kl- skema p1
TRANSCRIPT
-
8/8/2019 KL- Skema P1
1/3
ENGINEERING TECHNOLOGY 2010
MARKING SCHEME PAPER 1 SPM TRIAL EXAM
No. of
QuestionAnswer Marks
1. XX
1m1m1m
2.
i) Energy / Time / Machine / equipment / RawMaterials / Cost / Capital / Skill / information
Tenaga / Masa / Mesin / Peralatan / Bahan mentah / Modal /Kos / Kemahiran / Maklumat
(ii) Distribution of work / Managing / Forging / Blending / Mixing /
Separating / Designing Mengagih tugas / Mengurus / Menempa / Mengaduh /Mencampur / Mengasing / Mereka bentuk
(iii) Pollution / Market / After sale service / Product / Waste Material Pencemaran / Pasaran / Khidmat selepas jualan / Produk /
Bahan buangan
1m
1m
1m
3. P : Major diameter Garis pusat majorQ : Minor diameter Garis pusat minorR : Pitch Pic
1m
1m
1m
4. (i) Bench drill Mesin gerudi meja(ii) Upright drill Mesin gerudi lantai(iii) Hand drill / Electric drill Mesin gerudi mudah alih
1m
1m
1m
5. A = Drilling MachineB = Milling MachineC = Taper TurningD = Lathe Machine
1m1m1m1m
6. CEBA
1m1m1m1m
7. , X, 1m X 38. 4,2,1,3 1m X 4
9. C, B, A 1m X 310. 2, 7, 4, 3, 1, 6, 8, 5 1m X 5
-
8/8/2019 KL- Skema P1
2/3
11. B D A C 1m X 412. Rectifier 1 : full wave rectifier
Rectifier 2 : bridge rectifier1m1m
13. 1m
1m
1m
14. i- A: AM Transmitter/Penghantar AM
ii- B: FM Transmitter/Penghantar FM
iii- C: FM Receiver/Penerima FM
1m
1m
1m15. B, D , C, A 1m X 416. i- X
ii- Wiii- Y
1m1m1m
17.
X X
1m1m1m1m
18. a) 330 GB
b) 3 GBc) 2.80 GHz
1m1m1m
19. a) - reverse bias- forward bias
b) allow current flow in one direction/ as a rectifier/ detectinformation signal in radio receiver, voltage stabilizer, as an
indicator (automatic) light detector
1m1m
1m1m
20. X
1m1m
21. (i) Filter (ii) By-pass
1m1m
22. P R S Q
1m1m1m1m
23. K
M L
1m
1m1m
-
8/8/2019 KL- Skema P1
3/3
24. X X
1m1m
1m25. D, C, A, B 1m X 4
26. X , / 1m X 2m27. i- 88.480
ii- 89.325iii- 88.875iv- 89.390
1m1m1m1m
28. i- Bii- Ciii- A
1m1m1m
29. TorsionCompressive
Tensileshearing
1m
1m1m30. C
AB
1m1m1m