Venture (BBJV)
§ Brunei LNG (BLNG)
§ Brunei Shell Tankers (BST)
§ Brunei Gas Carrier (BGC)
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 5
AmpAmp
Muara PortMuara Port
Maharaja LelaMaharaja Lela
FairleyFairleyGannetGannetMagpieMagpie
TaliTali
ChampionChampion
RasauRasau
Offshore facilitiesOffshore facilities
Onshore facilitiesOnshore facilities
Power facilitiesPower facilities
Natural Gas pipelineNatural Gas pipeline
Crude Oil or Condensate
pipeline
Crude Oil or Condensate
pipeline
Terminal( SCOT )Terminal( SCOT )SeriaSeria
BANDAR SERI BEGAWAN
BANDAR SERI BEGAWAN
LumutLumut
GadongBerakasJerudong
GadongBerakasJerudong
Refinery10,000
bpd
Refinery10,000
bpd
BLNGBLNG
OPPOPP
Ampa Fairley Rationalization
Project
Ampa Fairley Rationalization
ProjectIron DukeIron Duke
LumutLumutCPPCPP
PRESENT DAY BRUNEI HC INFRASTRUCTURE
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 6
EXISTING CONCESSIONS
• Offshore Concessions 8,618 sq km
- Block A & CD (Shell Deepwater Borneo Ltd., NewCo)
- Block B (TotalFinaElf, Shell Deepwater Borneo ltd., NewCo)
- Others (BSP)
• Land concession 2,624 sq km
- BSP
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 1
NATURAL GAS PRODUCTION
0
5
10
15
20
25
30
35
40
Millio
n Cu
bic M
etre
s/Day
E +06 m3/ d 3. 2 3. 5 5. 4 7 8. 7 10 9. 2 12 20 22 26 30 30 29 26 27 25 24 25 25 26 27 27 28 31 30 30 31 32 32 36
63 64 66 67 68 70 71 72 74 75 76 78 79 80 82 83 85 86 87 89 90 91 93 94 95 97 98 99 01 02 03
2002 - Highest in recorded production history
1999 – Block B Joint Venture start producing & become 2nd gas producer
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 8
e
r
KEY MILESTONES OF GAS INDUSTRY IN BRUNEI
Seria Field
Brunei LNG Ltd/Cold Gas Trading
19291929
19691969
19721972
19931993
1st LNG cargo
19971997
Japan 1st Contract Extension
19981998
19991999
19861986Brunei Shell Tankers
Long-term contract with KOGAS
Brunei Gas Carrier
BBJV
20022002ABADI - 8th LNG Tanker
1972 – 1st LNG cargo1980 – 1000th LNG cargo1987 – 2000th LNG cargo1993 – 3000th LNG cargo1999 – 4000th LNG cargo
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 9
GAS DEMAND - 2002
Total Gas Demand = 0.4173 TCF
§ LNG – 0.3533 TCF, 85%
§ Power generation – 0.0396 TCF, 9%
§ Petroleum operator own use – 0.0244 TCF, 6%
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 10
FUTURE GAS DEMAND
• LNG.
• Power generation.
• Petroleum operator own use.
• Downstream industry.
• LNG plant extension opportunity.
• LNG plant (6th train) expansion opportunity.
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 11
Inland Demand
0
1
2
3
4
5
6
7
8
9
10
Mln
m3/
d
Notional Ind Proj
Tutong PS add.
Berakas PS
DES
COGEN
Historical Data
Power Generation
INLAND GAS DEMAND
2006 – Downstream projects start
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 12
EXISTING LNG PLANT – BRUNEI LNG
• First production in 1972.
• Delivered more than 4,000 B Class Cargoes.
• Production capacity 7.2 MTPA
• Five trains with each capacity of processing 5.3 million m3/day of gas.
• Three storage tanks with total capacity of 176,000 m3. • Long term contract with Japan (6.01 MTPA) and Korea (0.7 MTPA).
• Spot sales to Europe and United States.Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 13
BRUNEI LNG EXPORT
-30
20
70
120
170
220
Num
ber o
f Car
goes
('B C
lass
' Equ
ival
ent)
B C l as s E qui val ent C ar go 1 31 77 106 147 164 159 166 167 159 155 157 160 154 153 156 160 159 159 158 159 165 173 186 185 184 176 186 194 200 204 56
72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03
2002 - Highest in recorded
export history
1993 – 1st contract extension
1997 - KOGAS
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 14
BRUNEI LNG - 2002
2001 – Record: first time 200.3 cargoes delivered
2002 – New Record: 203.5 cargoes delivered
Year 2002 Achievement Deliverable Through:
� More reliable gas supply from gas producers
� Continuous growth of LNG deliveries over the last 4 years
� New outlets: 2 spot cargoes to Spain; 1 spot cargo to U.S.
� No shipping disruptions
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 15
BRUNEI LNG – 2003 OUTLOOK
Absolute top production compares with previous years.
Stretching gas suppliers; maximum delivery.
Firm plans for 207+ B Class Cargoes.
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 16
BRUNEI GAS INDUSTRY GROWTH ASPIRATION
BLNG PLANT EXTENSION = Assets Rejuvenation Plan (ARP)
� Maintain current 7.2 million ton / annum capacity
� Gas require: ~ 7.5 TCF
BLNG PLANT EXPANSION – 6th Train
� 6th Train: world scale capacity: 4 million ton per annum
� First cargo delivery: after 2010
� Gas require: ~ 4.2 TCF
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 17
203320132006 202620200
200
300
LN
G B
-Car
go
/a
EXPANSION4.2 TCF
EXTENSION7.5 TCF
Existing Contracts
210~215
330
BLNG PLANT EXTENSION & EXPANSION
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 18
RECENT DEEPWATER ACREAGE
…the next deepwater activityand opportunities in Brunei
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 19
BLOCK KShell (50%)Conoco(25%) Mitsubishi Corp. (25%)
BLOCK JTotalFinaElf (60%)
BHP Billiton (25%)
Amerada Hess (15%)
OUTCOME OF BIDDING ROUND
Petroleum Unit Global LNG Summit 17 –18 December 2003
BRUNEI DARUSSALAM Washington D.CSlide 20
kmkm
GAS INDUSTRY DEVELOPMENT IN BRUNEI DARUSSALAM
THANK YOU
FOR YOUR ATTENTION
THANK YOU
FOR YOUR ATTENTION