kitchen cabinet detail scale 1:20 - university of...
TRANSCRIPT
GSPublisherEngine 0.22.100.100
NOTESArchitectural1. All dimensions are in milimetres unlessotherwise specified.2. All dimensions should be checked on siteand any discrepancies be reported to thearchitect before work commences.3. All works to be carried out in accordancewith the local authority regulations.
11. Foundation depth to be determined onsite as per engineer's instructions.
Mechanical Works1. All sanitary fittings, doors, and windowsto schedules.2. All plumbing and drainage to comply with city council's specifications.3. All service ducts to be accessible fromevery floor.4. SVP denotes soil vent pipe to beprovided at the head of drainage.
REMARKSDATES SIGN
Project Title
Job No
Scale
Drawing Title
Drawing No
Drawn By
Checked By
Date
12/PK/UoN/2015
1:10, 1:20
Details
20/02/2015
Arch Ralwala
Njenga James-B76/3607/2011
PK/UoN/2015
5. walls below 200mm thick to be reinforcedwith hoop iron at every alternate course.6. DPC to be laid under all walls and to bemin. 150mm above finished floor level.7. All drainage pipes passing under buildingand drive way to be encased with 150mmthick concrete sorround.
10. 500 gauge polythene dpm (damp proofmembrane) and anti-termite treatment to beprovided under ground floor concrete slab.
2. All soils on cut embarkments to bestabilised. Slope not to exceed the naturalangle of repose.3. All slabs at ground level to be pouredover 1000 gauge polythene sheeting on50mm stone blinding on hardcore.Structural Works1. All black cotton soils to be removed fromall building plinths. All buildings to be clearof black cotton soil to a distance of 3m.
2. All paved surfaces to be clear of blackcotton soil to a distance of 500mm outsidethe edge of the surface.3. Refer to structural Engineer's detail forall R.C works.
4. Use figured dimensions only, do not scalethe drawing.
8. All inspection Chambers (IC) in drivewaysto heavy duty covershave.9. All reinforced concrete works is to be inaccordance with structural engineer's detail.
12. Permanent Ventilation (pv) to beprovided on all openings as indicated onplans.Civil Works1. All soils under slabs and around externalfoundations to treated for termite control.
Proposed Kindergarten
1,200 3,300 1,200 200
150
3,10
0
103
220
400
200
200
400
150
1,40
015
01,
400
150
Eas
t Ele
vatio
n
Riser=103 mmTread=220 mmWaist=150 mm
6Y12 @200 c/c16Y10 @200 c/c Binders
6Y12 @200 c/c16Y10 @200 c/c Binders
Stair Reinforcement DetailScale 1:10
25 500 500 25 500 500 25 500 500 25
25 500 500 25 500 500 25 500 500 25100
2575
025
600
2560
025
5020
0
600
200
270222
38 50
200
2,70
050
01,
800
900
1,80
090
0
40 500 40 500 40 50040
500 40
2,200
2,70
0
2,200
40 500 40 500 40 50040
500 40
9,78
019
02,
905
125
350
2,20
0
100
900
75
S-0
1S
-01
20mm based plaster until300 below ground level
50mm thick blindingmix 1:4:8
600 x 200mm reinforcedconcrete strip with concretemix 1:2:4
precast paving slab
200 mm thick, medium dressed stonewith horizontal pointing
Concrete coping to detail
50mm blinding, mix 1:4:8precast concrete coping
Concrete coping to detail
Precast Concretecoping detail
Boundary wall detailScale 1:20
Boundary wall detailScale 1:20
25mm blockboardpainted to approval
Kitchen cabinet detailScale 1:20
100mm high massconcrete plinth
Mirror
Open Space
25mm thick mdfkitchen cabinet
25mm thick mdfkitchen wall cabinet
Wash hand basin detailfor staff washroomsScale 1:20
100mm high massconcrete plinth
100mm high massconcrete plinth Wadrobe details
Scale 1:20