Page 1: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

ISSN: 1848-0993

KEY FIGURES

KLJUČNE BROJKE

2015

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE

Page 2: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

2 3

Mreža autocesta / Motorway network

Duljina mreže po broju trakova / Length by number of lanes

Razvoj mreže / Development of networkPo godinama (km) / By years (km)

Autoceste / Poluautoceste u prometuMotorways / Semi-motorways in service 1.313,8 km

Nove autoceste otvorene u 2015.New motorways opened in 2015 24,4 km

Nove autoceste – otvorenje u 2016.New motorways scheduled in 2016 0 km

Ukupna duljina mostovaTotal length of bridges 38,84 km

Duljina zidova za zaštitu od bukeLength of noise protection walls 93,33 km

2015.

2013.-’14.

2011.-’12.

2009.-’10.

2008.

2007.

2006.

2005.

2004.

2003.

2002.

2001.

2000.

1999.

1998.

1997.

1996.

1991.-’95.

0 200 400 600 800 1.000 1.200 1.400

1.313,8

1.289,4

1.250,7

1.240,7

1.201,3

1.159,9

1.078,9

1.035,2

942,9

747,6

598,6

559,0

540,8

522,5

466,9

418,2

394,3

346,4

Po godinama (km) / By years (km)Otvoreno novih autocesta / New motorways opened to traffic

200

150

100

50

02004. 2005. 2006. 2007. 2008. 2009. 2010. 2011. 2012. 2013. 2014. 2015.

195,3

92,3

43,7

81

41,4 39,4

010

0

32,5

0

24,4

72,5 km

1.220,6 km

20,8 km

2x1 trak / lanes 2x2 traka / lanes 2x3 traka / lanes

Broj mostova / Number of bridges219

Prijelazi za divlje životinje / Crossings for wild animals

14

Page 3: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

4 5

Mreža autocesta / Motorway network

Ukupna duljina tunelaTotal length of tunnels 55,72 km

Udio tunela u ukupnoj mrežiPortion of tunnels in total network 4,2 %Najduži tunel

Mala Kapela A1The longest tunnel 5,8 km

Ukupan broj tunela / Total number of tunnels

51

Ukupno / Total1.313,83 km

Broj nezgoda u tunelima / Number of accidents in tunnels

71

45

6

7> 1 km

3> 2 km

3> 5 km

Udio nezgoda u tunelima u ukupnom broju nezgodaPortion of accidents in tunnels in the total accidents

3,1 %

Dijelom autoceste A1 od Zagreba do Bosiljeva upravlja ARZ / Part of the motorway A1 from Zagreb to Bosiljevo is operated by ARZ

925,80 km

187,03 km

141,00 km

60,00 km

U prometu In service

U izgradnji In construction

U planiranju In project

Page 4: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

Autocesta – poluautocesta / Motorway – Semi motorway U prometu / In service 31/12/2015

Otvoreno / Open in 2015

U izgradnji / In con-struction 31/12/2015

Početak izgradnje / Start of const, in 2016

Ukupno /Total

Otvaranje / Opening in 2016

HRVATSKE AUTOCESTE d.o.o.A1 Bosiljevo 2 – Split – Dubrovnik 415,30 - - - 415,30 -

D532 Spojna cesta Zagvozd – tunel Sv, Ilija – Baška Voda* 7,30 - - 7,30 - Spojna cesta Karamatići – luka Ploče*** - - 1,20 - 1,20

A3 Bregana – Zagreb – Lipovac 306,40 - - - 306,40 - Čvor Lipovljani 1,00 - -

A4 Zagreb – Goričan 96,90 - - - 96,90 -

A5 B. Manastir – Osijek – granica s BiH 58,70 - - - 58,70 - Most Drava - - 2,50 - - - Sredanci – granica s BIH (Svilaj) 3,20 3,20 - - - - Dionica most Drava – čvor Osijek - - 3,80 - - - Most Sava - - - 0,70 - -

A10 Granica BIH – čvor Metković 8,50 - - - 8,50 -

A11 Zagreb – Sisak 32,70 - - - 32,70 - Jakuševec – Velika Gorica jug - 10,00 - - - - Buševec – Lekenik - 11,20 - - - -

D10 Brza cesta Podravski ipsilon - - - - - - Gradec – Križevci*** - - 12,50 - 12,50

D12 Brza cesta Podravski ipsilon - - - - - - Vrbovec – Farkaševac*** - - 10,60 - 10,60Ukupno / Total 925,80 24,40 30,60 1,70 925,80 24,30***

AUTOCESTA RIJEKA-ZAGREB d.d.A1 Bosiljevo 2 – Zagreb 65,25 - - - 65,25 -

A6 Rijeka – Bosiljevo 2 81,25 - - - 81,25 -

A7 Rupa – Matulji – Diračje – Orehovica 28,00 - - - 28,00 -

D102 Most Krk i pristupne ceste 7,19 - - - 7,19 -

D6 Neretić – čvor Novigrad 5,34 5,34Ukupno / Total 187,03 - - - 187,03 -

BINA-ISTRA d.d.A8 Kanfanar – Matulj 64,20 - - - 64,20 -

Kanfanar – Pazin (čvor Rogovići) 18,13 - - - 18,13 - Pazin – Matulji* 46,08 - - 10,68** 46,08 -

A9 Umag – Pula 76,80 - - - 76,80 - Umag – Medaki 41,84 - - - 41,84 - Medaki – Kanfanar 7,36 - - - 7,36 - Kanfanar – Vodnjan jug 20,70 - - 20,70 - Vodnjan jug – Pula 6,90 - 6,90 -

Ukupno / Total 141,00 - - 10,68** 141,00 -

AUTOCESTA ZAGREB-MACELJ d.o.o.A2 Zagreb – Macelj 60,00 - - - 60,00 - Zagreb – Krapina 42,80 - - - 42,80 - Krapina – Macelj 13,40 - - - 13,40 - Dio dionice Krapina – Đurmanec* 3,80* - 3,80Ukupno / Total 60,00 - - - 60,00 -

Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,7010,68** 1.313,83 0,00

*poluautocesta / semi motorway **dopuna do punog profila / upgrade to full motorway profile ***dionice državnih cesta koje gradi HAC / stretches of state roads that HAC is building

Page 5: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

8 9

Društvo Company

%15./14.

%15./14.

Total % 15./14.

HAC 30.971.249 9,35 4.593.990 6,24 8,94

ARZ 17.904.051 5,91 1.991.560 8,68 6,18

BINA-ISTRA 7.810.914 4,85 682.081 4,77 4,84

AZM 5.721.187 5,00 716.557 -0,59 4,35

Ukupno / Total 62.407.401 7,36 7.984.188 6,06 7,21

SVEUKUPNO / TOTAL

70.391.589 7,21

Usluge / Services Promet / Traffic

Benzinske postaje / Filling stations

76svakih /

every 29 km

Odmorišta / Rest areas

128svakih /

every 20 km

Hoteli / Hotels

9

Cafe barovi / Caffe bars

85Restorani / Restaurants

20svakih /

every 49 km

svakih / every 21 km

Dinamički informacijski paneli / VMS

136

COKP Centri održ. i kont. prometa / MTCC Maint. & Traffic Control Centres

27

Parkirališna mjesta LV / Parking places LV

6.746

Parkirališna mjesta TV / Parking places HV

2.122

Broj vozila u područjima naplate / Number of vehicles in toll collection zones

70,4 mil./mio.

Rast broja vozila u područjima naplate / Increase in number of vehicles in toll collection zones

2015. / 2014.7,21 %

Udio LV i TV u ukupnom broju vozila /Portion of LV & HV in total no. of vehicles

88,7 %

11,3 %

Broj intervencija vatrogasnih jedinica / Number of firebrigade interventions

1.620

Broj nadzornih video kamera / Number of CCTV cameras

1.596

Broj ralica / Number of snowplowers

213

Page 6: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

10 11

Broj vozila koja su sudjelovala u nesrećama / Number of vehicles involved in accidents

3.186

Društvo / Company

HAC 10.988 1.784 12.772

ARZ 15.722 1.998 17.720

BINA-ISTRA 21.400 1.868 23.268

AZM 14.819 1.679 16.498

Ukupno / Total 12.990 1.819 14.810

Promet / Traffic Sigurnost / Safety

PGDP po tvrtkama / AADT by companies

Nezgode po tvrtkama / Accidents by companies

Ukupno nezgode po vrstama / Total accidents by type

Broj voznih kilometara / Number of km travelled 106 x km6.973,2

4.204,9 HAC

1.209,5 ARZ

1.197,5 BINA-ISTRA

361,3 AZM

Broj vozila u područjima naplate / Number of vehicles in toll collection zonesU mil. voz. / In Mio. veh.

U RH / In Croatia

Ukupno prometne nezgode / Total traffic accidents2.286

Rast prometnih nezgoda / Increase in traffic accidents

2015. / 2014.5 %

1.770 HAC

315 ARZ

126 AZM

75 BINA-ISTRA

2012. 2013. 2014. 2015.

S poginulima / With fatalities

29 31 21 18

S ozlijeđenima / With injuries

346 308 293 307

S materijalnom štetom / With material damage

1.839 1.823 1.863 1.961

Ukupno / Total 2.214 2.162 2.177 2.286

2012. - 2015.

75

70

65

60

55

50

65,364,7 65,7

70,4

2012. 2013. 2014. 2015.

Page 7: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

12 13

Sigurnost / Safety

Pad broja poginulih / Decrease in fatalities

2015. / 2014.-24 %

Ukupno poginuli / Total of fatalities19

Prometne nezgode službe održavanja / Traffic accidents of Maint. Service Staff

Poginuli prema porijeklu registarske pločice vozila / Fatalities by origin of vehicle registration plates

45

39

25

19

50

40

30

20

10

02012. 2013. 2014. 2015.

Ukupno poginuli / Total of fatalities

5 14

Vozila registrirana izvan RH / International registration plates

Vozila registrirana u RH / Croatian registration plates

Stupanj smrtnosti (109 voz. km)Rate of dead (109 km travelled)2,72

Najčešći uzroci / Most frequent causes:

Prekoračenje brzine / Excess speed

Najčešće posljedice / Most frequent consequences:

Materijalna šteta / Material damage

Broj nesreća pri idealnim uvjetima vožnje / The number of accidents in ideal driving conditions

Broj nesreća uzrokovan prekoračenjem brzine / The number of accidents caused by excess speed

1.639 141

130

Stupanj sigurnosti / Safety ratios

HAC BINA-ISTRA

ARZ AZM RHCroatia

RH %15./14.

Nezgoda s ozlijeđenima / Personal injury rate 50,42 7,51 55,64 44,32 44,03 -1,77

Nezgoda s poginulima / Fatal accident rate 2,85 1,67 1,99 0 2,58 -19,65

Koeficijent poginulih / Rate of dead 3,09 1,67 1,99 0 2,72 -28,81

18

17

1 0

Ukupno / Total

Lakše ozlijeđeni / Injuries without hospitalisation

Teže ozlijeđeni / Injuries with hospitalisation

Poginuli / Fatalities

Najkritičniji dan / The most critical day

Najčešće doba dana za prometne nesreće / The most common time of day for traffic accidents

Najkritičniji mjesec / The most critical month

Subota / Saturday

10 - 14 h

Srpanj / July

2012. - 2015.

Na 109 voz. km / Per 109 km travelled

13 HAC

4 ARZ

2 BINA-ISTRA

0 AZM

Page 8: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

14 15

SMART KARTICE /

SMART CARDS

1,9 %

Porast prihoda od cestarine / Increase in toll revenues

2015. / 2014.6,5 %

Postaje / Plazas

106

Ekonomija / Economy

mil./mio.Ukupan broj transakcija / Total number of transactions

67,75195,2 HAC

70,9 ARZ

24,5 BINA-ISTRA

26,7 AZM

45,87

17,91

Naplata / Toll 726Trakovi / Lanes

ENC / ETC

Pretplatnici / Subscribers

Uređaji / OBUs

7 %18 %Povećanje / Increase

2015. / 2014.

Prihodi od cestarine / Toll revenuesU mil. KN / In Mio. HRK 2012. - 2015.

2.126,50 2.209,14 2.266,912.414,30

2012. 2013. 2014. 2015.

2.500

1.250

0

Udio načina plaćanja u ukupnim transakcijama / Breakdown of transactions by payment mode

GOTOVINA / CASH

54,8 %

KREDITNE KARTICE /

CREDIT CARDS

17,9 %

ENC / ETC

24,7 %

OSTALO / OTHER

0,7 %

U nove dionice / Into new sections

U izgradene dionice / Into existing sections

Prihodi od cestarine (bez PDV-a) / Toll revenues (without VAT) 317,3 mil./mio. eur

Ukupno investicije / Total investments 63,78 mil./mio. eur

Trakovi / Lanes 497Pokrivenost / Coverage 1.253 km

Uređaji / OBUs 446.993Pretplatnici / Subscribers 273.855

(Godišnji prosjek srednjeg deviznog tečaja HNB za 2015. Annual average exchange rate in 2015, Source: Croatian National Bank)1 EUR = 7,61 HRK

Page 9: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

16 17

Ekonomija / Economy

Zaposlenici / Workforce

Ukupno investicije / Total investments

9,90 HAC

2,25 ARZ

3,16 BINA-ISTRA

2,60 AZM

Investicije u izgrađene dionice / Investments into existing sections 17,91 mil./mio. eur

Plan investicija za 2016. / Investment plan for 2016 102,24 mil./mio. eur

Investicije u nove dionice* / Investments into new sections* 45,87 mil./mio. eur

Stalno zaposleni u društvima za autoceste / Permanent workforce in concessionaire companies

267

Zaposlenici društava operatera / Workforce in operating companies

3.206

*AZM, ARZ i BINA-ISTRA nisu imale investicija u nove dionice / *AZM, ARZ and BINA-ISTRA had no investments into new sections

U mil. KN / In Mio. HRK

3000

2000

1000

02012. 2013. 2014. 2015.

1.947 1.849

668,6

485,3

U nove dionice / Into new sections 64,66U izgrađene dionice / Into existing sections 37,59

Ukupan broj zaposlenih na mreži autocesta / Total number of employees on the motorway network

3.473

711

2.762

129

582

138

2.624

206 HAC

41 ARZ

10 BINA-ISTRA

10 AZM

Podjela po društvima / Breakdown by concessionaire companies2012. - 2015.

(Godišnji prosjek srednjeg deviznog tečaja HNB za 2015. Annual average exchange rate in 2015, Source: Croatian National Bank)1 EUR = 7,61 HRK

Page 10: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

18

AZM – Autocesta Zagreb-Macelj d.o.o.

Garićgradska 18, 10 000 Zagreb - HRtel.: + 385 1 36 89 600 fax: + 385 1 36 89 620e-mail: [email protected] www.azm.hr

Miloš Savić Predsjednik Uprave / President of the Managing Board

Dominik Sugnetić Član Uprave / Member of the Managing Board

Zaposlenici / Workforce

Podjela po operaterima / Breakdown by operators

Članovi / Members

Podjela zaposlenika po poslovima / Breakdown of workforce by job

Naplata / Toll collection 1.104Održavanje (bez ophodara) / Maintenance staff (without patrol service) 1.680Ophodari / Patrol service 183Uprava / Management board 17Ostali / Other 222

Širolina 4, 10 000 Zagreb - HR; tel.: + 385 1 65 15 375 e-mail: [email protected], [email protected] www.huka.hr

Davor Mihovilić, Predsjednik Udruge / PresidentJosip Šala, Potpredsjednik Udruge / Vice-president

Izdavač / Publisher: HUKAUređivački odbor / Editorial Board: Davor Mihovilić, glavni i odgovorni urednik / Editor in ChiefBrankica Bajić, tehnička urednica / Technical EditorGrafičko oblikovanje / Graphic design: Modacom plus d.o.o.Fotografije / Photographs: Arhiva HUKATisak / Printed by: Kerschoffset Zagreb d.o.o.Datum izdanja / Published: svibanj 2016. / May 2016

Hrvatska udruga koncesionara za autoceste s naplatom cestarine / The Croatian Association of Toll Motorways Concessionaires

2.857 HAC-ONC (HAC/ARZ)

219 BIUO (BINA-ISTRA)

130 EGIS (AZM)HAC – Hrvatske autoceste d.o.o.

Širolina 4, 10 000 Zagreb - HRtel.: + 385 1 46 94 444 fax: + 385 1 46 94 505e-mail: [email protected] www.hac.hr

Davor Mihovilić Predsjednik Uprave / President of the Managing Board

Marijan Sente Član Uprave / Member of the Managing Board

ARZ – Autocesta Rijeka-Zagreb d.d.

Širolina 4 10 000 Zagreb - HRtel.: + 385 1 65 15 100 fax: + 385 1 65 15 110e-mail: [email protected] www.arz.hr

Josip Šala Direktor / Manager

BINA-ISTRA – Bina-Istra d.d.

Savska cesta 106 10 000 Zagreb - HRtel.: + 385 1 61 38 300 fax: + 385 1 61 38 301e-mail: [email protected] www.bina-istra.com

Dario Silić Generalni direktor / General Manager

1.680 Održavanje (bez ophodara) / Maintenance staff (without patrol service)

1.104 Naplata / Toll collection

183 Ophodari / Patrol service

17 Uprava / Management board

222 Ostali / Other

Page 11: KLJUČNE BROJKE 2015Ukupno sve autoceste, Hrvatska / Total all motorways, Croatia 1.313,83 24,40 30,60 1,70 10,68** 1.313,83 0,00 *poluautocesta / semi motorway **dopuna do punog profila

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE / THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES

www.huka.hr